1 |
00156/2023 |
03/02/2023
|
17/11/2023
|
Mrudula Vijayendra |
SOBHA LIMITED |
Bengaluru Urban |
1. Rs. 30,000/= to be paid back to me by Sobha. 2. They delayed the payment big time and I demand interest charges for the delay |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Disposed before lok adalat |
|
2 |
CMP/UR/200628/0005939 |
28/06/2020
|
11/10/2023
|
YOGISH KALLURAYA ESHWARA |
MAAZ DAWOOD |
Bengaluru Urban |
Looking for my total dues refund with interest amount |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Disposed before lok adalat |
|
3 |
CMP/180620/0000935 |
20/06/2018
|
09/09/2023
|
Santosh Kumar Jaiswal |
VASATHI HOUSING LTD |
Bengaluru Urban |
12% delay compesation and early possession |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok Adalat. |
|
4 |
CMP/181203/0001710 |
03/12/2018
|
09/09/2023
|
MRS. VEENA MANJA |
ZUARI INFRAWORLD INDIA LIMITED |
Bengaluru Urban |
Direct Respondent to pay Rs.75,17,392 and interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok Adalat |
|
5 |
CMP/190822/0003920 |
22/08/2019
|
09/09/2023
|
SANGEETHA Y RAJAGOPAL |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Interest of eachmonths delay, deliveryofappartment |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok Adalat |
|
6 |
CMP/220116/0008801 |
16/01/2022
|
09/09/2023
|
Shadagopan Eyunni |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Bengaluru Urban |
CANCELLATION AND REFUND IN FULL WITH INTEREST AND PENALTY |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter settled in Lok Adalat |
|
7 |
CMP/220116/0008798 |
16/01/2022
|
09/09/2023
|
DR RANJAN SARKAR |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Bengaluru Urban |
CANCELLATION AND REFUND IN FULL WITH COMPENSATION AND INTEREST |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter is settled in Lok Adalat. |
|
8 |
CMP/220520/0009499 |
20/05/2022
|
09/09/2023
|
Vaibhav Shah, Rekha Kirit Shah and Kirit U Shah |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund and compensation. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter is settled in Lok Adalat. |
|
9 |
CMP/220317/0009145 |
17/03/2022
|
09/09/2023
|
Praveen R |
Shashwati Realty Pvt Ltd |
Bengaluru Urban |
Delay compansition and full amount refund |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter settled in Lok Adalat |
|
10 |
CMP/200917/0006610 |
17/09/2020
|
09/09/2023
|
Udaykiran Suragani |
SHASHWATI REALTY PVT LTD |
Bengaluru Urban |
Compensation for the delay position with appropriate interest and give orders to the builder for the quick progress on the construction process to hand over the position as early as possible. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled in Lok Adalat. |
|
11 |
01197/2023 |
27/07/2023
|
09/09/2023
|
AMIT KUMAR |
ARSIS DEVELOPERS PVT LTD |
Bengaluru Urban |
I want RERA to intervene in this matter and a provide me guarantee of Rent of RS 30000 at-least being paid to me from June 2022 till the date when possession happens. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled in Lok Adalat. |
|
12 |
CMP/210309/0007767 |
09/03/2021
|
09/09/2023
|
SATHISH N PRABHU |
LILY REALTY PVT LTD |
Bengaluru Urban |
Delay compensation of Rs. 7,57,444/- and not to cause harassment until completion of apartment in accordance with Construction Agreement and direction to handover apartment within specified time limit |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter settled in Lok Adalat. |
|
13 |
00837/2023 |
29/05/2023
|
09/09/2023
|
P SHRAVAN KUMAR |
ARSIS DEVELOPERS PVT LTD |
Bengaluru Urban |
I request you to take necessary action as early as possible on the builder to pay Rs.25,000.00 per month to me as rent compensation starting from Jan-2022 onwards. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled in Lok Adalat. |
|
14 |
CMP/181129/0001690 |
29/11/2018
|
09/09/2023
|
MR.NARASIMHA MANJA |
ZUARI INFRAWORLD INDIA LIMITED |
Bengaluru Urban |
Direct Respondent to pay Rs.75,17,392 and interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter settled in Lok Adalat. |
|
15 |
01005/2023 |
28/06/2023
|
09/09/2023
|
VALARAM S PANCHAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delayed flat no Mg 2703 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter settled in Lok Adalat |
|
16 |
01277/2023 |
22/08/2023
|
07/09/2023
|
Anup Narayana E |
SOBHA LIMITED |
Bengaluru Urban |
I kindly request your assistance in facilitating the refund of my booking amount, which amounts to 9,22,698/-. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before lok adalat |
|
17 |
01192/2023 |
26/07/2023
|
05/09/2023
|
Bandlamudi Anil Kumar |
Sobha Limited |
Bengaluru Urban |
Request RERA officials to help us to get our refund asap as refund team is saying that refund can be done once resale is completed |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before lok adalat |
|
18 |
CMP/220804/0009851 |
04/08/2022
|
23/08/2023
|
JANARDHAN PALLIKKATTIRI |
VSan Infrastructure Pvt Ltd |
Bengaluru Urban |
REFUND OF ENTIRE AMOUNT WITH 12% INTEREST PER ANNUM AND WHATEVER COMPENSATION THE RESPECTED FORUM FIND DEEMED SUITABLE |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Settled before lok adalath |
|
19 |
CMP/180403/0000644 |
03/04/2018
|
08/07/2023
|
Reshma Salik |
THE GREENS PHASE I |
Bengaluru Urban |
Return of payment with penalty. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter has been settled before Lok-Adalat. |
|
20 |
CMP/180808/0001123 |
08/08/2018
|
08/07/2023
|
Tanmoy Dey |
MULBERRY MIST |
Bengaluru Urban |
Quick delivery of project along with compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter has been settled before Lok-Adalat. |
|
21 |
CMP/180827/0001184 |
27/08/2018
|
08/07/2023
|
ANIL BHAGWAN HINGORANI |
Nitesh Melbourne Park |
Bengaluru Urban |
Please get me refund of my booking amount |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter has been settled before Lok-Adalat. |
|
22 |
CMP/181019/0001471 |
19/10/2018
|
08/07/2023
|
Titus Ponniah |
THE GREENS PHASE II |
Bengaluru Urban |
Booking amount refund with 4 years interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter has been settled before Lok-Adalat. |
|
23 |
CMP/190301/0002327 |
01/03/2019
|
08/07/2023
|
ARJUN M S |
ROSHAN GARDENIA APARTMENT |
Bengaluru Urban |
Refund of amount with penalty |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok Adalat |
|
24 |
CMP/200716/0006129 |
16/07/2020
|
08/07/2023
|
Lakshmanan Balakrishnan |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Bengaluru Urban |
Please issue order for them to refund my amount, Plus Impose damages on OZONE. They sold that unit which I cancelled, but they did not pay me. This is highly irregular, amounts to criminal charges |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
25 |
CMP/211021/0008460 |
21/10/2021
|
08/07/2023
|
Jagadeesan P |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Bengaluru Urban |
Humbly requesting the Hon'ble RERA to direct the Builder to pay the dues and continue reimbursing Pre EMIs till possession of apartment |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
26 |
CMP/210223/0007685 |
23/02/2021
|
08/07/2023
|
Malik Sumeet Sureshbhai |
OZONE ELEGANT DEVELOPERS LLP |
Bengaluru Urban |
Get refund of INR 20,96,640/- from Builder + get HDFC home loan closure + closure of pending PRE-EMIs + compensation due to non-delivery, loss of time/effort + 5 yrs interest on down-payment amount |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
27 |
CMP/220309/0009099 |
09/03/2022
|
08/07/2023
|
SAMRAT CHAKRABORTY |
OZONE ELEGANT DEVELOPERS LLP |
Bengaluru Urban |
Want to get back the Entire Amount of Rs. 10,39,898.00 paid for Booking and First Installment |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
28 |
CMP/220112/0008779 |
12/01/2022
|
08/07/2023
|
Mohit Sharma & Akansha Sharma |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Bengaluru Urban |
INR 1,85,61,699/- for refund and different compensations |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
29 |
CMP/201113/0007055 |
13/11/2020
|
08/07/2023
|
Dr ASHA A |
B C V DEVELOPERS PVT .LTD. |
Bengaluru Urban |
award refund of entire sale consideration with interest at the rate of 18% from the date of remittance till to realization, award damages for having violated the agreed terms, pass any other order/s |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
SETTELD BEFORE LOK ADALATH |
|
30 |
CMP/210106/0007345 |
06/01/2021
|
08/07/2023
|
MR KANDATHIL MATHAI VERGHESE & MS.DHANYA MARY CHERIAN |
M/S.ZUARI INFRAWORLD INDIA LIMITED |
Bengaluru Urban |
Compensation refund penalty interest cancellation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter settled in Lok Adalat. |
|
31 |
CMP/UR/210104/0007385 |
04/01/2021
|
08/07/2023
|
Mahesh MC |
KBL builder |
Bengaluru Urban |
interest of return of advance after 3 years and 2 months |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter has been settled before Lok-Adalat. |
|
32 |
CMP/221228/0010552 |
28/12/2022
|
08/07/2023
|
ARCHANA S MALLYA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
33 |
CMP/221228/0010563 |
28/12/2022
|
08/07/2023
|
KANTILAL CHHAJER |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
34 |
CMP/221229/0010579 |
29/12/2022
|
08/07/2023
|
NILESH KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
35 |
CMP/221215/0010461 |
15/12/2022
|
08/07/2023
|
SANTOSH KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
36 |
CMP/221222/0010512 |
22/12/2022
|
08/07/2023
|
K B SUNIL KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
NO MORE EXTENSION FROM RERA. INTEREST OF UPTO 18% PLUS THE BENEFIT AS PER INCOME TAX HOSUING RELEIF. NO NEW PROJECT LAUNCHES. PRIORITY TO BE GIVEN TO MAGNOLIA PROJECT.INVOLVEMENT OF AKHIL GUPTA(MD) |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
37 |
01003/2023 |
28/06/2023
|
08/07/2023
|
VIKRAM SINGH |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delay of our flat Magnolia Mg2702 |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter has been settled before Lok-Adalat. |
|
38 |
CMP/221228/0010569 |
28/12/2022
|
08/07/2023
|
RAHUL JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
39 |
CMP/221229/0010580 |
29/12/2022
|
08/07/2023
|
MANOJ KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
40 |
CMP/221228/0010549 |
28/12/2022
|
08/07/2023
|
KAMALESH KUMAR B |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
41 |
CMP/221212/0010455 |
12/12/2022
|
08/07/2023
|
GHEVARCHAND S GURLIA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
42 |
CMP/221212/0010457 |
12/12/2022
|
08/07/2023
|
ANAND G GURLIA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
43 |
CMP/221207/0010434 |
07/12/2022
|
08/07/2023
|
HEMANT BENGANI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
44 |
CMP/221212/0010454 |
12/12/2022
|
08/07/2023
|
USHA KUMARI M |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
45 |
CMP/221228/0010558 |
28/12/2022
|
08/07/2023
|
KAILASH KUMAR CHOUDHARY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
46 |
CMP/221228/0010564 |
28/12/2022
|
08/07/2023
|
MITESH KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
No extension from RERA. Interest to be paid at 18% PA from May 2022. No new launches to be allowed to the builder. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
47 |
CMP/221228/0010561 |
28/12/2022
|
08/07/2023
|
JEETENDER CHHAJED |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
48 |
CMP/221228/0010560 |
28/12/2022
|
08/07/2023
|
CHETAN KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
49 |
CMP/221212/0010453 |
12/12/2022
|
08/07/2023
|
VANDANA KUMARI M |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
50 |
CMP/221228/0010551 |
28/12/2022
|
08/07/2023
|
PRASHANTHA GANIGA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
51 |
CMP/221207/0010427 |
07/12/2022
|
08/07/2023
|
NIKHIL JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
52 |
CMP/221228/0010559 |
28/12/2022
|
08/07/2023
|
JEETENDER CHHAJED |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
53 |
CMP/221228/0010546 |
28/12/2022
|
08/07/2023
|
SHASHI KUMAR P V |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
54 |
00390/2023 |
30/03/2023
|
08/07/2023
|
NARESH JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter has been settled before Lok-Adalat. |
|
55 |
CMP/221228/0010555 |
28/12/2022
|
08/07/2023
|
KANCHAN DEVI CHAJER |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
56 |
01072/2023 |
08/07/2023
|
08/07/2023
|
RAVI KUMAR GHANCHI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter has been settled before Lok-Adalat. |
|
57 |
CMP/221228/0010557 |
28/12/2022
|
08/07/2023
|
GOUTAM K JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
58 |
CMP/221207/0010437 |
07/12/2022
|
08/07/2023
|
NARENDRA KUMAR CHORADIA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
59 |
00391/2023 |
30/03/2023
|
08/07/2023
|
PRATIK JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter has been settled before Lok-Adalat. |
|
60 |
CMP/221228/0010566 |
28/12/2022
|
08/07/2023
|
JAYCHAND K JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
61 |
CMP/221230/0010589 |
30/12/2022
|
08/07/2023
|
VIKRAM KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
62 |
CMP/221229/0010576 |
29/12/2022
|
08/07/2023
|
NISHANT K JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
63 |
CMP/221114/0010274 |
14/11/2022
|
08/07/2023
|
CHETHAN H |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Monthly compensation with 12% per annum interest for the delayed period. Allow exit with complete refund & interest of 12% pa after Jul2023 or incr interest rates of 2% every quarter after Jul2023 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
64 |
CMP/221228/0010544 |
28/12/2022
|
08/07/2023
|
VIKAS CHOPRA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
65 |
CMP/221207/0010432 |
07/12/2022
|
08/07/2023
|
VIVEK P JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
66 |
CMP/221212/0010456 |
12/12/2022
|
08/07/2023
|
KUPARAM PARMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
67 |
CMP/221230/0010585 |
30/12/2022
|
08/07/2023
|
PRATIK BENGANI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
68 |
CMP/221228/0010568 |
28/12/2022
|
08/07/2023
|
CHANDRAKALA SARDA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
69 |
CMP/221228/0010562 |
28/12/2022
|
08/07/2023
|
PRAKASH KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
70 |
CMP/221228/0010547 |
28/12/2022
|
08/07/2023
|
SURESH KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
71 |
CMP/221229/0010575 |
29/12/2022
|
08/07/2023
|
VIJAY RAJ |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
72 |
00011/2023 |
04/01/2023
|
08/07/2023
|
S GURU PRASANNA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Termination of Agreement for Sale and Construction Agreement, Refund and Compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter has been settled before Lok-Adalat. |
|
73 |
00937/2023 |
17/06/2023
|
08/07/2023
|
UMESH SS |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Rural |
Compensation with interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter has been settled before Lok-Adalat. |
|
74 |
CMP/221207/0010433 |
07/12/2022
|
08/07/2023
|
JABRA RAM POSARAM GEHLOL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
75 |
01004/2023 |
28/06/2023
|
08/07/2023
|
KRISHNA KUMAR PUROHIT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delay of Our Flat MANGOLIA MG2402 |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter has been settled before Lok-Adalat. |
|
76 |
00388/2023 |
30/03/2023
|
08/07/2023
|
AMIT KUMAR JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter has been settled before Lok-Adalat. |
|
77 |
CMP/221228/0010553 |
28/12/2022
|
08/07/2023
|
VIKRAM MEHTA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
78 |
CMP/221207/0010430 |
07/12/2022
|
08/07/2023
|
ANUPSURYA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
79 |
00236/2023 |
23/02/2023
|
08/07/2023
|
B K NAGARAJ |
EAST NORTH VVS REALTY |
Bengaluru Urban |
to direct the Respondent to rent amount of Rs 15,000/- ( fifteen thousand only) per month |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter has been settled before Lok-Adalat. |
|
80 |
CMP/211112/0008548 |
12/11/2021
|
08/07/2023
|
SUMAN DUNDLODIA |
GODREJ PROPERTIES LTD |
Bengaluru Urban |
REFUND OF MONEY PAID BY ME RS 501101/- (FIVE LAKHS ONE THOUSAND ONE HUNDRED ONE ONLY) |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter has been settled before Lok-Adalat. |
|
81 |
CMP/UR/210406/0007867 |
06/04/2021
|
08/07/2023
|
SRINIVASAN THIRUGNANA |
JAINS & ALLIANCE PALM VENTURES PVT LTD |
Bengaluru Urban |
Completion of Villa #284 & Project, No sale to third party without Refund and Compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter has been settled before Lok-Adalat. |
|
82 |
CMP/221212/0010459 |
12/12/2022
|
08/07/2023
|
KRISHNA MOHAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
83 |
CMP/221228/0010545 |
28/12/2022
|
08/07/2023
|
ANITHA DEVI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
84 |
CMP/221207/0010429 |
07/12/2022
|
08/07/2023
|
PRAVEEN KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
85 |
CMP/221228/0010550 |
28/12/2022
|
08/07/2023
|
SANTHOSH SRIKANT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
86 |
CMP/221207/0010431 |
07/12/2022
|
08/07/2023
|
PRAVEEN KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
87 |
CMP/221228/0010554 |
28/12/2022
|
08/07/2023
|
PRIYA RAGHAVENDRA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
88 |
CMP/221228/0010548 |
28/12/2022
|
08/07/2023
|
BALAJI SATHYANARAYANAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
89 |
CMP/221115/0010327 |
15/11/2022
|
08/07/2023
|
BABULAL K JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
No extension from RERA. Interest to be paid at 18% pa from May 2022. No new launches to be allowed to the Builder. Allow exit without charges & interest relief of 18% pa post Jul 2023 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
90 |
CMP/221114/0010325 |
14/11/2022
|
08/07/2023
|
JITESH HEMRAJ PUROHIT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
No extension from RERA. Interest to be paid at 18% pa from May 2022. No new launches to be allowed to the Builder. Allow exit without charges & interest relief of 18% pa post Jul 2023 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
91 |
CMP/221207/0010436 |
07/12/2022
|
08/07/2023
|
ARJUN BASU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
92 |
CMP/221207/0010428 |
07/12/2022
|
08/07/2023
|
RAHUL MATMARI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
93 |
CMP/221207/0010426 |
07/12/2022
|
08/07/2023
|
KUNAL M JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. Rent at market rates from May 22. Exit from May 22 with int at 18% pa from date of payments made. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
94 |
CMP/221220/0010487 |
20/12/2022
|
08/07/2023
|
RISHAB BENGANI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter has been settled before Lok-Adalat. |
|
95 |
00379/2023 |
27/03/2023
|
08/07/2023
|
INDRABAI SONIGARA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
No extension from RERA. Interest to be paid at 18% pa from May 2022. No new launches to be allowed to the Builder. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter has been settled before Lok-Adalat. |
|
96 |
00389/2023 |
30/03/2023
|
08/07/2023
|
DHANANJAY P KADAM |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter has been settled before Lok-Adalat. |
|
97 |
CMP/221228/0010556 |
28/12/2022
|
08/07/2023
|
GOUTAM K JAIN |
PARKWEST - MAGNOLIA - TOWER 6 |
Bengaluru Urban |
Interest at 18% pa from May 22. No new tower launch allowed without completing the current project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter settled in Lok Adalat. |
|
98 |
CMP/220725/0009796 |
25/07/2022
|
07/07/2023
|
Shibu Chandran & Sowmya Shibu |
Brigade Enterprises Ltd. |
Bengaluru Urban |
We have paid token amount RS 200,000 as part of booking of an apartment in Brigade Laguna, Brigade is not willing to refund the complete Token amount upon the cancellation of the apartment booking. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Settled Before Lok Adalat |
|
99 |
00621/2023 |
02/05/2023
|
07/07/2023
|
MADHUSUDHAN GATTAMANENI |
GODREJ PROPERTIES LIMITED |
Bengaluru Urban |
Set the process straight for builder for having agreement registration done first and show the progress and payments duly for the due closure of the property registration. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
SETTLED BEFORE LOK ADALAT |
|
100 |
CMP/200220/0004080 |
20/02/2020
|
21/06/2023
|
ANIL REBELLO |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
refund of amount, interest and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter settled in Lok-Adalat. |
|
101 |
CMP/210309/0007773 |
09/03/2021
|
17/06/2023
|
THANDAYUDHA BANI S & SUSHEELA |
LEGACY GLOBAL PROJECTS PVT LTD |
Bengaluru Urban |
As mentioned in the complaint uploaded. The reliefs sought are mentioned in the complaint copy uploaded. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
102 |
CMP/210309/0007771 |
09/03/2021
|
17/06/2023
|
SOMYA P |
LEGACY GLOBAL PROJECTS PVT LTD |
Bengaluru Urban |
Compensation and damages are sought according to the agreement. Reliefs As per the complaint uploaded. (In Previous page, the complaint has been uploaded which is inclusive of the reliefs sought. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
103 |
CMP/210309/0007772 |
09/03/2021
|
17/06/2023
|
Chiranth KN |
Legacy Global Projects Private Limited |
Bengaluru Urban |
COmpensation and damages are sought for the delay and in fact for not starting the project yet. Reliefs are As per the complaint uploaded. The reliefs sought are mentioned in the complaint. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
104 |
CMP/191028/0004572 |
28/10/2019
|
09/06/2023
|
SUMEER BHATARA |
NITESH MELBOURNE PARK |
Bengaluru Urban |
Complete refund of the amount along with interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok-Adalat. |
|
105 |
CMP/210120/0007478 |
20/01/2021
|
09/06/2023
|
NACHIKETA TRIVEDI |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Help in refund with the applicable interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter settled in Lok-Adalat. |
|
106 |
CMP/190717/0003590 |
17/07/2019
|
02/06/2023
|
LYNETTE HYACINTH NAZARETH AND NORBERT RAJAN NAZARETH |
NITESH MELBOURNE PARK |
Bengaluru Urban |
Refund of Rs.6382799,TDS,Interest@18%,Compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok-Adalat. |
|
107 |
CMP/190724/0003645 |
24/07/2019
|
02/06/2023
|
LYNETTE HYACINTH NAZARETH AND NORBERT RAJAN NAZARETH |
NITESH MELBOURNE PARK |
Bengaluru Urban |
Refund 4641564,TDS,Interest @18%,Compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok-Adalat. |
|
108 |
CMP/220309/0009097 |
09/03/2022
|
23/05/2023
|
CHETAN ANAND & MRS. NARINDER KAUR ANAND |
NITESH HOUSING DEVELOPERS PVT LTD |
Bengaluru Urban |
Refund along with interest on monies paid |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter settled in Lok-Adalat. |
|
109 |
CMP/210312/0007784 |
12/03/2021
|
23/05/2023
|
SHRIKANT SARDA & (2) NAMRATA SARDA |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund of the amount including interest and penalty |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter settled in Lok-Adalat. |
|
110 |
CMP/220329/0009278 |
29/03/2022
|
20/05/2023
|
Vijay Kumar M |
VIJAY KUMAR M & MRS. CHANDANA CHANDRASHEKAR |
Bengaluru Urban |
Refund of Principal paid with interest and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter settled in Lok-Adalat. |
|
111 |
CMP/200618/0006046 |
18/06/2020
|
20/05/2023
|
LAKSHMANAN BALAKRISHNAN |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED now as called NHDPL SOUTH PRIVATE LIMITED |
Bengaluru Urban |
To get back my investment of Rs.50,00,000 plus interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter settled in Lok-Adalat. |
|
112 |
CMP/UR/221108/0010226 |
08/11/2022
|
12/05/2023
|
Shaik Nayab Rasool |
Shriram Properties |
Bengaluru Urban |
Refund amount of 50000 rs (fifty thousand rupees only) |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Settled before Lok Adalat |
|
113 |
CMP/220105/0008767 |
05/01/2022
|
05/05/2023
|
AMREETA MAZUMDAR & (2) ARUNAVA SEAL |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund of the money we gave to NHDPL with interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter settled in Lok-Adalat. |
|
114 |
CMP/181114/0001633 |
14/11/2018
|
03/05/2023
|
Mohandas Hasyagar |
Nitesh Napa Valley |
Bengaluru Urban |
Refund of entire amount with interest compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok-Adalat. |
|
115 |
00048/2023 |
10/01/2023
|
03/05/2023
|
Sachin |
SHRIPROP PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Request to get booking amount refund from the promotor |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Settled before |Lok Adalath |
|
116 |
CMP/221107/0010224 |
07/11/2022
|
03/05/2023
|
MANISHA BAJAJ |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
For refund of the entire amount paid by the complainant along with interest and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter settled in Lok-Adalat. |
|
117 |
CMP/220207/0008976 |
07/02/2022
|
26/04/2023
|
Ipsita Banerjee |
SPL TOWERS PRIVATE LIMITED |
Bengaluru Urban |
We require a refund of my hard earned money of 1 lakh as I do not wish to enter into a sale agreement with Shriram Properties Wytfield Ph 2. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Settled before Lok Adalath. |
|
118 |
00176/2023 |
07/02/2023
|
20/04/2023
|
SHOBHALAKSHMI AND ANOTHER |
EMBASSY PROPERTY DEVELOPMENT PVT LTD |
Bengaluru Urban |
Project t started on 2013, to be completed with in 48 + 6 months, as on Jan 2023 delayed by 61 months , asking for compensation and apartment with basic eminities as OC received on May 2023. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
DISPOSED OFF BEFORE THE LOK ADALAT |
|
119 |
00123/2023 |
31/01/2023
|
05/04/2023
|
Chintu Varkey |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Cancellation of Unit No. D-0001 along with refund of Rs. 31,00,089/- with 18% interest p.a and compensation of Rs. 5,00,000/- for delay |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 6TH LOK ADALAT. |
|
120 |
00124/2023 |
31/01/2023
|
05/04/2023
|
Chintu Varkey |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Cancellation of Unit No. D-0091 along with refund of Rs. 10,05,302/- with 18% interest p.a and compensation of Rs. 5,00,000/- for delay |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 6TH LOK ADALAT. |
|
121 |
00219/2023 |
21/02/2023
|
31/03/2023
|
Sobhana Priyadarshani |
AKARSHA REALTY PRIVATE LIMITED |
Bengaluru Urban |
Delay of Refund- To get a full refund of the amount paid along with interest. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 6th Lok Adalat. |
|
122 |
CMP/220707/0009728 |
07/07/2022
|
30/03/2023
|
DEEPAK MARTIN S |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
full refund of our principal and interest as per the agreement |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter settled in Lok-Adalat. |
|
123 |
CMP/200313/0005667 |
13/03/2020
|
20/03/2023
|
VASUDEVAMURTY VENKATA VEMULA |
Puravankara Limited |
Bengaluru Urban |
PAYMENT OF Rs. 9,33,950/- AS COMPENSATION FOR DELAY POSSESSION OF THE FLAT. DETAILS OF CALCULATIONS IN ATTACHMENT COMPENSATION CALCULATIONS.PDF |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 6th Lok Adalat. |
|
124 |
CMP/220309/0009096 |
09/03/2022
|
15/03/2023
|
NAVNEETH BHEEMAN & (2) LEENA POOVANNA NAVNEETH |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIM |
Bengaluru Urban |
Refund of full amount paid along with interest at prevailing rates of 9.5% |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 6th Lok Adalat. |
|
125 |
CMP/210811/0008236 |
11/08/2021
|
14/03/2023
|
GANESH VENKAT |
M/s. Wonder Projects Development Private Limited |
Bengaluru Urban |
Refund of our booking advance amount with interest till date |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 6th Lok Adalat. |
|
126 |
CMP/201114/0007060 |
14/11/2020
|
01/03/2023
|
Sunil Banthiya |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 6th Lok Adalat. |
|
127 |
00067/2023 |
12/01/2023
|
24/02/2023
|
Murali G |
HighLand Properties |
Bengaluru Urban |
Refund of the booking amount |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 6th Lok Adalat. |
|
128 |
CMP/201014/0006662 |
14/10/2020
|
22/02/2023
|
SURESH BABU M |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED NOW CALLED AS NHDPL PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund of Rs.64,87,376 with compensation (interest) |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 6th Lok Adalat. |
|
129 |
CMP/220811/0009868 |
11/08/2022
|
22/02/2023
|
BHUSHAN SHRAVAN BARI |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund paid amount with applicable interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 6th Lok Adalat. |
|
130 |
CMP/220205/0008963 |
05/02/2022
|
16/02/2023
|
SHEKHAR SHARAN BHATIYA & (2) RADHA BHATIYA |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Since project is stalled kindly order builder to refund the money paid with interest. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
131 |
CMP/180530/0000870 |
30/05/2018
|
11/02/2023
|
Oommen Thomas |
Nitesh Long Island |
Bengaluru Urban |
Completion of Pending work and Delay Compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Disposed before Lok Adalat |
|
132 |
CMP/180426/0000785 |
26/04/2018
|
11/02/2023
|
Murlidhar Bhat |
Nitesh Estates Ltd |
Bengaluru Urban |
Flat+Project handover |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok Adalat. |
|
133 |
CMP/180426/0000783 |
26/04/2018
|
11/02/2023
|
MANISH AGARWAL |
UNISHIRE HOUSING LLP |
Bengaluru Urban |
Help to get Return of Funds |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok Adalat. |
|
134 |
CMP/180311/0000562 |
11/03/2018
|
11/02/2023
|
ASHUTOSH MADAN |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Compensation for Delay |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok Adalat. |
|
135 |
CMP/180317/0000590 |
17/03/2018
|
11/02/2023
|
ASHUTOSH GUPTA |
Nitesh Long Island |
Bengaluru Urban |
Delay Compensation from Nitesh per RERA guidelines |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Disposed before Lok Adalat
|
|
136 |
CMP/180315/0000577 |
15/03/2018
|
11/02/2023
|
Dipanjan Basu |
Nitesh Long Island |
Bengaluru Urban |
Compensation for delay and non completion |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Disposed before Lok Adalat |
|
137 |
CMP/180730/0001090 |
30/07/2018
|
11/02/2023
|
Nihar Kanta Moharana |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Yes |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok Adalat. |
|
138 |
CMP/180617/0000921 |
17/06/2018
|
11/02/2023
|
Lakshminarayana K P Mandaleeka |
VASATHI HOUSING LTD |
Bengaluru Urban |
Refund of amount with interest and Compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled in Lok Adalat. |
|
139 |
CMP/181016/0001457 |
16/10/2018
|
11/02/2023
|
RAGHUNANDAN BANGALORE |
Mantri Developers Pvt Ltd |
Bengaluru Urban |
Payment to be done as per the latest calculations |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok Adalat. |
|
140 |
CMP/181126/0001669 |
26/11/2018
|
11/02/2023
|
SAI PRAMOD G N |
MANTRI DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
MDPL to honor buyback and compensation for delay A |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok Adalat. |
|
141 |
CMP/181014/0001454 |
14/10/2018
|
11/02/2023
|
MR VIBHU BHOLA |
REDDY SHELTERS PRIVATE LIMITED |
Bengaluru Urban |
possession with all amenities by Nov2018 or refund |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in Lok Adalat. |
|
142 |
CMP/181126/0001668 |
26/11/2018
|
11/02/2023
|
VEENA GOWDA |
MANTRI TECHNOLOGY CONSTELLATIONS PVT. LTD. |
Bengaluru Urban |
Hand over possession and other relief |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled in Lok Adalat |
|
143 |
CMP/190607/0003252 |
07/06/2019
|
11/02/2023
|
NIRANJAN SOMISETTY AND LAKSHMI S NIRANJAN |
MANTRI CASTLES PVT LTD |
Bengaluru Urban |
Delay compensation as per RERA provisions. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled in Lok Adalat. |
|
144 |
CMP/190607/0003255 |
07/06/2019
|
11/02/2023
|
NAGESH SOMISETTY AND ANITHA S NAGESH |
MANTRI CASTLES PVT LTD |
Bengaluru Urban |
Delay compensation as per RERA provisions |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled in Lok Adalat. |
|
145 |
CMP/220328/0009273 |
28/03/2022
|
11/02/2023
|
Karthic Raj S |
NITESH MELBOURSE PARK |
Bengaluru Urban |
I would request that Nitesh estates refunds my amount in full with Interest and penalty fee for the delay of more than 7 years . |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled in Lok Adalat. |
|
146 |
CMP/220307/0009084 |
07/03/2022
|
11/02/2023
|
Dsouza Prakash |
Nitesh Housing Developers Pvt Ltd. |
Bengaluru Urban |
Refunds of advance payment paid to Nitesh Housing Developers with interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter settled in Lok Adalat. |
|
147 |
CMP/210717/0008134 |
17/07/2021
|
11/02/2023
|
ASHWINI MADAPPA M |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Mysore |
Refund of INR 30.23 lakhs (fully paid amount) + applicable interest for delays |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled in Lok Adalat. |
|
148 |
CMP/201115/0007063 |
15/11/2020
|
11/02/2023
|
MERILIN STANLEY & STANLEY FRANCIS |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Rs 40,00,000/- |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
149 |
CMP/211215/0008731 |
15/12/2021
|
11/02/2023
|
MRS NUZHAT SULTANA |
LEGACY GLOBAL PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
a) Repayment of sum of Rs. 18,99,000/- paid by the Complainant towards the purchase of the Flat No.C-402 in the Respondent Project, b) Pay Compensation of Rs. 50,00,000/- towards loss on investment |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled in Lok Adalat. |
|
150 |
CMP/201207/0007095 |
07/12/2020
|
11/02/2023
|
RASHMI KOTHARI |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of Total amount paid of Rs. 4399730/ + Interest @ 18% pa. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled in Lok Adalat. |
|
151 |
CMP/210224/0007692 |
24/02/2021
|
11/02/2023
|
SHISHIR SHETTY |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Sum of total amount demanded and payable to applicants is Rs. 1,22,26,536.92/- (Rupees One Crore Twenty-Two Lakh Twenty-Six Thousand Five Hundred Thirty Six and Paisa Ninety Two Only) plus interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter settled before Lok Adalat. |
|
152 |
CMP/221115/0010333 |
15/11/2022
|
11/02/2023
|
PARNAVEE DHAPADE |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Looking forward for the refund of rent paid for another flat throughout the year OR reducing the agreement amount. I need help of Rs. 4 Lacs (Rs. 4,00,000/-) for our sufferings. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter settled in Lok Adalat. |
|
153 |
CMP/221107/0010188 |
07/11/2022
|
11/02/2023
|
SANGEETHA JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
I request your good office to direct developer to early handover of possession of duly Completed flat in my name and pay interest of 18% pa from the date of promise to till the date of actual handover |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled in Lok Adalat. |
|
154 |
CMP/221209/0010444 |
09/12/2022
|
11/02/2023
|
PRAVEEN KUMAR KANNI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation with 18% per annum interest rate till date for the amount paid and for further delay. No RERA extensions & No new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled in Lok Adalat. |
|
155 |
CMP/221205/0010420 |
05/12/2022
|
11/02/2023
|
RAGU SUNDARARAJAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
I request RERA to kindly prevail upon the Developer to hand over the flat to me in completed condition and also get me the compensation for the delay period |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled in Lok Adalat. |
|
156 |
CMP/220812/0009882 |
12/08/2022
|
11/02/2023
|
DR SUREKHA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
delay compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter settled in Lok Adalat. |
|
157 |
CMP/221107/0010187 |
07/11/2022
|
11/02/2023
|
SANGEETHA JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
I request your good office to direct developer to early handover of possession of duly Completed flat in my name and pay interest of 18% pa from the date of promise to till the date of actual handover |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled before Lok Adalat. |
|
158 |
CMP/221020/0010115 |
20/10/2022
|
11/02/2023
|
ANIL GAUTAMCHAND KANKLIYA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fit. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled in Lok Adalat. |
|
159 |
CMP/221130/0010415 |
30/11/2022
|
11/02/2023
|
SANTHOSH RAJAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Seeking appropriate compensation for delays along with interest. I seek Rs. 80,000per month for every month of delay since 31-Dec-2019 + 9.5% interest per annum as compensation. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled in Lok Adalat. |
|
160 |
00140/2023 |
31/01/2023
|
11/02/2023
|
ASHOK SATYAMURTHY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delay in handing over our flat MC 002. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled in Lok Adalat. |
|
161 |
CMP/220804/0009852 |
04/08/2022
|
11/02/2023
|
HIRALAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Kindly help us getting compensation as per RERA guildelines , already we are paying EMI |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled in Lok Adalat. |
|
162 |
CMP/221216/0010464 |
16/12/2022
|
11/02/2023
|
MADHU SINGH |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Since it has been too long time and still they are extending the due date for handover, We request you to kindly get us the compensation as per RERA Guidelines. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled in Lok Adalat. |
|
163 |
CMP/220813/0009890 |
13/08/2022
|
11/02/2023
|
SUNITHA KOTRESH |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
RETURN OF AMOUNT AND COMPENSATION |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
164 |
CMP/221110/0010243 |
10/11/2022
|
11/02/2023
|
KUNAL M JAIN |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Compensation in delay in delivery as the initial delivery was on 31st dec 2019. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
165 |
00089/2023 |
17/01/2023
|
11/02/2023
|
LALITH KUMAR |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Delay Compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
166 |
CMP/221112/0010256 |
12/11/2022
|
11/02/2023
|
KANCHAN GUPTA |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Interest as per RERA rules for delayed period |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
167 |
CMP/221217/0010477 |
17/12/2022
|
11/02/2023
|
SIDDALINGA SWAMY M |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Compensation with 18% annum interest rate till date. Monthly compensation with 18% interest for further delay.No rera extension and no new tower registration. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
168 |
00015/2023 |
04/01/2023
|
11/02/2023
|
KISHORE M JAIN |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Compensation for delay in delivery of the property as the same was to be deilvered by 31st dec 2019. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
169 |
CMP/221020/0010116 |
20/10/2022
|
11/02/2023
|
NEELAM KANKALIYA |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fit. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
170 |
CMP/220804/0009850 |
04/08/2022
|
11/02/2023
|
OM BHAVESH PAREKH |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Compensation and Interest of 18% Per annum till date . Monthly compensation with 18% rate & monthly rent for further delay. No RERA extension & new tower launch register without complainants content |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
171 |
CMP/220820/0009922 |
20/08/2022
|
11/02/2023
|
KAILASH KUMAR PARASMAL JAIN |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Compensation for delay of Our Flat MAPLE MA2403 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
172 |
00168/2023 |
06/02/2023
|
11/02/2023
|
HITESH C FOFARIA |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Compensation for delay of possession with 18%.p.a interest on the total amount paid for the flat from December 2019 till the date of possession of flat. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
173 |
00196/2023 |
10/02/2023
|
11/02/2023
|
RAFEEK A K |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Compensation for delay. No RERA extensions & new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
174 |
CMP/221228/0010543 |
28/12/2022
|
11/02/2023
|
HARISH PREMJI GAMI |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Compensation from builder. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
175 |
CMP/220321/0009202 |
21/03/2022
|
11/02/2023
|
KAMLESH MUNOT |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover . Also any other relief which authority deems fit. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
176 |
CMP/220517/0009479 |
17/05/2022
|
11/02/2023
|
SUNIL KUMAR JAIN |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fit |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
177 |
CMP/221217/0010476 |
17/12/2022
|
11/02/2023
|
VINAY K M |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Compensation for the delay with applicable interest till date. No RERA extensions/registrations without complaint consent |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
178 |
00197/2023 |
10/02/2023
|
11/02/2023
|
MANSOOR CH |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Compensation for the delay . No RERA extensions and new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
179 |
CMP/221112/0010255 |
12/11/2022
|
11/02/2023
|
CHATNA H |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Want compensation for delay or full payment back with interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
180 |
CMP/200810/0006332 |
10/08/2020
|
11/02/2023
|
R SREERAM ANVESH |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund, Interest, Compensation for mental agony and Legal Cost |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
181 |
CMP/201213/0007255 |
13/12/2020
|
11/02/2023
|
RANJIT NAMBIAR |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Help in refund. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
182 |
CMP/220112/0008777 |
12/01/2022
|
11/02/2023
|
MUKUND MADHAV AGARWAL |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of Money with Interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
183 |
CMP/221215/0010463 |
15/12/2022
|
11/02/2023
|
TEENA K JAIN |
VASATHI HOUSING LTD |
Bengaluru Urban |
kindly direct the Respondent to register Sale Deed and also award the Complainant with Rs.1,00,000/- Compensation for the delay in registering the Sale Deed. and pass any other order |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
184 |
CMP/200927/0006666 |
27/09/2020
|
11/02/2023
|
MAHESH KUMAR JAIN |
MANTRI CASTLES PVT LTD |
Bengaluru Urban |
As prayed in the Facts of Case |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
185 |
00106/2023 |
20/01/2023
|
11/02/2023
|
ABID HUSSAIN SHA |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
compensation for delay |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
186 |
CMP/211019/0008449 |
19/10/2021
|
11/02/2023
|
BABITHA P |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Delay in completion and handover of flat, Flat hand over and registration Immediately |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled in Lok Adalat. |
|
187 |
CMP/221212/0010449 |
12/12/2022
|
11/02/2023
|
PANCHAKSHARI KANNI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation at 18% per annum interest rate till date and for any further delay. No Rera extensions & No new tower to be registered |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled in Lok Adalat |
|
188 |
CMP/221104/0010178 |
04/11/2022
|
11/02/2023
|
K BABULAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation For Delay in delivery as the initial delivery date was 31st dec 2019 |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled in Lok Adalat. |
|
189 |
CMP/211109/0008528 |
09/11/2021
|
11/02/2023
|
SINGAL JITESH |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Sought Compensation for this extensive delay in completion of project |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter settled in Lok Adalat. |
|
190 |
CMP/221114/0010271 |
14/11/2022
|
11/02/2023
|
ANUSHA BEESETTI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation with Interest for the delayed period. Early possession of the flat. No RERA extensions &new tower registrations without complainants' consent |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled in Lok Adalat. |
|
191 |
CMP/220517/0009474 |
17/05/2022
|
11/02/2023
|
BHARAT KUMAR JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
SEEKING COMPOUND INTEREST @ 24% TILL THE POSSESION |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled in Lok Adalat. |
|
192 |
CMP/220707/0009729 |
07/07/2022
|
11/02/2023
|
SUDEEP KABI |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Cancellation of Unit No. D-0307 along with refund of Rs. 20,75,869/- with 18% interest p.a and compensation of Rs. 5,00,000/- for delay |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled in Lok Adalat. |
|
193 |
CMP/210908/0008312 |
08/09/2021
|
11/02/2023
|
SATISH SHRIVASTAVA |
ARATT CITYSCAPES PROJECT LLP |
Bengaluru Urban |
To direct the builder for refund (with interest and compensation). Refunded partially. Still 2.5 Lakhs (in actual) with builder from last 1.2 years |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled in Lok Adalat |
|
194 |
00201/2023 |
11/02/2023
|
11/02/2023
|
ANIL KUMAR P V |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Project completion to happen at the earliest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
195 |
00001/2023 |
02/01/2023
|
11/02/2023
|
M G ASHOK RAO |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Developer to provide Electricity, Water, STP ,Common areas, club house. Form and hand over owners' association, sinking fund. Compensation for delay to be paid @18% p.a. of total payment made , |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
196 |
CMP/221110/0010240 |
10/11/2022
|
11/02/2023
|
BINU MOOLAKARA CHACKO |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Compensation for delayed project & expedite completion of Project as per Sale / Maintenance agreement, return of corpus funds & formation of association |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
197 |
00190/2023 |
09/02/2023
|
11/02/2023
|
MAYUKH MAHAPATRA |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Compensation for delayed project and expedite completion of project as per sale agreement, return of sinking fund and formation of association |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
198 |
00204/2023 |
11/02/2023
|
11/02/2023
|
A.N SHIVKUMAR |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Compensation for delayed project and Expedite completion as per sale agreement, return of corpus fund and formation of association , sinking fund should be returned to the association in full |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
199 |
00203/2023 |
11/02/2023
|
11/02/2023
|
JAGDEEP SINGH SHOKEEN |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Timely completion and refund of monetary loss incurred |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
200 |
CMP/220625/0009688 |
25/06/2022
|
11/02/2023
|
SAMATHA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation and house rent with 18% per annum interest till date monthly compensation with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants c |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled in Lok Adalat. |
|
201 |
00192/2023 |
09/02/2023
|
11/02/2023
|
RAJESH DWIVEDI |
NITESH ESTATES LIMITED |
Bengaluru Urban |
compensation for delayed project and to expedite completion project as per sale /maintenance agreement, return of corpus funds and formation of association |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
202 |
00202/2023 |
11/02/2023
|
11/02/2023
|
RADHAKRISHNAN AYYAPPANAICKER |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Compensation for the delay and complete the amenities |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Disposed before Lok Adalat |
|
203 |
00084/2023 |
17/01/2023
|
11/02/2023
|
HAFIZUNNISA M |
CASA GRANDE GARDEN CITY BUILDERS PVT LTD |
Bengaluru Urban |
Please be advised to adhere to Karnataka RERA clause. As per RERA clause the builder has to refund the entire booking amount without any deduction if the sale agreement is not executed and registered |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK-ADALAT. |
|
204 |
CMP/221221/0010505 |
21/12/2022
|
11/02/2023
|
NAVEEN ANGURALA |
GAZY MAG PVT LTD |
Bengaluru Urban |
Full refund of booking amount |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK-ADALAT. |
|
205 |
CMP/220404/0009308 |
04/04/2022
|
11/02/2023
|
Anand Kumar Verma |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Please help me to get my principal and interest amount from Nitesh |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK-ADALAT. |
|
206 |
CMP/201213/0007112 |
13/12/2020
|
11/02/2023
|
JITENDRA HARICHANDAN |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund with Compensation for Paid Installments |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK-ADALAT. |
|
207 |
CMP/UR/221110/0010242 |
10/11/2022
|
11/02/2023
|
V Anilkumar |
Sree Krishna developers and promoters |
Bengaluru Urban |
Should get the site registered with the same price as committed in the sale agreement and pay penalty. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK-ADALAT. |
|
208 |
CMP/UR/221110/0010241 |
10/11/2022
|
11/02/2023
|
Sunil Kumar Vengalil |
Shree Krishna developers and promoters |
Bengaluru Urban |
Should get the site registered with the same price as mentioned in the sale agreement and pay the penalty |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK-ADALAT. |
|
209 |
CMP/220222/0009033 |
22/02/2022
|
11/02/2023
|
SUNIL SURESH |
ROCKLINES HOUSING DEVELOPMENT PVT LTD |
Bengaluru Urban |
It is most humbly prayed that this Hon’ble Authority/Adjudicating Officer be pleased to grant compensation of INR 7,50,00,000 (Rupees Seven Crores Fifty Lakhs Only) to the Applicants |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled in Lok Adalat. |
|
210 |
CMP/220908/0009986 |
08/09/2022
|
11/02/2023
|
SUNIT NEVETIA |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Nitesh Long Island |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Disposed before Lok Adalat |
|
211 |
CMP/200302/0003738 |
02/03/2020
|
11/02/2023
|
Badri Krishnan |
P V Ravindra Kumar |
Bengaluru Urban |
Compensation and enforce registration |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
212 |
CMP/220430/0009402 |
30/04/2022
|
10/02/2023
|
Sunil Suresh |
ROCKLINES HOUSING DEVELOPMENT PVT LTD |
Bengaluru Urban |
As mentioned in paragraph 2 in the above field. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok-Adalat. |
|
213 |
CMP/UR/200531/0005945 |
31/05/2020
|
09/02/2023
|
willibroid denzil pereira |
M/S HOSKOTE NEO HOMES LTD |
Bengaluru Urban |
REFUND OF PAYMENT WITH PAYOUTS MENTIONED IN THE ALLOTMENT AGREEMENT FROM 3 YEARS AMOUNTING OF TOTAL RS 17,18,400/- |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
MATTER IS SETTLED BEFORE 5TH LOK-ADALAT. |
|
214 |
CMP/UR/221010/0010065 |
10/10/2022
|
02/02/2023
|
Vinita Padubidri |
State excise multipurpose co-operative society |
Bengaluru Urban |
I request RERA court to ensure that the society and developer execute the of Rs. 699 sq. ft price as per the sale agreement as I have paid all 4 instalments on time without any delay! Thank you! |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok-Adalat. |
|
215 |
CMP/UR/221013/0010095 |
13/10/2022
|
02/02/2023
|
Narendra Kumar K |
M/S. State Excise Multipurpose Co-Operative Society Ltd. |
Bengaluru Urban |
As all the requested payments were made in due time and loses incurred to society/developer is not because of me, hike should not be applicable to me and my site should be registered at the earliest. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok-Adalat |
|
216 |
CMP/UR/221226/0010532 |
26/12/2022
|
31/01/2023
|
Fakruddin P M |
M/s Sree Krishna Developers And Promoters |
Bengaluru Urban |
Kindly give compensation as mentioned in the sale agreement point No.6, which is the prevailing bank interest on the total amount paid by the purchaser/member. also mentioned that the interest amount |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok Adalat |
|
217 |
CMP/UR/221226/0010533 |
26/12/2022
|
31/01/2023
|
k Abdul Bari |
M/s Sree Krishna Developers And Promoters |
Bengaluru Urban |
Kindly give compensation as mentioned in the sale agreement point No.6, which is the prevailing bank interest on the total amount paid by the purchaser/member. also mentioned that the interest amount |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok Adalat |
|
218 |
CMP/220430/0009401 |
30/04/2022
|
31/01/2023
|
Mohit Mathur |
VSan Infrastructure Pvt Ltd |
Bengaluru Urban |
Refund of amount for the properties along with interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok-Adalat. |
|
219 |
CMP/210304/0007745 |
04/03/2021
|
31/01/2023
|
Umar Shaik |
VSan Infrastructure Pvt Ltd |
Bengaluru Urban |
They are not allowing me to cancel agreement. My humble request to you is to help me getting my money back, which i have saved for the future of my children |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok-Adalat. |
|
220 |
CMP/221107/0010216 |
07/11/2022
|
25/01/2023
|
NITIN R SHROFF |
Puravankara Limited |
Bengaluru Urban |
WOULD LIKE TO EXIT THE PROJECT AND WOULS REQUEST FOR A FULL REFUND OF INSTALLMENTS AND GST PAID UPTO DATE WITH INTEREST UPTO DATE AS BUILDER HAS BREACHED THE AGREEMENT |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok Adalat |
|
221 |
CMP/221226/0010531 |
26/12/2022
|
21/01/2023
|
Jagadeesan P |
SOBHA LIMITED |
Bengaluru Urban |
Request for refund of remaining token amount of Rs.50,000/- immediately |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK ADALAT. |
|
222 |
CMP/UR/220603/0009576 |
03/06/2022
|
20/01/2023
|
Nagaraju c |
Vsan infrastructure pvt ltd |
Bengaluru Urban |
We want buyback amount ie double of investment plus interest of the amount investment |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
MATTER IS SETTLED BEFORE 5TH LOK ADALAT. |
|
223 |
CMP/200201/0005326 |
01/02/2020
|
20/01/2023
|
Mrs Teresa Regina Kumari |
Puravankara Limited |
Bengaluru Urban |
REQUESTED TO KINDLY INTERVENE AND ADVISE PROMOTER TO MAKE THE REFUND OF BALANCE AMOUN T IMMEDIATELY |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok Adalat. |
|
224 |
CMP/UR/220725/0009794 |
25/07/2022
|
09/01/2023
|
Nagaraju c |
V San infrastructure pvt ltd |
Bengaluru Urban |
Refund with compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok Adalat. |
|
225 |
CMP/220726/0009812 |
26/07/2022
|
09/01/2023
|
Suma S C |
VSan Infrastructure Pvt Ltd |
Bengaluru Urban |
Need compensation with interest and to direction the respondent to allot the site. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok Adalat. |
|
226 |
CMP/211111/0008539 |
11/11/2021
|
04/01/2023
|
H S Vivekananda |
Total Environment Building Systems Pvt Ltd |
Bengaluru Urban |
Refund of the booking amount |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok Adalat. |
|
227 |
CMP/221128/0010407 |
28/11/2022
|
28/12/2022
|
Kumar Maruti Priyadarshi |
Sobha Limited |
Bengaluru Urban |
As promised by the builder at the time of sale, please help me to get shopping vouchers worth Rs.62,500. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK ADALAT. |
|
228 |
CMP/220112/0008784 |
12/01/2022
|
26/12/2022
|
MOHAMMAD SHADAB KHAN |
Godrej Properties Limited |
Bengaluru Urban |
Thereby directing the Respondent to refund of 7, 55, 324.24/- (Rupees Seven Lakhs Fifty Five Thousand Three Hundred and Twenty-Four and Paisa Twenty Four Only) along with Interest @ 18% p.a. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
MATTER IS SETTLED BEFORE 5TH LOK ADALAT. |
|
229 |
CMP/UR/221207/0010435 |
07/12/2022
|
26/12/2022
|
Narendra Reddy B J |
SREE KRISHNA DEVELOPERS & PROMOTERS |
Bengaluru Urban |
All payments were made in due time as agreed and loses incurred to developer is not because of me, hike should not be applicable to me and my site should be registered at the earliest. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK ADALAT. |
|
230 |
CMP/UR/221219/0010483 |
19/12/2022
|
26/12/2022
|
Ganesh Reddy S |
Unnathi Group of India INC., |
Bengaluru Urban |
All payments were made in due time as agreed and loses incurred to developer is not because of me, hike should not be applicable to me and my site should be registered at the earliest. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK ADALAT. |
|
231 |
CMP/UR/221217/0010474 |
17/12/2022
|
26/12/2022
|
Muniyamma B |
Unnathi Group of India INC., |
Bengaluru Urban |
All payments were made in due time as agreed and loses incurred to developer is not because of me, hike should not be applicable to me and my site should be registered at the earliest. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK ADALAT. |
|
232 |
00114/2023 |
23/01/2023
|
26/12/2022
|
Archana N |
M/S Sree Krishna Developers and Promoters |
Bengaluru Urban |
100% of the requested amount was made within due time and loses incurred to developer is not because of me, hike should not be applicable and in return I should get interest for 2 years for my money. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
MATTER IS SETTLED BEFORE 5TH LOK ADALAT. |
|
233 |
CMP/220525/0009525 |
25/05/2022
|
23/12/2022
|
KARUNAKARAN JAYACHANDRAN |
Godrej Properties Limited |
Bengaluru Urban |
Order of refund of the entire amount paid as part sale consideration |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
MATTER IS SETTLED BEFORE 5TH LOK ADALAT. |
|
234 |
CMP/220117/0008812 |
17/01/2022
|
19/12/2022
|
Nischith Dsouza |
Godrej Properties Limited |
Bengaluru Urban |
Direct the Respondent No. 1 Godrej properties to refund the entire amount of Rs. 7,60,142.14 paid towards the purchase of the flat. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled before 5th Lok Adalat |
|
235 |
CMP/210207/0007592 |
07/02/2021
|
19/12/2022
|
Vinayaka Mothkur |
Godrej Properties Limited |
Bengaluru Urban |
Request to intervein in the balance recovery of Rs. 1,18,000.00 from godrej properties which is retained as administrative charges. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok Adalat. |
|
236 |
CMP/UR/221217/0010475 |
17/12/2022
|
17/12/2022
|
Poornima Vijay Anandh |
M/s. Shree Krishna Developers and Promoters |
Bengaluru Urban |
PRAY TO DIRECT RESPONDENTS TO EXECUTE SALE DEED FOR THE SITE AS PER TERMS IN REGISTERED SALE AGREEMENT WITH ALL MOTHER DOCS, FULLY DEVELOPED WITH AMENITIES, AT NO EXTRA COST OR FURTHER DELAY, ISSUES. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok Adalat. |
|
237 |
CMP/UR/221217/0010481 |
17/12/2022
|
17/12/2022
|
ROOPARANI C |
SRI KRISHNA DEVELOPERS |
Bengaluru Urban |
REQUEST TO DIRECT RESPONDENTS TO EXECUTE SALE DEED FOR THE SITE AS PER TERMS IN THE REGISTERED SALE AGREEMENT WITH ALL MOTHER DOCS, FULLY DEVELOPED AMENITIES AT NO EXTRA COST OR FURTHER DELAY. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok Adalat. |
|
238 |
CMP/200619/0005942 |
19/06/2020
|
16/12/2022
|
K N CHANDRASHEKHAR |
MANTRI CASTLES PVT LTD |
Bengaluru Urban |
As prayed in the Facts of Complaint |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter has been settled between parties. |
|
239 |
CMP/220922/0010040 |
22/09/2022
|
16/12/2022
|
Prerit Jain |
THills formerly known as Jaganmata Property Developers Private Limited |
Bengaluru Urban |
Builder should return the booking amount |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 5th Lok Adalat. |
|
240 |
CMP/171113/0000210 |
13/11/2017
|
12/11/2022
|
Gesley George |
Expat Projects & Development Pvt Ltd |
Bengaluru Urban |
Compensation for delay & Timely project completion |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
241 |
CMP/180312/0000563 |
12/03/2018
|
12/11/2022
|
Padmanava Sen |
Mantri developers |
Bengaluru Urban |
Mantri to honor the buyback agreement by May 2018 |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
242 |
CMP/181205/0001719 |
05/12/2018
|
12/11/2022
|
MEHMOOD KHAN DAFEDAR |
Provident Park Square Phase - 1, |
Bengaluru Urban |
Requesting you to kindly help me to get the refund |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
243 |
CMP/181021/0001473 |
21/10/2018
|
12/11/2022
|
RAVI KUMBHAT |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of entire amount with 12% Compound Interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
244 |
CMP/190225/0002263 |
25/02/2019
|
12/11/2022
|
SHRUTHI SA |
SOBHA ARENA - THE PARK ( BLOCK 2 ) |
Bengaluru Urban |
Refund Rs.18,90,000 along with interest & damages |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
245 |
CMP/190502/0002857 |
02/05/2019
|
12/11/2022
|
Vysaraju Manikantan raju |
SOBHA DREAM ACRES TROPICAL GREENS WING 39 AND 40 |
Bengaluru Urban |
Need refund of my booking amount 4Lakh |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
246 |
CMP/190311/0002401 |
11/03/2019
|
12/11/2022
|
Prashanth |
PURVA WESTEND |
Bengaluru Urban |
Handover as per agreement & collection as per RERA |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
247 |
CMP/190309/0002399 |
09/03/2019
|
12/11/2022
|
VINOTH SAMPATH |
PURVA WESTEND |
Bengaluru Urban |
Compensation as per RERA Act |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
248 |
CMP/190407/0002575 |
07/04/2019
|
12/11/2022
|
PEEYUSH GUPTA |
PURVA WESTEND |
Bengaluru Urban |
compensation as per RERA Rules . |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
249 |
CMP/190412/0002602 |
12/04/2019
|
12/11/2022
|
ASHISH JINDAL |
PURVA WESTEND |
Bengaluru Urban |
Compensation for delay and size mismatch |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
250 |
CMP/190923/0004277 |
23/09/2019
|
12/11/2022
|
DEBABRATA PATI |
SOBHA LAKE GARDENS PHASE 1 |
Bengaluru Urban |
Refund from Sobha along with Interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
251 |
CMP/190820/0003964 |
20/08/2019
|
12/11/2022
|
RUPINDER OBEROI |
PRESTIGE ROYALE GARDENS PHASE-I |
Bengaluru Urban |
Full Refund with interest & compensation. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
252 |
CMP/191104/0004618 |
04/11/2019
|
12/11/2022
|
AMARNATH JADAGOUDA |
SOBHA DREAM ACRES - TROPICAL GREENS PHASE 18 WING 39 AND 40 |
Bengaluru Urban |
Need help to get amount refunded |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
253 |
CMP/191104/0004619 |
04/11/2019
|
12/11/2022
|
MANJUNATH H |
SOBHA ARENA - THE PLAZA (BLOCK 3) |
Bengaluru Urban |
Refund of 1 lac Pre booking cancellation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
254 |
CMP/191031/0004592 |
31/10/2019
|
12/11/2022
|
ANIL MURLIDHAR KHEDEKAR |
RELIAABLE DOLLAR COLLONY PHASE 1A |
Bengaluru Urban |
50000 |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat |
|
255 |
CMP/191121/0004779 |
21/11/2019
|
12/11/2022
|
VIKRAM |
SHRIRAM SUMMITT |
Bengaluru Urban |
Delay compensation as per RERA |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
256 |
CMP/191227/0005085 |
27/12/2019
|
12/11/2022
|
PRAVEEN KUMAR P |
SOBHA VALLEY VIEW - HERITAGE |
Bengaluru Urban |
I need my advance booking amount of Rs.6,00,000/- along with interest. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
257 |
CMP/190610/0002334 |
10/06/2019
|
12/11/2022
|
ARUN KUMAR NECHLANI |
SOBHA SILICON OASIS PHASE 5 WING 10 & 11 |
Bengaluru Urban |
Request you to refund 6.5Lakh Rs with Int. ASAP |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
258 |
CMP/200824/0005826 |
24/08/2020
|
12/11/2022
|
SRIKANTH KONDAPALLY |
SOBHA LIMITED |
Bengaluru Urban |
Refund of complete amount from the promoter |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
259 |
CMP/201204/0007012 |
04/12/2020
|
12/11/2022
|
SURAJ PRASAD |
SOBHA LIMITED |
Bengaluru Urban |
Direct Sobha Ltd to refund remaining booking amount of Rs. 50,000 and interest for inordinate delay in refund |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
260 |
CMP/210628/0008065 |
28/06/2021
|
12/11/2022
|
M S V A PRADEEP |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Immediate Completion of the project with quality, issuance of OC, A-Khata Certificate(Khata Transfer), EB Bill Name Transfer and Compensation till the handover of society |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
261 |
CMP/210914/0008328 |
14/09/2021
|
12/11/2022
|
SHARANA KUMAR |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
262 |
CMP/210625/0008057 |
25/06/2021
|
12/11/2022
|
KOLA AVINASH |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
request to take actions for quick finish the project |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
263 |
CMP/210624/0008054 |
24/06/2021
|
12/11/2022
|
HARI DURGAPRASAD |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Completion of project to the earliest with quality and compensation till date of completion for the loss due to in complete amenities. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
264 |
CMP/210625/0008056 |
25/06/2021
|
12/11/2022
|
SOWMITRI |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
All Pending work as promised has to be completed with in 2months from now |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
265 |
CMP/210627/0008062 |
27/06/2021
|
12/11/2022
|
SHAMBHU NATH YADAV |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Completion of the Complaints to the earliest and due compensation for the delay caused. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
266 |
CMP/210623/0008047 |
23/06/2021
|
12/11/2022
|
MATHIVANAN ELANGOVAN |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Complete the Project without further delay and need status of the Completion and Quality of work also compensation till the handover and for the delayed time period. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
267 |
CMP/211206/0008686 |
06/12/2021
|
12/11/2022
|
MALAY KUMAR K |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Basic amenities are required |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
268 |
CMP/210623/0008049 |
23/06/2021
|
12/11/2022
|
SANDEEP REEDY MUKKAMALLA |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
I want complete all pending work in ss snowdrop apartment . |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
269 |
CMP/210623/0008028 |
23/06/2021
|
12/11/2022
|
SAMARTH SAXENA |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Completion of all amenities as promised by builder at the earliest. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
270 |
CMP/210625/0008055 |
25/06/2021
|
12/11/2022
|
P VIJAYALAXMI |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Early completion of the project with quality and compensation till the handover date |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Settled before 4th Lok Adalat |
|
271 |
CMP/210630/0008081 |
30/06/2021
|
12/11/2022
|
VISHAL ANAND |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
We need proper completion date with Quality material and compensation for delay. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
272 |
CMP/210623/0008052 |
23/06/2021
|
12/11/2022
|
GURUPRASAD UDDANDAM |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Please do the needful as we are not able to catch the builder and they are not under standing our suffering and Enjoying with our hard earned money. Requesting RERA please do proper action on builder. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
273 |
CMP/210623/0008048 |
23/06/2021
|
12/11/2022
|
SHAKTI PRASANNA PATTNAYAK |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Early completion of the project with quality and compensation till handover. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
274 |
CMP/210622/0008025 |
22/06/2021
|
12/11/2022
|
SUBHASMIT PRUSTY |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Expedite the development of the Apartment with all its amenities. Do not give any more relaxation to builder as already 9 months relaxation has been provided. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
275 |
CMP/210623/0008030 |
23/06/2021
|
12/11/2022
|
BIKASH KUMAR |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Complete the Project and Arrange compensation for our losses |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
276 |
CMP/210623/0008053 |
23/06/2021
|
12/11/2022
|
MADUPURI THIRUMALA RAGHAVENDRA PRASAD |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Request to take actions for quick finish the project |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
277 |
CMP/210630/0008084 |
30/06/2021
|
12/11/2022
|
SUJIT RAI |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Yes,Amenities and permanent power supply require. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
278 |
CMP/210630/0008083 |
30/06/2021
|
12/11/2022
|
SHYAM SEKHAR |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
I am expecting to finish the project with all eminities |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
279 |
CMP/210625/0008060 |
25/06/2021
|
12/11/2022
|
POOLLA SESHA VENKATA RAMESH |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Project completion with all amenities as per contractual obligation and compensation sought for poor quality of work |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
280 |
CMP/210628/0008066 |
28/06/2021
|
12/11/2022
|
ARAVIND VENKATAKRISHNAN |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Kindly penalize builders and get the project completed as soon as possible |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
281 |
CMP/210623/0008031 |
23/06/2021
|
12/11/2022
|
SUJEET KUMAR |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
RERA should ask Builder to complete the project as soon as possible else builder should compensate for lack of amenities which was promised at the time of buying. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
282 |
CMP/210630/0008085 |
30/06/2021
|
12/11/2022
|
BRIJESH KUMAR BEHERA |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
EARLY COMPLETION WITH GOOD QUALITY WORK |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
283 |
CMP/210628/0008063 |
28/06/2021
|
12/11/2022
|
NESAMANI |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
We want all the Builder promised things needs to be ready at the earliest. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
284 |
CMP/210623/0008051 |
23/06/2021
|
12/11/2022
|
LOKESH AYYALA |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Completion of amenities, Rework of where poorly finished work for building and compensation for delay if possible |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
285 |
CMP/210623/0008050 |
23/06/2021
|
12/11/2022
|
SATYAPRIYA TARANIA |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Early completion of the project with Quality and compensation till the handover. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
286 |
CMP/210628/0008064 |
28/06/2021
|
12/11/2022
|
JITENDRA KUMAR SAMANTARAY |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Early completion of the project with quality and compensation till handover. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
287 |
CMP/UR/221112/0010263 |
12/11/2022
|
12/11/2022
|
YEMIREDDY SILAS ABISHEK REDDY |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Immediate completion of project with quality, issuance of OC, A-Khata certificate(Khata transfer) , EB bill name transfer and compensation till the handover of society. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Settled before 4th Lok Adalat |
|
288 |
CMP/221102/0010157 |
02/11/2022
|
12/11/2022
|
B SREENIVASULA REDDY |
Sobha Limited |
Bengaluru Urban |
REFUND |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
289 |
CMP/220829/0009959 |
29/08/2022
|
12/11/2022
|
Radhakrishna Nayak |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation for delay in delivery of possession |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
290 |
CMP/220816/0009893 |
16/08/2022
|
12/11/2022
|
Dr PREMALATHA V |
Relationship Properties Private Limited |
Bengaluru Urban |
compensation and interest. (Memo of calculation : 40000 * 12 Months * 4 Year = Rs : 19,20,000 ) |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
291 |
CMP/220928/0010046 |
28/09/2022
|
12/11/2022
|
KIRAN KUMAR E |
S AND S BUILDERS AND DEVELOPERS |
Bengaluru Urban |
expecting the compensation for one year rent for the rented house or waiving of maintenance charges till date and for further one year as well |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat. |
|
292 |
CMP/220614/0009629 |
14/06/2022
|
12/11/2022
|
BINDU S JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation on the full amount paid, by way of interest, penalty. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
293 |
CMP/201218/0007242 |
18/12/2020
|
12/11/2022
|
AANAND VASU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund or compensation as explained above |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled before 4th Lok Adalat. |
|
294 |
CMP/201107/0007032 |
07/11/2020
|
12/11/2022
|
AANAND VASU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Commitment or full refund (refund preferred) |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled before 4th Lok Adalat |
|
295 |
CMP/210408/0007875 |
08/04/2021
|
12/11/2022
|
AANAND VASU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund of amount paid till date with interest accrued till date |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter is settled before 4th Lok Adalat. |
|
296 |
CMP/210406/0007871 |
06/04/2021
|
12/11/2022
|
AANAND VASU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Cancellation of allotment and refund of entire amount paid so far with interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled before 4th Lok Adalat. |
|
297 |
CMP/201127/0007136 |
27/11/2020
|
12/11/2022
|
AANAND VASU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund of full amount paid and cancellation of allotment due to breach of agreement and trust. If cancelled before 31 Dec 2021, I do not need to be compensated for interest. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled before 4th Lok Adalat |
|
298 |
CMP/221010/0010071 |
10/10/2022
|
12/11/2022
|
KALPESH JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
compensation for delay of delivery date of the project as the initial delivery date as per the agreement is 31st dec 2019. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
299 |
CMP/210202/0007564 |
02/02/2021
|
12/11/2022
|
SWETA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
We demand full refund from builder with interest as per RERA act for various violations of RERA Act. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled before 4th Lok Adalat. |
|
300 |
CMP/221112/0010260 |
12/11/2022
|
12/11/2022
|
CHANDRAMALLEGOWDA C |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation and house rent with interest at 18% till handing over possession of the flat. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
301 |
CMP/221112/0010259 |
12/11/2022
|
12/11/2022
|
AKBAR BAIG |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
REFUND OF FULL AMOUNT WITH INTEREST |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
302 |
CMP/221010/0010072 |
10/10/2022
|
12/11/2022
|
ASHIWN KUMAR SAGARMAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
COMPENSATION FOR DELAY OF DELIVERY DATE OF THE PROJECT AS THE INITIAL DELIVERY DATE AS PER THE AGREEMENT IS 32ST DEC 2019. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
303 |
CMP/201219/0007289 |
19/12/2020
|
12/11/2022
|
FEROZE AZEEZ |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Delivery of apartment with project completed in all aspects and compensation for delay; |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter is settled before 4th Lok Adalat |
|
304 |
CMP/210625/0008058 |
25/06/2021
|
12/11/2022
|
Y KRISHNA KISHORE |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
sir, I request you to take action on builder ,to make sure he builds all the facilities, which he promised in a shorter time, Thanks sir. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat |
|
305 |
CMP/221013/0010099 |
13/10/2022
|
12/11/2022
|
Mannath kushlani |
Relationship Properties Private Limited |
Bengaluru Urban |
Complete refund of the amount paid with delay compensation from the dates of payments made at 18% per annum. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
306 |
CMP/221116/0010350 |
16/11/2022
|
12/11/2022
|
PRAKASH KUMAR PUROHIT |
Relationship Properties Private Limited |
Bengaluru Urban |
Interest for the delayed period and also early completion of the flat |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
307 |
CMP/221116/0010352 |
16/11/2022
|
12/11/2022
|
Sapthagirish Bharatwaj S |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation of delayed interest due to delay in handover of possesion at 9.5% pa till 30th sept 2022 and 11.5% pa from 1st oct 2022 till date of possesion handover. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
308 |
CMP/221116/0010351 |
16/11/2022
|
12/11/2022
|
DHARMESH KUMAR KOTARI |
Relationship Properties Private Limited |
Bengaluru Urban |
Monthly delayed compensation with 10% of interest or as per agreement to manager our house rent expenses |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
309 |
CMP/221116/0010349 |
16/11/2022
|
12/11/2022
|
GOPAL SINGH |
Relationship Properties Private Limited |
Bengaluru Urban |
Interest for the delayed period and also early completion of the flat |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
310 |
CMP/220218/0009025 |
18/02/2022
|
12/11/2022
|
sumit jain |
Relationship Properties Private Limited |
Bengaluru Urban |
Monthly compensation with 10% of interest or as per agreement to manager our house rent expenses |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
311 |
CMP/180316/0000585 |
16/03/2018
|
10/11/2022
|
Thomas Abraham |
Sky View |
Bengaluru Urban |
Refund and Compensation along with 21% interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter settled in 4th Lok Adalat |
|
312 |
CMP/221110/0010234 |
10/11/2022
|
10/11/2022
|
Deepak Balasaheb Shinde |
Relationship Properties Private Limited |
Bengaluru Urban |
Handing over possession with interest on delay. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
313 |
CMP/221110/0010235 |
10/11/2022
|
10/11/2022
|
Balasaheb B Pol |
Relationship Properties Private Limited |
Bengaluru Urban |
Handing over possession with interest on delay. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
314 |
CMP/221110/0010236 |
10/11/2022
|
10/11/2022
|
SALAHUDDIN AYUBI S PUNEKAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Delay Compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
315 |
CMP/190405/0002482 |
05/04/2019
|
09/11/2022
|
UMASHANKAR |
MANTRI WEBCITY3A |
Bengaluru Urban |
Either immediate delivery or refund with interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat |
|
316 |
CMP/221107/0010189 |
07/11/2022
|
09/11/2022
|
PANKAJ |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delay. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
317 |
CMP/220812/0009883 |
12/08/2022
|
09/11/2022
|
HEMANTH KUMAR C |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Possession of the property and delay compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
318 |
CMP/181002/0001340 |
02/10/2018
|
08/11/2022
|
AKHILESH KARANTH |
Mantri Serenity |
Bengaluru Urban |
Recover of Pending Amount and Penalty |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Settled before Lok Adalat |
|
319 |
CMP/221028/0010137 |
28/10/2022
|
04/11/2022
|
V V GOURISHANKAR KRUPANIDHI |
ZUARI INFRAWORLD INDIA LIMITED |
Bengaluru Urban |
To recover our advance amount of Rs.51,000/- with interest & any other reliefs. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
320 |
CMP/220920/0010029 |
20/09/2022
|
04/11/2022
|
ANANDA JEEVAVASAHAN |
Sobha Limited |
Bengaluru Urban |
kindly help us to get the refund of Rs 4.00 lacs which we have paid to the builder |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
321 |
CMP/221104/0010177 |
04/11/2022
|
04/11/2022
|
ANANDA JEEVAVASAHAN |
Sobha Limited |
Bengaluru Urban |
KINDLY ENABLE ME GET THE AMOUNT OF Rs 4.00 LACS WHICH I PAID TO THE COMPANY |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
322 |
CMP/220530/0009537 |
30/05/2022
|
04/11/2022
|
Sourav Maity |
BOLLINENI DEVELOPERS LTD |
Bengaluru Urban |
NOC |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
323 |
CMP/221104/0010184 |
04/11/2022
|
04/11/2022
|
VINOD KUMAR C |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
delay compensation and registration. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
324 |
CMP/220818/0009908 |
18/08/2022
|
04/11/2022
|
E R NEMINATHA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation of atleast Rs.40000 per month from January 2020 till the date of hand over of apartment |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
325 |
CMP/221104/0010183 |
04/11/2022
|
04/11/2022
|
GAJENDRA KUMAR PUROHIT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
delay compensation. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
326 |
CMP/211207/0008700 |
07/12/2021
|
02/11/2022
|
M A VARADA |
ZUARI INFRAWORLD INDIA LIMITED |
Bengaluru Urban |
To recover our advance amount of Rs.1,53000/- with penal interest & Justice for Senior Citizens |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled 4th before Lok Adalat. |
|
327 |
CMP/221028/0010136 |
28/10/2022
|
02/11/2022
|
HARSHITHA VARADA |
ZUARI INFRAWORLD INDIA LIMITED |
Bengaluru Urban |
To recover our advance amount of Rs.51,000/- with interest & any other reliefs. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled 4th before Lok Adalat. |
|
328 |
CMP/210306/0007752 |
06/03/2021
|
02/11/2022
|
Kasthuri Selvaraj |
Puravankara Limited |
Bengaluru Urban |
Request RERA help to urge PROVIDENT to refund entire amount 2Lakhs immediately |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
329 |
CMP/221101/0010153 |
01/11/2022
|
02/11/2022
|
Anish Joseph |
Puravankara Limited |
Bengaluru Urban |
I want the builder to show proof that they have completed the flooring and plumbing for apartment from floor 6 and below. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
330 |
CMP/UR/221020/0010124 |
20/10/2022
|
31/10/2022
|
Vijender Devakari |
State Excise Multi Purpose Co-operative Society Limited |
Bengaluru Urban |
Direct the respondents to register the sale deed at the price of 699/- per sqft only and not to make any legal issues in future too. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
331 |
CMP/UR/221017/0010104 |
17/10/2022
|
29/10/2022
|
H K Shama Iyengar |
SREE KRISHNA DEVELOPERS & PROMOTERS |
Bengaluru Urban |
Pray to direct respondents to execute Sale Deed for the Site as per terms in registered Sale Agreement with all mother docs, fully developed with amenities, at no extra cost or further delay, issues. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
332 |
CMP/UR/221013/0010096 |
13/10/2022
|
29/10/2022
|
NAGARAJ S REDDY |
SREE KRISHNA DEVELOPERS & PROMOTERS |
Bengaluru Urban |
Pray to direct respondents to execute Sale Deed for the Site as per terms in registered Sale Agreement with all mother docs, fully developed with amenities, at no extra cost or further delay, issues |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
333 |
CMP/191111/0004690 |
11/11/2019
|
28/10/2022
|
SAMARTHA HEGGADE |
MANTRI SERENITY5 |
Bengaluru Urban |
Compensation from builder as per act |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat. |
|
334 |
CMP/UR/221007/0010055 |
07/10/2022
|
28/10/2022
|
NAGARAJA CHAR M |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Include the project under RERA and abide to the registered sale agreement |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
335 |
CMP/UR/221028/0010134 |
28/10/2022
|
28/10/2022
|
Gurushanthappa MK |
SHEE KRISHNA DEVELOPERS AND PROMOTERS |
Bengaluru Urban |
kindly request RERA to hep me get the sale deed executed in my name at the earliest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
336 |
CMP/UR/221020/0010117 |
20/10/2022
|
28/10/2022
|
SURESHA R |
Sree Krishna developers and promoters |
Bengaluru Urban |
we request you to instruct the promoter for registering the plot at the original contracted rate, I.e 699/- square ft. Pls to note that rate revised deviation is almost 35% |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
337 |
CMP/UR/221018/0010113 |
18/10/2022
|
28/10/2022
|
RAVIKUMAR G |
State excise multipurpose cooperative society ltd |
Bengaluru Urban |
Registration of plot at aggrement price of Rs 699 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
338 |
CMP/UR/221013/0010097 |
13/10/2022
|
28/10/2022
|
Josephin M Baby Anusha |
SREE KRISHNA DEVELOPERS & PROMOTERS |
Bengaluru Urban |
Waive of the hike price from 950 rs to 740 rs as mentioned in the sale agreemnt and allotment of site 79 measinging 1162 sq feet |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
339 |
CMP/UR/221017/0010103 |
17/10/2022
|
28/10/2022
|
Ramakrishnappa V |
SREE KRISHNA DEVELOPERS & PROMOTERS |
Bengaluru Urban |
Pray RERA to direct respondents to execute Sale Deed for the Site 172 as per terms in registered Sale Agreement with all mother docs, fully developed with amenities, at no extra cost or further delay |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
340 |
CMP/210414/0007889 |
14/04/2021
|
21/10/2022
|
VIKRAM KUMAR |
Arvind Hebbal Homes Private Limited |
Bengaluru Urban |
refund of flat booking cancelled |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
341 |
CMP/UR/220321/0009209 |
21/03/2022
|
18/10/2022
|
Puravankara Limited |
Truptha Lakshman |
Bengaluru Urban |
Cancelation and termination of Agreement for sale executed on 31-12-18 for Apt. bearing no. B5-5A-301 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
342 |
CMP/221010/0010080 |
10/10/2022
|
17/10/2022
|
RAMESH TEUNRAM PARSANI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date . Monthly comp. with 18% rate & monthly rent for further delay. NO RERA extensions &new tower register without complaints consent. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
343 |
CMP/UR/220218/0009032 |
18/02/2022
|
14/10/2022
|
Karunakar K |
Provident Housing Limited |
Bengaluru Urban |
1. Respondent be directed to refund the entire booking amount of Rs 13,78,301/- with interest as per RERA guidelines 2. cost of all legal proceedings |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
344 |
CMP/180314/0000574 |
14/03/2018
|
12/10/2022
|
VIGNESH KAMATH |
M/S NITESH ESTATES |
Bengaluru Urban |
Refund of payment along with interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
345 |
CMP/211020/0008454 |
20/10/2021
|
12/10/2022
|
Sahana Somashekara |
Puravankara Limited |
Bengaluru Urban |
I need my advance booking amount of Rs 2,00,000/- along with interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
346 |
CMP/210630/0008075 |
30/06/2021
|
12/10/2022
|
Lavanya Jagadeesh Mirle |
Puravankara Limited |
Bengaluru Urban |
Compensation should be paid by the Builder with Interest rate, for delay in handover of possession of the flat which was agreed as per the agreement signed. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
347 |
CMP/UR/220805/0009858 |
05/08/2022
|
12/10/2022
|
Anne Abraham |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Direct the Respondents to hand over all the documents related to property and abide to the sale agreement and not to make legal issues in future too and register at the price of Rs.699 per Sq.ft only. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
348 |
CMP/UR/220804/0009853 |
04/08/2022
|
12/10/2022
|
MANOHARA A D |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Direct the Respondent to hand over all the documents related to property and abide to the sale agreement and not to make legal issue in future and register at Rs 699/ Sq.ft only |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
349 |
CMP/UR/220802/0009844 |
02/08/2022
|
12/10/2022
|
Pallavi C |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Pray RERA to direct the respondents to honour the sale agreement, register the site at the price as per the sale agreement. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
350 |
CMP/UR/220829/0009957 |
29/08/2022
|
12/10/2022
|
SHASHI BHUSHAN PRASAD D S |
State Excise multipurpose Cooperative Socity |
Bengaluru Urban |
Registration of the plot at the initially agreed rate or refund of all 3 instalments with bank FD compounding interest rate. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
351 |
CMP/UR/220802/0009843 |
02/08/2022
|
12/10/2022
|
Yamini C |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Pray RERA to direct the respondents to honour the sale agreement, register the site at the price as per the sale agreement. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
352 |
CMP/UR/220921/0010034 |
21/09/2022
|
12/10/2022
|
Peter Mathew |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Include the project under RERA and abide to the registered sale agreement |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
353 |
CMP/UR/220811/0009867 |
11/08/2022
|
12/10/2022
|
Niranjan G |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Request RERA to bring the project under RERA and get the site at the rate mentioned in the registered sale agreement |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
354 |
CMP/UR/220922/0010041 |
22/09/2022
|
12/10/2022
|
Shirley T Verghese |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Include the project under RERA and abide to the registered sale agreement |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
355 |
CMP/UR/220730/0009830 |
30/07/2022
|
12/10/2022
|
C V GEETHA |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Pray RERA to direct respondents to execute Sale Deed for the Site 145 as per terms in registered Sale Agreement with all mother docs, fully developed with amenities, at no extra cost or further delay |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
356 |
CMP/UR/220811/0009869 |
11/08/2022
|
12/10/2022
|
Gopal Krishna Patra |
State Excise Multi-Purpose Co-operative Society Ltd |
Bengaluru Urban |
Should get the site as the same cost as agreed in the agreement |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
357 |
CMP/UR/220725/0009811 |
25/07/2022
|
12/10/2022
|
Rajesh S Kataraki |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Direct the respondents to hand over all the documents related to property and abide to the sale agreement and not to make legal issues in future too and register at the price of Rs. 741 per sq ft only |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
358 |
CMP/UR/220629/0009701 |
29/06/2022
|
12/10/2022
|
Veda Murthy Goud Hanchanahal |
State Excise Multi-Purpose Co-operative Society Ltd |
Bengaluru Urban |
Pray to direct respondents to execute Sale Deed for the Site as per terms in registered Sale Agreement with all mother docs, fully developed with amenities, at no extra cost or further delay, issues |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
359 |
CMP/UR/220820/0009919 |
20/08/2022
|
12/10/2022
|
SATYANARAYAN N |
sree krishna developers and promoters |
Bengaluru Urban |
Direct the Respondents to bring the project under RERA and honour the contract as per the above attached registered. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
360 |
CMP/UR/220802/0009842 |
02/08/2022
|
12/10/2022
|
Vijay Pravin |
sree krishna developers and promoters |
Bengaluru Urban |
Pray RERA to direct the respondents to honour the sale agreement, register the site at the price as per the sale agreement. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
361 |
CMP/220801/0009833 |
01/08/2022
|
12/10/2022
|
MADHAN THUKKARAMAN |
BRIGADE ENTERPRISES LTD |
Bengaluru Urban |
Compensation per sale agreement of (SBI MCLR + 2%) * (amount paid: rs.6,799,965). Compensation sought from 12th July. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat |
|
362 |
CMP/191227/0005073 |
27/12/2019
|
12/10/2022
|
Ram Kumar Thakur |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
Possession handover and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat |
|
363 |
CMP/200618/0005840 |
18/06/2020
|
12/10/2022
|
Shashank Peddakotla |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
To handover the apartment and pay delay compensation as per RERA Act |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat |
|
364 |
CMP/210623/0008046 |
23/06/2021
|
11/10/2022
|
Kunal Kundu |
Sobha Limited |
Bengaluru Urban |
I want Sobha to refund the booking amount with interest due for the period of delay |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
365 |
CMP/220607/0009594 |
07/06/2022
|
30/09/2022
|
Tanuj J Reddy and Kavitha |
ASSETZ BUILDWELL LLP |
Bengaluru Urban |
To intervene and direct developer to hand over the project with agreed specification and provide delay compensation from 30 March 21 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
366 |
CMP/200406/0005653 |
06/04/2020
|
28/09/2022
|
PRASHANTHA MUNDKOD KRISHNAPPA |
PRESTIGE LAKESIDE HABITAT |
Bengaluru Urban |
A proper hand over with appropriate compensation for delay and allotment of 2 car parks as promised OR 100% refund with compensation for damages caused by them. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat. |
|
367 |
CMP/220613/0009618 |
13/06/2022
|
28/09/2022
|
K B CHANNAPPA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Hence it is respectfully prays before the tribunal to direct the respondent to hand over the possession of the property as early as possible and further direct them to pay hectic compensation for the |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat. |
|
368 |
CMP/180306/0000551 |
06/03/2018
|
27/09/2022
|
Mayur Chakravarty |
SHRIRAM SUMMITT |
Bengaluru Urban |
Payment of compensation for delay |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat. |
|
369 |
CMP/210824/0008266 |
24/08/2021
|
27/09/2022
|
Sanjiv P Deshpande |
Provident Housing Limited |
Bengaluru Urban |
Direction for payment of Delay Compensation and Damages to the tune of Rs. 51,14,043/- |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
370 |
CMP/180711/0001030 |
11/07/2018
|
26/09/2022
|
CHETAN DEVARAJU |
SHRIRAM SOUTHERN CREST |
Bengaluru Urban |
refund amount+interest+compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat. |
|
371 |
CMP/190923/0004272 |
23/09/2019
|
23/09/2022
|
KANNAN |
OCEANUS CLASSIC |
Bengaluru Urban |
Return of money with applicable penalty / interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat. |
|
372 |
CMP/220630/0009708 |
30/06/2022
|
23/09/2022
|
Mrs Anju Krishnan K |
Century Real Estate Holdings Private Limited |
Bengaluru Urban |
To direct the respondent to refund the booking amount along with interest, compensation and legal cost amounting to Rs. 3,00,000/- |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
373 |
CMP/220712/0009740 |
12/07/2022
|
23/09/2022
|
Mrs C Latha |
Century Real Estate Holdings Private Limited |
Bengaluru Urban |
To direct the respondent to refund the booking amount along with interest, compensation and legal cost amounting to Rs. 3,00,000/- |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
374 |
CMP/UR/220707/0009730 |
07/07/2022
|
23/09/2022
|
Sudipta Gouri |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Pray RERA to direct the respondents to honour the sale agreement, register the site at the price as per sale agreement. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
375 |
CMP/UR/220512/0009455 |
12/05/2022
|
23/09/2022
|
Anand Sridharan |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Pray RERA to direct the respondents to honour the sale agreement, register the site at the price as per the sale agreement. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
376 |
CMP/UR/220629/0009700 |
29/06/2022
|
23/09/2022
|
Mallikarjun kondapur |
Sree Krishna Developers and Promoters |
Bengaluru Urban |
Direct the respondents to hand over all the documents related to property and abide to the sale agreement and not to make legal issues in future too and register at the price of Rs 741 per Sq ft only |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
377 |
CMP/UR/220430/0009404 |
30/04/2022
|
23/09/2022
|
Arunkumar Porpatham |
Sree Krishna Developers And Promoters |
Bengaluru Urban |
Direct the Respondents to hand over all the documents related to property and abide to the sale agreement and not to make legal issues in future too and register at the price of Rs.699 per Sq.ft only |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
378 |
CMP/UR/220504/0009414 |
04/05/2022
|
23/09/2022
|
karthik venkatraman |
Sree Krishna developers and promoters |
Bengaluru Urban |
Direct the respondents to hand over all documents related to the property and abide by the sale agreement and not make legal issues in future and register at the price of Rs 699 per sqft s agreed |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
379 |
CMP/UR/220426/0009386 |
26/04/2022
|
23/09/2022
|
P V BIJU |
SREE KRISHNA DEVELOPERS AND PROMOTERS |
Bengaluru Urban |
As a petitoner I respectfully pray RERA be pleased to adjudicate the dispute & pass an order directing the Respondent to register the sale deeds in favour of the Petitioner in accordance with terms SA |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
380 |
CMP/UR/220504/0009420 |
04/05/2022
|
23/09/2022
|
Rukmani |
sree krishna decelopers & Promoters |
Bengaluru Urban |
Direct the respondent to abide by sale agreement and register at Rs.699/- per sq feet only |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
381 |
CMP/UR/220504/0009417 |
04/05/2022
|
23/09/2022
|
Kumar Velan H |
Sree Krishna Developers and Promotes |
Bengaluru Urban |
Direct the respondent to hand over all the documents related to property and abide to sale agreement and not to make legal issues in future too and register at the price of Rs.741 per sq ft |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
382 |
CMP/UR/220530/0009544 |
30/05/2022
|
23/09/2022
|
PUSHPA A |
Sree Krishna Developers And Promoters |
Bengaluru Urban |
Kindly request to direct the Respondents to hand over all the documents related to property and abide to the sale agreement and not to make legal issues in future too and register it to Rs.699/Sq.ft. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
383 |
CMP/UR/220630/0009706 |
30/06/2022
|
23/09/2022
|
Gobinda Chandra Patra |
State Excise Multi-Purpose Co-operative Society Ltd |
Bengaluru Urban |
Should get the site as the same cost as agreed in the agreement |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
384 |
CMP/UR/220517/0009477 |
17/05/2022
|
23/09/2022
|
Smaran Mudbidri |
SREE KRISHNA DEVELOPERS & PROMOTERS |
Bengaluru Urban |
Pray RERA to direct the respondents to handover all documents related to the property and abide by the sale agreement and register the site at price as per sale agreement, not create further issues |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
385 |
CMP/UR/220517/0009478 |
17/05/2022
|
23/09/2022
|
Suma Mudbidri |
SREE KRISHNA DEVELOPERS & PROMOTERS |
Bengaluru Urban |
Pray RERA to direct the respondents to handover all documents related to the property and abide by the sale agreement and register the site at price as per sale agreement, not create further issues |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
386 |
CMP/191102/0004608 |
02/11/2019
|
22/09/2022
|
RAGOLU SRINIVASA RAO AND ANOTHER |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Direct the respondents to pay compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
The matter is settled before 4th Lok Adalat. |
|
387 |
CMP/191102/0004607 |
02/11/2019
|
22/09/2022
|
D KARTHIK AND ANOTHER |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Direct the respondents to pay compensation. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
The matter is settled before 4th Lok Adalat. |
|
388 |
CMP/220902/0009972 |
02/09/2022
|
22/09/2022
|
SRIRAM NARAYANAN |
M/S.YD BUILDERS |
Bengaluru Urban |
Completion of pending work and provision of promised 2nd car parking space |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
Matter is settled before 4th Lok Adalat. |
|
389 |
CMP/211207/0008695 |
07/12/2021
|
22/09/2022
|
ABHISHEK MITRA |
M/S.YD BUILDERS |
Bengaluru Urban |
- Complete all amenities (party hall and gym) as per project brochure. - Provide STP and solar power as mandated by BBMP bylaw - Complete terrace water proofing - Rectify UDS |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled before 4th Lok Adalat. |
|
390 |
CMP/UR/220308/0009089 |
08/03/2022
|
22/09/2022
|
Dharmappa Sannellappanavar |
Mr Shrikanth |
Bengaluru Urban |
Refund of Rs 50000/- paid as application money |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
391 |
CMP/210408/0007877 |
08/04/2021
|
22/09/2022
|
Ganapati Gopalkrishna Bhat |
Puravankara Limited |
Bengaluru Urban |
Action to be taken against the builder for giving the false information and documents , hence need the compensation for the advance payment (Rs.9.07 Lakhs) |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
392 |
CMP/201214/0007248 |
14/12/2020
|
22/09/2022
|
S Srinivasa Kumar |
RED CORAL PROPERTIES |
Bengaluru Urban |
Immediate possession of Flat No.209(Block-C), delay compensation for two years, project completion in all respects, etc. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
Matter is settled before 4th Lok Adalat |
|
393 |
CMP/180327/0000625 |
27/03/2018
|
19/09/2022
|
Elangovan Alagappan |
Nitesh Columbus Square Phase II |
Bengaluru Urban |
Refund all payments made to Nitesh with interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled before 4th Lok Adalat. |
|
394 |
CMP/220629/0009703 |
29/06/2022
|
16/09/2022
|
Kiran Vaishnav |
Jain Housing & Construction Ltd. |
Bengaluru Urban |
Refund of our amount paid along with interest and advocate charges |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
395 |
CMP/220511/0009452 |
11/05/2022
|
14/09/2022
|
Elesh Kumar Bighane |
Ruchira Projects Pvt Ltd |
Bengaluru Urban |
Compensation from builder so that i can pay EMI and rent on time. EMI 35000+ rent 20000 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
396 |
CMP/UR/220405/0009311 |
05/04/2022
|
09/09/2022
|
Sachin Kumar Joshi |
Provident Housing Limited |
Bengaluru Urban |
Refund of amount along with interest. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
397 |
CMP/UR/201008/0006786 |
08/10/2020
|
08/09/2022
|
Hymanand Nellore |
Lakepoint Builders Pvt Ltd |
Bengaluru Urban |
Since he was not aware of terms and conditions and payment dates; he prays for waiver of additional interest and compensation in the form rent , comepnsation of mental harrasment and refund of expens |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
398 |
CMP/220829/0009955 |
29/08/2022
|
08/09/2022
|
SUDHIR RAMDAS KINI |
Sobha Limited |
Bengaluru Urban |
REFUND OF RS.8,88,487/- WITH INTEREST TILL DATE OF PAYMENT |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter is settled before 4th Lok Adalat |
|
399 |
CMP/190202/0002044 |
02/02/2019
|
13/08/2022
|
NIKHIL BHAVE |
KOLTE PATIL DEVELOPERS LTD |
Bengaluru Urban |
Fair delay compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
400 |
CMP/190209/0002082 |
09/02/2019
|
13/08/2022
|
SEETHA A |
PURVA STAR PROPERTIES LTD |
Bengaluru Urban |
Compensation as per RERA Act |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
401 |
CMP/190321/0002481 |
21/03/2019
|
13/08/2022
|
AMAR N S |
PURAVANKARA LIMITED |
Bengaluru Urban |
Asking for refund of money. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
402 |
CMP/181204/0001712 |
04/12/2018
|
13/08/2022
|
ABHISHEK SINHA |
BHARTIYA CITY DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Direction to Builder to fulfill its liability |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
403 |
CMP/180915/0001276 |
15/09/2018
|
13/08/2022
|
Srihari S Dhandapani |
PURAVANKARA LIMITED |
Bengaluru Urban |
Refund of the advance |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
404 |
CMP/190422/0002737 |
22/04/2019
|
13/08/2022
|
SANDEEP DHAR |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Compensation on delay, Handover with OC. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
405 |
CMP/190416/0002487 |
16/04/2019
|
13/08/2022
|
ZAHEER AHMED MULLA |
PURAVANKARA LIMITED |
Bengaluru Urban |
Compensation as per Rera act & recent SC Judgement |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
406 |
CMP/190611/0003274 |
11/06/2019
|
13/08/2022
|
K P SRINIVAS |
PURAVANKARA LIMITED |
Bengaluru Urban |
Refund of Buyer’s investment with interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
407 |
CMP/190716/0003605 |
16/07/2019
|
13/08/2022
|
MR.RAMANUJAM.R & MRS.JAYASHREE.SMR.RAMANUJAM.R & MRS.JAYASHREE.S |
MANTRI SERENITY4 |
Bengaluru Urban |
delay compensation as per RERA Provisions |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
408 |
CMP/191111/0004685 |
11/11/2019
|
13/08/2022
|
PARAMASHIVAIAH M C |
GALLIUM AT BRIGADE EL DORADO |
Bengaluru Urban |
To strictly adhere to Original Plan |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
409 |
CMP/190803/0003745 |
03/08/2019
|
13/08/2022
|
USHA RANGARAJAN |
SOBHA HRC PRISTINE PHASE 1 BLOCK 1 |
Bengaluru Urban |
Refund per regulation in 45 days |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
410 |
CMP/180312/0000565 |
12/03/2018
|
13/08/2022
|
NAVEEN PRABHU M |
BSNL AERO PARK RESIDENCY DEVANAHALLI |
Bengaluru Urban |
ALLOTMENT OF SITE AT THE EARLIEST |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
411 |
CMP/UR/190311/0002415 |
11/03/2019
|
13/08/2022
|
ANIL VALOOR |
EXPAT GROUP |
Bengaluru Urban |
Help me to get the refund plus compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
412 |
CMP/191115/0004727 |
15/11/2019
|
13/08/2022
|
SUDHANVA S SHETTY |
SOBHA FOREST EDGE |
Bengaluru Urban |
Request RERA to interfere and help me in getting refund of Rs 200000. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
413 |
CMP/191101/0004606 |
01/11/2019
|
13/08/2022
|
BHAT JAGDISH KRISHNAMURTHY |
STERLING POINTE |
Bengaluru Urban |
Refund of amt paid plus agreed compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
414 |
CMP/190810/0003856 |
10/08/2019
|
13/08/2022
|
SWARNIM SRIVASTAVA |
SERENE AT BRIGADE CORNERSTONE UTOPIA |
Bengaluru Urban |
Refund of Booking amount of Rs 200000 |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
415 |
CMP/200220/0005481 |
20/02/2020
|
13/08/2022
|
NITIN SINGH |
SHRIRAM CHIRPING WOODS |
Bengaluru Urban |
Refund with interest for the 20% downpayment made in March 2015 and penalty for the delay in payment |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
416 |
CMP/211201/0008661 |
01/12/2021
|
13/08/2022
|
ARUNAVA ROY |
M/S. SADHGURU DEVELOPERS |
Bengaluru Urban |
Physical, social damages and harassment caused by the builder should be compensated by the builder |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
417 |
CMP/201109/0007027 |
09/11/2020
|
13/08/2022
|
Umesh N S |
Mantri Castles Pvt Ltd |
Bengaluru Urban |
As prayed in the Facts of Complaints |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
418 |
CMP/200618/0005725 |
18/06/2020
|
13/08/2022
|
Nilesh Pancholi |
Mantri Castles Pvt Ltd |
Bengaluru Urban |
Delay Compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
419 |
CMP/200909/0006547 |
09/09/2020
|
13/08/2022
|
SANJAY JAIN |
BHARTIYA CITY DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Delay compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
420 |
CMP/UR/191225/0005014 |
25/12/2019
|
13/08/2022
|
DINESH KUMAR |
KARNATAKA POSTAL AND TELECOM EMPLOYEE'S HOUSING CO-OPERATIVE SOCIETY |
Bengaluru Urban |
Refund with compensation or site allocation as promised |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
421 |
CMP/210420/0007912 |
20/04/2021
|
13/08/2022
|
KASTURI NANJUNDAIAH |
LEGACY GLOBAL PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
I personally request RERA to ask the promoter to refund me the entire Rs 55, 00,000 with interest. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
422 |
CMP/200910/0006543 |
10/09/2020
|
13/08/2022
|
ANANDDUNDAPPAKOUDI |
VALMARK DEVELOPERS PVT LTD |
Bengaluru Urban |
Wherefore this is respectfully prayed before this Honorable Court that to direct the Builder to Pay full refund with interest and compensation for the delayed period as well. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
423 |
CMP/210709/0008112 |
09/07/2021
|
13/08/2022
|
SANJAY GUPTA |
ANTEVORTA DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of amount and Compensation by way of interest. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
424 |
CMP/210531/0007971 |
31/05/2021
|
13/08/2022
|
SANJEETA PRASAD |
ALEKHYA PROPERTY DEVELOPMENTS PVT LTD |
Bengaluru Urban |
Process refund of money with interest. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
425 |
CMP/220321/0009217 |
21/03/2022
|
13/08/2022
|
SENTHIL MURUGAN |
PURAVANKARA LIMITED |
Bengaluru Urban |
Refund of the booking amount INR:200,000/- from the builders. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
426 |
CMP/220806/0009860 |
06/08/2022
|
13/08/2022
|
PRATEEK UJJWAL |
JANAPRIYA ENGINEERS SYNDICATE PRIVATE LIMITED |
Bengaluru Urban |
Compensation & Possession |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
427 |
CMP/UR/220321/0009185 |
21/03/2022
|
13/08/2022
|
PURAVANKARA LIMITED |
Chethan sinha |
Bengaluru Urban |
To cancel the Agreement for Sale executed on 5-7-18and registered as document no. JPN-1-03346-2018-19 in CD No. JPND520for the unit no. B5-5A-605 and issue direction to concerned sub registrar accord |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
428 |
CMP/200926/0006604 |
26/09/2020
|
13/08/2022
|
SUDHEER BABU |
JAIN HEIGHTS AND STRUCTURES PVT LTD |
Bengaluru Urban |
I WANT TO CLOSE THE AGREEMENT AS AGREED BUILDER TO REFUND THE AMOUNT AND BUILDER TO CLOSE BANK LOAN |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
429 |
CMP/UR/220321/0009179 |
21/03/2022
|
13/08/2022
|
PURAVANKARA LIMITED |
Sudha S S |
Bengaluru Urban |
To cancel the Agreement for Sale executed on 21-6-18 and registered as doc JPN-1-07525-2018-19 in CD No.JPND530 and issue direction to the concerned Sub Registrar accordingly |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
430 |
CMP/UR/220321/0009188 |
21/03/2022
|
13/08/2022
|
PURAVANKARA LIMITED |
M Sudha Rani |
Bengaluru Urban |
To cancel the Agreement for Sale executed 31-7-21 and registered as document no. JPN-1-02582-2018-19 in CD No JPND519 for the unit no. B4-4B-906 issue direction to concerned sub registrar accordingly |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
431 |
CMP/201009/0006797 |
09/10/2020
|
13/08/2022
|
VBHC MUMBAI VALUE HOMES PRIVATE LIMITED |
Sundar M |
Bengaluru Urban |
Payment of Amounts with interest failing which forfeiture of amount paid with penalty and cancellation of agreement for sale |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
432 |
CMP/220624/0009679 |
24/06/2022
|
13/08/2022
|
VENKATA SREE HARSA DESAI |
SOBHA LIMITED |
Bengaluru Urban |
Advance amount needs to be refunded from SOBHA |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
433 |
CMP/210326/0007842 |
26/03/2021
|
13/08/2022
|
DONALD SANGSTER MONTHERO |
ZUARI INFRAWORLD INDIA LIMITED |
Bengaluru Urban |
Refund of Rs. 3,77,667/- paid by the Complainant with interest and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
434 |
CMP/210326/0007841 |
26/03/2021
|
13/08/2022
|
SYRIL MONTHERO |
ZUARI INFRAWORLD INDIA LIMITED |
Bengaluru Urban |
Refund of Rs. 3,52,428/- paid by the Complainant with interest and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
435 |
CMP/220718/0009756 |
18/07/2022
|
13/08/2022
|
TAMMANAGOUDA PATIL |
ZUARI INFRAWORLD INDIA LIMITED |
Bengaluru Urban |
Refunding of Paid amount |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
436 |
CMP/220713/0009742 |
13/07/2022
|
13/08/2022
|
ASHUJI DISTRIBUTORS |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Handover the flat with Possession and composition with interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
437 |
CMP/220708/0009732 |
08/07/2022
|
13/08/2022
|
RAMESH MEHAR G |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Hand-over the flat and Delay hand over Composition with Interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
438 |
CMP/220810/0009861 |
10/08/2022
|
13/08/2022
|
VIMAL KUMAR PUROHIT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
NEED COMPENSATION AS PER RERA GUIDELINES |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
439 |
CMP/220812/0009887 |
12/08/2022
|
13/08/2022
|
ASHOK KUMAR MALI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum intrest till date. Monthly comp. With 18% rate & monthly rental for further delay. No RERA extension & new tower register without complaints consent |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
440 |
CMP/220811/0009878 |
11/08/2022
|
13/08/2022
|
GOWTHAM KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for Delay in Consturciton as per Agreement |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
441 |
CMP/220811/0009879 |
11/08/2022
|
13/08/2022
|
RAJKUMAR SHAH |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Possession of the property along with interest on delay. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
442 |
CMP/220622/0009653 |
22/06/2022
|
13/08/2022
|
RUDHRA PRASAD M S |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation from Respondents(ParkWest) |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
443 |
CMP/220328/0009261 |
28/03/2022
|
13/08/2022
|
VINEET NIDHI DUGAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
compensation and house rent with 18% per annum interest till date.Monthly compensation with 18% rate and monthly rental for further delay .No rera extension |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
444 |
CMP/220810/0009862 |
10/08/2022
|
13/08/2022
|
BHABUTMAL PUROHIT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
REQUEST FOR COMPENSATION AS PER RERA GUIDELINES |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
445 |
CMP/220706/0009719 |
06/07/2022
|
13/08/2022
|
LALITHA SHIVAKUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Completion and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
446 |
CMP/210819/0008258 |
19/08/2021
|
13/08/2022
|
ASHISH MANOJ MHETAR |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Respective Compensation from Builder for the Delay as per RERA norms |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
447 |
CMP/220812/0009885 |
12/08/2022
|
13/08/2022
|
MADANLAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum intrest till date.monthly comp. With 18% rate & monthly rental for further delay. No RERA extension & new tower register without complaints consent |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
448 |
CMP/220720/0009778 |
20/07/2022
|
13/08/2022
|
SREENIVASA KUMAR AKSHINTHALA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
As per the agreed terms with RPPL , seeking help from RERA to help us for eligible compensation at the earliest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
449 |
CMP/210809/0008230 |
09/08/2021
|
13/08/2022
|
AJAY KRISHNA KALANGI |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
GST refund, Delay compensation, No more demand notes to be raised by builder |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
450 |
CMP/201011/0006814 |
11/10/2020
|
13/08/2022
|
RAMESH KUMAR J |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
IMMEDIATE RESTART OF WORK ON THE PROJECT[ THEY HAVE TAKEN 90% AMOUNT] AND INTEREST FOR THE DELAYED PERIOD. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
451 |
CMP/220622/0009652 |
22/06/2022
|
13/08/2022
|
CHANDRAKANTH K |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
POSSESSION AND COMPENSATION AT 18% PA UPTILL POSSESSION DATE BY PROMOTOR |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
452 |
CMP/200117/0005249 |
17/01/2020
|
13/08/2022
|
PAWAN KUMAR MITTAL |
PRESTIGE ESTATES PROJECTS LIMITED |
Bengaluru Urban |
Interest for delay in Possession |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
453 |
CMP/201120/0007097 |
20/11/2020
|
13/08/2022
|
RAMENDRA SINGH |
Godrej Nurture |
Bengaluru Urban |
I want RERA to help me getting my hard earned money back. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
454 |
CMP/220329/0009276 |
29/03/2022
|
13/08/2022
|
LOHITH JAGADISH SALIGRAM |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation at 18% per annum interest till date. No RERA extensions & new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
455 |
CMP/220725/0009797 |
25/07/2022
|
13/08/2022
|
RAMANATH B G |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Interest compensation for delay. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
456 |
CMP/220615/0009636 |
15/06/2022
|
13/08/2022
|
SUKRUTA S |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
1) Compensation and house rent @ 18% p.a till date 2) monthly compensation @ 18% and monthly rental for future delay |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
457 |
CMP/210828/0008280 |
28/08/2021
|
13/08/2022
|
AMIT VIJAYVARGIYA |
SHRIVISION HOMES PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking amount with interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
458 |
CMP/201124/0007121 |
24/11/2020
|
13/08/2022
|
RAJANI KANTH |
MANTRI DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Prayers to RERA in asking MDPL to pay the EMI till possession and if unable to delivery the Flat, return my investment along with interest as per RERA standards |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
459 |
CMP/210220/0007672 |
20/02/2021
|
13/08/2022
|
ABHISHEK GUPTA |
SHRIVISION HOMES PRIVATE LIMITED |
Bengaluru Urban |
Need your help in getting my money back as they are hiding facts and lie during sale of apartments |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
460 |
CMP/220811/0009880 |
11/08/2022
|
13/08/2022
|
BHAGWAN RAJ PUROHIT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Possession of the property and interest on delay. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
461 |
CMP/220316/0009140 |
16/03/2022
|
13/08/2022
|
VASANTH KUMAR J |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
I request your good office to direct developer to early handover of possession of duly Completed Plot in my name and pay interest of 18% pa from the date of promise to till the date of actual handover |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
462 |
CMP/220628/0009697 |
28/06/2022
|
13/08/2022
|
BASAVALINGAPPA ROUDKUNDHI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delayed period |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
463 |
CMP/220623/0009663 |
23/06/2022
|
13/08/2022
|
C N GIRIDHAR MURTHY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
COMPENSATION BY WAY OF INTEREST ON THE MONEY PAID AND ALSO PENALITY FOR DELAY DUE TO HARDSHIP UNTIL THE DATE OF DELIVERY |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
464 |
CMP/220321/0009174 |
21/03/2022
|
13/08/2022
|
OMPRAKASH JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation and delivery of flat |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
465 |
CMP/220623/0009665 |
23/06/2022
|
13/08/2022
|
GURUSIMHA C |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation by way of interest on money paid & also penalty for delayed due to hardship until the date of delivery of the flat |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
466 |
CMP/220812/0009886 |
12/08/2022
|
13/08/2022
|
BHARAT KUMAR MALI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum intrest till date. Monthly comp with 18%, rate & monthly rental for further delay No RERA extension & new tower register without complaints consent |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
467 |
CMP/211031/0008509 |
31/10/2021
|
13/08/2022
|
Nilkanth Iyer |
Relationship Properties Private Limited |
Bengaluru Urban |
Refund of entire payment amount + interest to be paid for the 90% payment taken |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
468 |
CMP/220625/0009689 |
25/06/2022
|
13/08/2022
|
Sangameshkumar Bandi |
Relationship Properties Private Limited |
Bengaluru Urban |
Direct the builder to give possession ASAP and provide the appropriate Compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
469 |
CMP/220725/0009808 |
25/07/2022
|
13/08/2022
|
Tushar Singh |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
470 |
CMP/220721/0009787 |
21/07/2022
|
13/08/2022
|
Tushar Singh |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
471 |
CMP/220608/0009602 |
08/06/2022
|
13/08/2022
|
Govardhan H B |
Relationship Properties Private Limited |
Bengaluru Urban |
we need early completion along with compensation towards delay with interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
472 |
CMP/220603/0009582 |
03/06/2022
|
13/08/2022
|
Chaitra Ramachandra |
Relationship Properties Private Limited |
Bengaluru Urban |
Order for immediate completion of the project early and compensation for severe delay caused & if builder is unable to do so option to exit the project with full repayment with interest & compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
473 |
CMP/220119/0008832 |
19/01/2022
|
13/08/2022
|
Prasanna Thiyagarajan V |
M/s.YD BUILDERS |
Bengaluru Urban |
Cancellation of Exchange Deed of Flat no. 418, UDS rectification in sale deed, clarify OC status, Project completion with all amenities or compensation in this regard. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
474 |
CMP/UR/200214/0005294 |
14/02/2020
|
13/08/2022
|
Durai Singh |
Mahindra Homes Private Limited |
Bengaluru Urban |
Refund of Rs. 4,74,333 with interest @9% from 01.09.2017 till 31.12.2018. Therefore total refund sought is for Rs. 5,27,695. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
475 |
CMP/UR/220421/0009378 |
21/04/2022
|
13/08/2022
|
MR VEERABHADRA G Y PATIL |
MR. K R MURALIKUMAR DIRECTOR CHARMION DIRECTOR, CHARMION AIHSWA |
Bengaluru Urban |
BUY-BACK AGREEMENT IS WITH 20% RETRUN ON INVESTMENT FROM THE DATE OF PAYMENT MADE AND TO THE DATE OF REFUNDAS MENTIONED IN THE AGREEMENT AND THE TIME FRAME AS AGREED |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
476 |
CMP/UR/200702/0006109 |
02/07/2020
|
13/08/2022
|
TILAGAVATHI |
R KRISHNA, NISARGA GATEWAY |
Bengaluru Urban |
possession of the flat and payment of monthly rent from 01 07 2013 with interest till date of delivery of possession |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
477 |
CMP/UR/200702/0006110 |
02/07/2020
|
13/08/2022
|
BALARAMAN JAYACHANDRAN |
R KRISHNA, NISARGA GATEWAY |
Bengaluru Urban |
possession of the flat and payment of monthly rent from 01 07 2013 with interest till date of delivery of possession |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
478 |
CMP/220310/0009106 |
10/03/2022
|
13/08/2022
|
ABHINANDAN H N |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
1. There should not be any further extension provided towards this project 2. request rera to do an on spot inspection and verify the facts 3. instruct the builder for suitable relief |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
479 |
CMP/210108/0007422 |
08/01/2021
|
12/07/2022
|
ERROL JOHN NORONHA |
ERROL JOHN NORONHA & DELFINA NORONHA |
Bengaluru Urban |
PLEASE REFUND ALL THE MONIES PAID TILL DATE AND PAY THE INTEREST OF 18% FROM AMOUNT PAID DATE |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
Matter has been settled before Lok-Adalat. |
|
480 |
CMP/180314/0000571 |
14/03/2018
|
25/06/2022
|
Mandava Kesava Rao |
NITESH ESTATES LIMITED |
Bengaluru Urban |
With above level of incompleteness in project, we |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
481 |
CMP/180811/0001131 |
11/08/2018
|
25/06/2022
|
Nirvikar Singh |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Payment of PreEMI Backlog in One Short |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
482 |
CMP/180502/0000798 |
02/05/2018
|
25/06/2022
|
NAGESH .B |
NITESH SHETTY |
Bengaluru Urban |
Handover of the apartment immediately. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
483 |
CMP/190311/0002422 |
11/03/2019
|
25/06/2022
|
MS. RAJ RANI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund of amount with GST and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
484 |
CMP/190311/0002417 |
11/03/2019
|
25/06/2022
|
RAJESH KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking amount with compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
485 |
CMP/190528/0003188 |
28/05/2019
|
25/06/2022
|
KUMAR ABHISHEK |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Full Refund amount plus penalty |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
486 |
CMP/190626/0003405 |
26/06/2019
|
25/06/2022
|
K C RAVINDRA |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
return of amount and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
487 |
CMP/190808/0002190 |
08/08/2019
|
25/06/2022
|
SAPTARSHI PATHAK |
SRI CHOWDESHWARI PROJECTS |
Bengaluru Urban |
Refund of Amount paid to Builder with Interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
488 |
CMP/191021/0004513 |
21/10/2019
|
25/06/2022
|
MAHANTESH R GUNDALI |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Full REfund amount with penalty |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
489 |
CMP/191024/0004100 |
24/10/2019
|
25/06/2022
|
AJEET KUMAR MALL |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Principal payment with interest as per RERA rules |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
490 |
CMP/190525/0003134 |
25/05/2019
|
25/06/2022
|
SPVNV BHADRAM |
VALUE DESIGNBUILD PRIVATE LIMITED |
Bengaluru Urban |
Complete refund of the monies paid by us and hdfc |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
491 |
CMP/190909/0003878 |
09/09/2019
|
25/06/2022
|
PARIMALA JAMADAGNI & G S JAMADAGNI |
TAPOVAN PROJECTS |
Bengaluru Urban |
Refund of amount paid with interest and compensati |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
492 |
CMP/191105/0004631 |
05/11/2019
|
25/06/2022
|
SAI VENKAT KUMAR |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
compensation and possession of the flat |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
493 |
CMP/190924/0004300 |
24/09/2019
|
25/06/2022
|
Deepa Nair |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Compensation and refund |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
494 |
CMP/190926/0004239 |
26/09/2019
|
25/06/2022
|
SUNIL PUTTY |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Completion / OC of the apartment and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
495 |
CMP/191015/0004462 |
15/10/2019
|
25/06/2022
|
Sandeep Kumar Mahapatra |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Compensation Amount and Delivery of the Project |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
496 |
CMP/190928/0004332 |
28/09/2019
|
25/06/2022
|
Balamurugan J |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Timely delivery of flat and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
497 |
CMP/191109/0004665 |
09/11/2019
|
25/06/2022
|
Sachin Gupta |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
To ensure prompt completion of project otherwise full payment made to promoter with interest to be refunded |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
498 |
CMP/191117/0004651 |
17/11/2019
|
25/06/2022
|
Haritha Krishna Vijapurapu |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Completed apartment or full refund compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
499 |
CMP/190924/0004248 |
24/09/2019
|
25/06/2022
|
KANCHAN ROY |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Compensation as claimed in complainant facts |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
500 |
CMP/191004/0004418 |
04/10/2019
|
25/06/2022
|
Rakesh Kumar Verma |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Compensation and Delivery of Flat ND Passion Elite |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
501 |
CMP/190928/0004336 |
28/09/2019
|
25/06/2022
|
manish bhargava |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Possession of Flat Required with compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
502 |
CMP/190926/0004324 |
26/09/2019
|
25/06/2022
|
Sreejit Nair |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Possession of Flat by Dec 2019 or Compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
503 |
CMP/190924/0004288 |
24/09/2019
|
25/06/2022
|
Debashis Mohanty |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
ND Elite project with OC and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
504 |
CMP/190924/0004294 |
24/09/2019
|
25/06/2022
|
Soya Joseph |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Possession of Flat with Compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
505 |
CMP/190930/0004362 |
30/09/2019
|
25/06/2022
|
Mr. MANSURALI. M. FAROQUI |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Compensation and Delivery of ND Passion Elite Flat |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
506 |
CMP/191005/0004401 |
05/10/2019
|
25/06/2022
|
Viraj Nayak |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Possession of flat with compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
507 |
CMP/191215/0004992 |
15/12/2019
|
25/06/2022
|
MANISH DUBEY |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Property Delivery from builder with compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
508 |
CMP/200112/0005207 |
12/01/2020
|
25/06/2022
|
KRISHNA KUMAR.P |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Cancel the contract and refund all the money paid till date with interest, along with the financial compensation for the financial loss |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
509 |
CMP/191021/0004522 |
21/10/2019
|
25/06/2022
|
ROOPA NAYAKANAHALLI TAMMANNAGOWDA |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Refund of Amt paid with interest and compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
510 |
CMP/200224/0005522 |
24/02/2020
|
25/06/2022
|
NATARAJAN RAMAN |
MANTRI TECHNOLOGY CONSTELLATIONS PVT. LTD. |
Bengaluru Urban |
To handover possession with compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
511 |
CMP/190304/0002341 |
04/03/2019
|
25/06/2022
|
RATNAKAR SINGH |
SHRIVISION HOMES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for loss of money and harasment |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
512 |
CMP/220120/0008843 |
20/01/2022
|
25/06/2022
|
AVANI BAROT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Agreement to Provide Compensation as per Sale Deed Signed with Builder |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
513 |
CMP/210223/0007643 |
23/02/2021
|
25/06/2022
|
GUNA THANTRY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delay in handing over and expediting the handing over of the Flat |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
514 |
CMP/210209/0007566 |
09/02/2021
|
25/06/2022
|
SUNIL SURENDRA PAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation calculated from 31st DEC 2019 till the time of receiving complete OC, as per RERA provisions. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
515 |
CMP/220328/0009262 |
28/03/2022
|
25/06/2022
|
SANMATHI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
to grant compensation as stated above |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
516 |
CMP/220520/0009494 |
20/05/2022
|
25/06/2022
|
LALITHADEVI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Quick Completion and handover with Appropriate Compensation and Interest. RERA should monitor the project |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
517 |
CMP/220309/0009092 |
09/03/2022
|
25/06/2022
|
SUBIR KUMAR PAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund of payment with interest OR delivery of apartment with full compensation for delay |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
518 |
CMP/220318/0009153 |
18/03/2022
|
25/06/2022
|
MOHIT MAHNOT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
we need compensation for not giving possession till date and paying rent from 2 years of rs 45000 per month |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
519 |
CMP/201223/0007133 |
23/12/2020
|
25/06/2022
|
KANCHANA VASUDEVAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation from the Builder for the delay |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
520 |
CMP/220321/0009220 |
21/03/2022
|
25/06/2022
|
ASHWIN KUMAR YATHIRAJ |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation as per the current RERA rules and commitment to deliver within next 6 months. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
521 |
CMP/220526/0009536 |
26/05/2022
|
25/06/2022
|
NAINA SUHAS KAMAT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
PLEASE ENFORCE DELAY COMPENSATION AT 18% INETEST FROM JANUARY 2020 TILL DATE OF POSSESSION TO BE PAID BY RPPL TO WE BUYERS. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
522 |
CMP/220421/0009379 |
21/04/2022
|
25/06/2022
|
NARENDRA KUMAR RUSTOGI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Quick Completion and handover with Appropriate Compensation and Interest. RERA should monitor the project so that we can get our home |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
523 |
CMP/220121/0008849 |
21/01/2022
|
25/06/2022
|
NEERAJA SRINIVAS |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
REFUND with interest from the builder |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
524 |
CMP/220316/0009135 |
16/03/2022
|
25/06/2022
|
ABHISHEK BANTHIA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & House rent with 18% per anum interest till date.Monthly compensation with 18% rate & monthly rental for further delay.No RERA extension & new Tower register withot complainant consent |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
525 |
CMP/211028/0008494 |
28/10/2021
|
25/06/2022
|
KISHOREDUTH S BANAVAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Earliest delivery and possession of the flat and compensation thereof for the delay in delivery |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
526 |
CMP/220207/0008983 |
07/02/2022
|
25/06/2022
|
KAILASH KUMAR B JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Request RERA to support to inspect the progress of construction & push builder to commit for deliver due date of flat, no further extension of by RERA . Commitment of Compensation also needed. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
527 |
CMP/211012/0008434 |
12/10/2021
|
25/06/2022
|
MANOJ KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
compensation & fast delivery of the flat |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
528 |
CMP/220530/0009542 |
30/05/2022
|
25/06/2022
|
JITENDER RAKECHA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Return of invested amount and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
529 |
CMP/220625/0009684 |
25/06/2022
|
25/06/2022
|
CHANDRAKALA JAISWAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Handing over possession with delayed interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
530 |
CMP/220616/0009643 |
16/06/2022
|
25/06/2022
|
RITA MUNJANI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
COMPENSASTION & HOUSE RENT WITH 18% PER ANNUM INTERST TILL DATE MONTHLY COMPENSATION WITH 18% RATE & MONTHLY RENTAL FOR FURTHER DELAY NO RERA EXTENSON & NEW TOWER SHOULD NOT LAUNCHED |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
531 |
CMP/UR/210831/0008287 |
31/08/2021
|
25/06/2022
|
SHOBITH K |
KOLTE PATIL RAAGA PHASE 2 - K804 |
Bengaluru Urban |
Help me refund my money from them |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
532 |
CMP/UR/210817/0008251 |
17/08/2021
|
25/06/2022
|
MRS HASEEBA ATHER |
NAZIM PASHA & SYED ANSAR PASHA |
Bengaluru Urban |
Revoke the Registered J D A dated 19-05-2016, and prosecute of the respondents as per law, take necessary action against the Respondent under the RERA Act, Grant any other relief deems fit. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
533 |
CMP/220218/0009030 |
18/02/2022
|
25/06/2022
|
GAUTAM HONNAVAR |
BRIGADE TETRARCH PRIVATE LIMITED |
Bengaluru Urban |
Hello RERA, Kindly request you to please help in recovering the full refund of 3,72,958 immediately as this amount was my only savings and I am in urgent need of funds. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
534 |
CMP/UR/210329/0007849 |
29/03/2021
|
25/06/2022
|
LLOYD JOSEPH FERNANDEZ |
JAINS HOUSING & CONSTRUCTION LTD |
Bengaluru Urban |
Villa and Infrastructure handed over on completion with compensation for delay of neary 10 years |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
535 |
CMP/UR/210325/0007839 |
25/03/2021
|
25/06/2022
|
ROSARIO VICTOR ALMEIDA |
JAINS VILLA VIVIANAA |
Bengaluru Urban |
Refund of amount paid and compensation by way of interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
536 |
CMP/210927/0008388 |
27/09/2021
|
25/06/2022
|
RIMI TALAPATRA |
KOLTE PATIL DEVELOPERS LTD |
Bengaluru Urban |
Delay compensation for 18 months @ 12% p.a. of total payment made to the builder PLUS Rs. 50,000 for mental harassment . |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
537 |
CMP/220207/0008972 |
07/02/2022
|
25/06/2022
|
RAMESH PAREET |
KOLTE PATIL DEVELOPERS LTD |
Bengaluru Urban |
Compensation against delay of project Raaga by 54 months as RERA guidelines |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
538 |
CMP/220215/0009015 |
15/02/2022
|
25/06/2022
|
NEERAJA SRINIVAS |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
REFUND WITH INTEREST / COMPENSATE FOR DELAY |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
539 |
CMP/220321/0009219 |
21/03/2022
|
25/06/2022
|
RAJAT NAHATA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Quick Completion and handover , Compensation and Interest for collecting money through fast payment scheme |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
540 |
CMP/220120/0008844 |
20/01/2022
|
25/06/2022
|
SUJITH CHENGALATH |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delay and also quick delivery of the flat |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
541 |
CMP/220401/0009302 |
01/04/2022
|
25/06/2022
|
ANUKOOL JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Huge delay in Construction completion so reqire compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
542 |
CMP/220530/0009548 |
30/05/2022
|
25/06/2022
|
KAPIL KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
543 |
CMP/220604/0009588 |
04/06/2022
|
25/06/2022
|
SRINIVASAN SHANKAR RAO |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
1) need possession by Sep'22 with all amenities as per agreement 2) compensation for interest payment for the delay. 3) compensation for lost rental opportunity |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
544 |
CMP/220518/0009482 |
18/05/2022
|
25/06/2022
|
LAKSHMI PJ |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
545 |
CMP/220314/0009124 |
14/03/2022
|
25/06/2022
|
DEEPA MEHARWADE |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delay and hardship caused due to delay in completion of project |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
546 |
CMP/220426/0009381 |
26/04/2022
|
25/06/2022
|
SAURABH DESHPANDE |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation and rent with 18% interest per annum till date. No further rera extension without complainant's consent |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
547 |
CMP/220530/0009545 |
30/05/2022
|
25/06/2022
|
ASHWIN ANCHALIYA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation and house rent with 18% per annum interest till date. Monthly comp. With 18% rate and monthly rental for further delay.. no RERA extensions and new tower register without complainants con |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
548 |
CMP/220524/0009521 |
24/05/2022
|
25/06/2022
|
DEEPAK CHAUDHARY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund of amount with interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
549 |
CMP/220314/0009117 |
14/03/2022
|
25/06/2022
|
SUBHASHINI DEVI KUNKA RAMPRASAD |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation of Interest payment for the delay as per Guidelines. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
550 |
CMP/220525/0009531 |
25/05/2022
|
25/06/2022
|
PARIVAKKAM SUBRAMANIAM RAVICHANDRAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
To expedite the project completion and commit the compensation for the delayed period |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
551 |
CMP/UR/220408/0009325 |
08/04/2022
|
25/06/2022
|
SANMATHI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
To grant compensation for flat MC1603 booked by me as requested above. I calim Rs.40,000 per month from January 2020 till date of delivery. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
552 |
CMP/220531/0009551 |
31/05/2022
|
25/06/2022
|
N T SRINIVASAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Handover of flat and payment of compensation for delays |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
553 |
CMP/220516/0009470 |
16/05/2022
|
25/06/2022
|
VINAY KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly compensation with 18% rate & monthly rental for further delay. No RERA extensions & new tower to be registered till completion |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
554 |
CMP/220324/0009245 |
24/03/2022
|
25/06/2022
|
SOMA VIDYA SAGAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for furtherdelay. No RERA extensions & new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
555 |
CMP/200614/0006026 |
14/06/2020
|
25/06/2022
|
MONU KUMAR |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
PRM/KA/RERA/1250/304/PR/171014/001213 |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
556 |
CMP/200824/0003290 |
24/08/2020
|
25/06/2022
|
SIBIN SUNNY |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking amount RS. 266,628/- |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
557 |
CMP/220316/0009136 |
16/03/2022
|
25/06/2022
|
OM PRAKASH BANTHIA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & House rent with 18% per anum interest till date.Monthly compensation with 18% rate & monthly rental for further delay.No RERA extension & new Tower register without complainant consent |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
558 |
CMP/220317/0009149 |
17/03/2022
|
25/06/2022
|
SUKANTA DAS |
BRIGADE ENTERPRISES LTD |
Bengaluru Urban |
Action against this breach of agreement and compensation for the discrepancy. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
559 |
CMP/210730/0008178 |
30/07/2021
|
25/06/2022
|
SHYAM SUNDER TAPARIA |
KOLTE PATIL DEVELOPERS LTD |
Bengaluru Urban |
Consumer Rights and Builder not abiding by penalty clause of agreement to pay compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
560 |
CMP/210803/0008204 |
03/08/2021
|
25/06/2022
|
RAKESH KUMAR SINGH |
KOLTE PATIL DEVELOPERS LTD |
Bengaluru Urban |
Return of money paid towards booking amount and part payment of sale consideration along with compensation for mental agony and loss caused as a result of respondent's default. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
561 |
CMP/210403/0007859 |
03/04/2021
|
25/06/2022
|
GAURAV BANERJEE |
KOLTE PATIL DEVELOPERS LTD |
Bengaluru Urban |
Compensation and damages for delay, more details as mentioned in the Complaint Uploaded. The Reliefs Sough are briefly explained in the attachment titled "RERA Complaint- Gaurav Banerjee" |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
562 |
CMP/220614/0009625 |
14/06/2022
|
25/06/2022
|
BHARATH KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation and house rent with 18 % interest per annum till date. monthly compensation with 185 rate and monthly rental for furtherdelay. No RERA extension and New tower registration without complab |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
563 |
CMP/220122/0008855 |
22/01/2022
|
25/06/2022
|
RAHUL SAHU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
564 |
CMP/220613/0009615 |
13/06/2022
|
25/06/2022
|
VISHWANATH KOLHAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation and plus 18% interest on the amount paid by me till the date of possession of the flat. Reimbursement of the rent paid of actual rent paid by me for this period. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
565 |
CMP/220404/0009309 |
04/04/2022
|
25/06/2022
|
SANGEETH KUMAR PARVATAM |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
I want to exit the project owing to severe delays and mounting debt. I want full refund of my money with interest. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
566 |
CMP/211028/0008495 |
28/10/2021
|
25/06/2022
|
VENKATESH SAKA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation Amount for the delay and Exact handover date of our flat. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
567 |
CMP/220321/0009176 |
21/03/2022
|
25/06/2022
|
RAGHAVENDRA KAPU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
FAIR COMPENSATION FOR DELAY AND EARLY HANDOVER OF FLAT.DEVELOPER IS OBTAINING REPEATED RERA EXTENTIONS AND CHEATING BUYERS |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
568 |
CMP/220401/0009303 |
01/04/2022
|
25/06/2022
|
DEEPAK MAHESHWARI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation shall be paid on the amount paid & nominal rent with 18% per anum till date. Also this shall be paid beyond 30th Dec on the said amount monthly to me as I am paying EMI. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
569 |
CMP/220520/0009501 |
20/05/2022
|
25/06/2022
|
NITESH JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
570 |
CMP/210206/0007583 |
06/02/2021
|
25/06/2022
|
KARTHIK SHETTY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Handover of flat by June'21, No compromise in quality & amenities, compensation for the delay as per RERA |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
571 |
CMP/201009/0006794 |
09/10/2020
|
25/06/2022
|
MANOHAR MN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
1. Mandate the builder to deliver by Dec 2020. 2. Not to divert the funds of Maple project to other projects. 3. Since 90% of apartment cost has been paid to builder, the builder should compensate |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
572 |
CMP/220321/0009193 |
21/03/2022
|
25/06/2022
|
DEEPAK KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
573 |
CMP/220321/0009172 |
21/03/2022
|
25/06/2022
|
DR SHYLESH KUMAR B S |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
I REQUEST YOUR GOOD OFFICE TO DIRECT DEVELOPER TO EARLY HANDOVER OF POSESSION OF DULY COMPLETED FLAT IN MY NAME AND PAY INTEREST OF 18% PA FROM THE DATE OF PROMISE TO TILL THE DATE OF ACTUAL HANDOVER |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
574 |
CMP/220601/0009566 |
01/06/2022
|
25/06/2022
|
UMA WARRIER |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
1. Compensation/Settlement for the inordinate delay and RERA to ensure no more delay. In the event of further delays, penalty should be increased in terms of compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
575 |
CMP/201130/0007140 |
30/11/2020
|
25/06/2022
|
ANU ASHOK |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delay , as their agreement was one sided, they have said that they would charge us Interest @18 % if there would be a delay in making payments , this should apply to them also. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
576 |
CMP/220316/0009131 |
16/03/2022
|
25/06/2022
|
SUBBA RAO SUMANAM |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
FAIR COMPENSATION FOR DELAY AND EARLY HANDOVER OF FLAT.DEVELOPER IS OBTAINING REPEATED RERA EXTENTIONS AND CHEATING BUYERS |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
577 |
CMP/220318/0009152 |
18/03/2022
|
25/06/2022
|
SURESH CHANDRA MAHNOT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
we need compensation for not giving possession till date and paying rent from 2 years of rs 40000 per month |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
578 |
CMP/210102/0007370 |
02/01/2021
|
25/06/2022
|
MANJULA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delay of delivery date of the project as the initial delivery date as per the agreement is 31 Dec 2019. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
579 |
CMP/220430/0009397 |
30/04/2022
|
25/06/2022
|
K SUBASH RAO |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
REFUND WITH INTEREST/COMPENSATE FOR DELAY |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
580 |
CMP/220318/0009151 |
18/03/2022
|
25/06/2022
|
VIKAS MAHNOT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
we need compensation for not giving possession till date and paying rent from 2 years of rs 25000 per month |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
581 |
CMP/201010/0006812 |
10/10/2020
|
25/06/2022
|
SREENIVASULU GANDHAVALLA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
1. Mandate the builder to deliver by Dec 2020. 2. Not to divert the funds ofMaple project to other projects. 3. Since 90% of apartment cost has been paidto builder, the builder should compensate |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
582 |
CMP/220416/0009363 |
16/04/2022
|
25/06/2022
|
SUMIT KUMAR JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly Comp. with 18% rate & monthly rental for further delay. No RERA Extension & new tower register without complainants consent. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
583 |
CMP/210104/0007389 |
04/01/2021
|
25/06/2022
|
PRAVEEN KUMAR PENUMATSA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
We request compensation due to delayed handover and also exert pressure in finishing the works at earliest possible as they had committed a new date June 2021 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
584 |
CMP/210417/0007905 |
17/04/2021
|
25/06/2022
|
REKHA D JAIN |
EXD PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking advance, Direct the builder to pay the entire bank loan amount received from yes Bank along with all the interest, penalty, charges or whatsoever of the allottee/complainant. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
585 |
CMP/210417/0007904 |
17/04/2021
|
25/06/2022
|
PRAVEEN JAIN |
EXD PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking advance, Direct the builder to pay the entire bank loan amount received from yes Bank along with all the interest, penalty, charges or whatsoever of the allottee/complainant. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
586 |
CMP/210403/0007861 |
03/04/2021
|
25/06/2022
|
ALPESH KUMAR V JAIN |
EXD PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking advance, Direct the builder to pay the entire loan amount received form Yes Bank along with all the interest, penalty, Charges or whatsoever of the allottee/ complainant completely |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
587 |
CMP/180806/0001117 |
06/08/2018
|
25/06/2022
|
BHASKAR REDDY |
AASHRITHA PROPERTIES |
Bengaluru Urban |
Compensation as prayed |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
588 |
CMP/191217/0004722 |
17/12/2019
|
25/06/2022
|
SAKET SOURABH |
BOLLINENI DEVELOPERS LTD |
Bengaluru Urban |
date of registration: 25/09/2019 which means 1.25 years of delay considering into account the grace period. Have asked the builder for the compensation for delay but it has been refused. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
589 |
CMP/201130/0007159 |
30/11/2020
|
25/06/2022
|
POORNA TEJA |
BRIGADE ENTERPRISES LTD |
Bengaluru Urban |
I request RERA to advise Brigade team to honor the delay compensation payable for my apartment. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
590 |
CMP/201130/0007166 |
30/11/2020
|
25/06/2022
|
MR PRASHANTH |
ANTEVORTA DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund with compensations |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
591 |
CMP/210322/0007821 |
22/03/2021
|
25/06/2022
|
MANISH BHADAURIA |
GEOWN CASPER PROPERTIES PVT LTD |
Bengaluru Urban |
1. Cancellation and refund of all payments with 24% interest payment as company has no plan to complete it on time. 2. Losses incurred due to delay in handover. 3. Forensic Audit of GeownOasis Phase-1 |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
592 |
CMP/210403/0007862 |
03/04/2021
|
25/06/2022
|
DEEPIKA LALWANI |
EXD PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking advance, Direct the builder to pay the entire bank loan amount received from yes Bank along with all the interest, penalty, charges or whatsoever of the allottee/complainant, compe |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
593 |
CMP/210417/0007900 |
17/04/2021
|
25/06/2022
|
DHANESHKUMAR V JAIN |
EXD PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking advance, Direct the builder to pay the entire bank loan amount received from yes Bank along with all the interest, penalty, charges or whatsoever of the allottee/complainant, compens |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
594 |
CMP/210417/0007901 |
17/04/2021
|
25/06/2022
|
DIVYA A JAIN |
EXD PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking advance, Direct the builder to pay the entire loan amount received form Yes Bank along with all the interest, penalty, Charges or whatsoever of the allottee/ complainant completely |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
595 |
CMP/210417/0007903 |
17/04/2021
|
25/06/2022
|
PRAMILA JAIN |
EXD PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking advance, Direct the builder to pay the entire bank loan amount received from yes Bank along with all the interest, penalty, charges or whatsoever of the allottee/complainant, compe |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
596 |
CMP/210417/0007906 |
17/04/2021
|
25/06/2022
|
SANDEEP LALWANI |
EXD PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking advance, Direct the builder to pay the entire bank loan amount received from yes Bank along with all the interest, penalty, charges or whatsoever of the allottee/complainant, compe |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
597 |
CMP/220316/0009127 |
16/03/2022
|
25/06/2022
|
MARY PRASAD |
HERIITAGE INFRASTRUCTURES |
Bengaluru Urban |
Compensation of 18% for 9 months delay till date.Total payment made Rs 12459670/-.Total compensation for 9months Rs 1682055/- |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
598 |
CMP/220401/0009301 |
01/04/2022
|
25/06/2022
|
PREETY |
BRIGADE ENTERPRISES LTD |
Bengaluru Urban |
Return the amount of Rs.6,58,018/- together with interest at the rate prescribed in the Rules, from the date of receipt of the said amount till realisation and compensation for mental agony hardship. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
599 |
CMP/220510/0009449 |
10/05/2022
|
25/06/2022
|
DR M GEETHA |
GODREJ PROPERTIES LIMITED |
Bengaluru Urban |
Refund of amount paid and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
600 |
CMP/220520/0009492 |
20/05/2022
|
25/06/2022
|
DESAI VENKATA SREE HARSHA |
BRIGADE ENTERPRISES LTD |
Bengaluru Urban |
please take my complaint and help me in getting my booking amount back. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
601 |
CMP/220524/0009514 |
24/05/2022
|
25/06/2022
|
G GAYATHRI |
BCV DEVELOPERS PVT LTD |
Bengaluru Urban |
1. Compensation for Delayed possession for apartment (till date project construction is ongoing) - as per agreement, i am entitled to compensation (2% + Base Rate). This is Approximately INR 25 lakhs. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
602 |
CMP/220601/0009562 |
01/06/2022
|
25/06/2022
|
NALINI D C |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
1. Possession of Unit immediately. 2. Compensation for the delay in handing over and Mental agony . |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
603 |
CMP/220607/0009599 |
07/06/2022
|
25/06/2022
|
KARTHIK VENKATRAMAN |
SLV CONCRETES |
Bengaluru Urban |
I would like to request your Hon’ble authority (RERA) to intervene in this issue and help me by cancellation of the flat booked and getting a full refund on the entire amount paid. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
604 |
CMP/220614/0009626 |
14/06/2022
|
25/06/2022
|
ANITHA G S |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delay and if further delay then refund with interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
605 |
CMP/210412/0007884 |
12/04/2021
|
25/06/2022
|
G CHETAN JAIN |
EXD PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking advance, Direct the builder to pay the entire loan amount received form Yes Bank along with all the interest, penalty, Charges or whatsoever of the allottee/ complainant completely |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
606 |
CMP/220615/0009639 |
15/06/2022
|
25/06/2022
|
CHETHANA BV |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Full refund and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
607 |
CMP/220621/0009650 |
21/06/2022
|
25/06/2022
|
HITESH PALRECHA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation on Interest amount and Penalties as per the norms |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
608 |
CMP/220624/0009678 |
24/06/2022
|
25/06/2022
|
DEEPAK SALUNKHE |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation and house rent with 18% per annum interest till date. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
609 |
CMP/210424/0007923 |
24/04/2021
|
25/06/2022
|
VIMALA DEVI |
EXD PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking advance, Direct the builder to pay the entire loan amount received form Yes Bank along with all the interest, penalty, Charges or whatsoever of the allottee/ complainant completely |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
610 |
CMP/210417/0007902 |
17/04/2021
|
25/06/2022
|
JAYESH M JAIN |
EXD PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking advance, Direct the builder to pay the entire loan amount received form Yes Bank along with all the interest, penalty, Charges or whatsoever of the allottee/ complainant completely |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
611 |
CMP/UR/200228/0005555 |
28/02/2020
|
25/06/2022
|
K.V.IYER |
PARANJAPE |
Bengaluru Urban |
interest on Rs 9238271 @ 12 % for 2years as per agreement , any legal charges, compensation for mental agony rs 200000.00 , waiver of interest, penalty etc for balance payment as builder refused inte |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
612 |
CMP/220603/0009581 |
03/06/2022
|
25/06/2022
|
SNEHA SURESH KULKARNI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation from the builder for the delayed project and request RERA to stop giving the builder extensions. Request RERA to pressurise builder to handover the flat as soon as possible |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
613 |
CMP/220613/0009621 |
13/06/2022
|
25/06/2022
|
PRAKASH RAMANATHAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation and house rental seeked with 18% interest per annum till date. Monthly compensation with 18% interest and monthly rental for further delay. No further RERA extensions and no new towers |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
614 |
CMP/220329/0009275 |
29/03/2022
|
25/06/2022
|
IYYAPPA M P |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
rera should interfere and help in completion of the project at the earliest and get us the required compensation. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
615 |
CMP/220121/0008848 |
21/01/2022
|
25/06/2022
|
SANTHOSHA KUMAR BHANDARY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delay and pocession of flat |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
616 |
CMP/210111/0007415 |
11/01/2021
|
25/06/2022
|
KIRAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
we need compensation & interest on delay of flat for 1.5 years. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
617 |
CMP/210318/0007795 |
18/03/2021
|
25/06/2022
|
MANISH KUMAR MISHRA |
MYSORE PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
I would REARA autority to inspect the agreement and kindly let Builder know that unless they complete the milestone for flat specific they can not put any late payment fees. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
618 |
CMP/210212/0007498 |
12/02/2021
|
25/06/2022
|
RAMESH |
BRIGADE ENTERPRISES LTD |
Bengaluru Urban |
Immediate Recovery of delay compensation, rental loss & property tax amount with Interest for 6 years of delay caused by builder |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
619 |
CMP/200513/0005880 |
13/05/2020
|
25/06/2022
|
SESETTY SURESH |
BRIGADE ENTERPRISES LTD |
Bengaluru Urban |
E1434 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
620 |
CMP/220411/0009340 |
11/04/2022
|
25/06/2022
|
ASHA ANANTHA PRASAD |
BRIGADE ENTERPRISES LTD |
Bengaluru Urban |
Compensation under Sec. 18 for delay in completion of the Project |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
621 |
CMP/220602/0009574 |
02/06/2022
|
25/06/2022
|
MAHAVEER MOHANLAL JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delay in possession |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
622 |
CMP/220330/0009293 |
30/03/2022
|
25/06/2022
|
VISHAL |
GEOWN CASPER PROPERTIES PVT LTD |
Bengaluru Urban |
Compensation for the delay and help in getting snags/issues rectified . |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
623 |
CMP/210322/0007808 |
22/03/2021
|
25/06/2022
|
HARSHIT BABBAR |
MAARS INFRA DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
To get Amount refunded |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
624 |
CMP/220603/0009578 |
03/06/2022
|
25/06/2022
|
NIRMALA BHANDARI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Please help me with good compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
625 |
CMP/220520/0009500 |
20/05/2022
|
25/06/2022
|
HIMANSHU PURI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation of my entire interest on home loan paid from December, 2019 along with rent. Refund of extra amount taken considering preferential location charges. Timely delivery of the project. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
626 |
CMP/UR/220321/0009211 |
21/03/2022
|
25/06/2022
|
PURAVANKARA LIMITED |
Yashvanth Kumar H R |
Bengaluru Urban |
Cancelation and termination of Agreement for sale executed on 27.01.2021 for Apt. bearing no. B4-4A-103 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
627 |
CMP/UR/220321/0009182 |
21/03/2022
|
25/06/2022
|
PURAVANKARA LIMITED |
Chikkala Satyanarayanan |
Bengaluru Urban |
To cancel the Agreement for Sale executed on 10-3-21 and registered as document no. JPN-1-03346-2018-19 in CD No. JPND520 to the unit no. B1-1D-704 and issue direction to concerned sub Registrar accor |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
628 |
CMP/190405/0002570 |
05/04/2019
|
25/06/2022
|
KARAN BABARIA |
SOBHA LIMITED |
Bengaluru Urban |
Please help us get our money back from SOBHA |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
629 |
CMP/201224/0007316 |
24/12/2020
|
25/06/2022
|
ADARSH BARADI REDDY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delay in completion and delivery of the apartment |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
630 |
CMP/UR/211011/0008428 |
11/10/2021
|
25/06/2022
|
SRIRAM VENKATARAMAN |
JAIN HOUSING & CONSTRUCTIONS LTD. |
Bengaluru Urban |
the respondent must return the money with interest or meet the commitments of building, and making the project livable as per contract. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
631 |
CMP/220602/0009575 |
02/06/2022
|
25/06/2022
|
GEETHA N CHHABRIA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
REQUIRE A WRITTEN COMMITMENT REGARDING DELIVERY OF APPARTMENT AND APPROPRIATE COMPENSATION FOR DELAY IN HANDING OVER POSSESSION |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
632 |
CMP/220623/0009669 |
23/06/2022
|
25/06/2022
|
VIJAYKUMAR A PATIL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Refund and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
633 |
CMP/220613/0009620 |
13/06/2022
|
25/06/2022
|
MUKESH KUMAR SOLANKI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delayed apartment delivery and earliest handover of the apartment. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
634 |
CMP/220623/0009667 |
23/06/2022
|
25/06/2022
|
MANISH KUMAR JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Quick Completion and handover with Appropriate Compensation and Interest. RERA should monitor the project |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
635 |
CMP/210302/0007717 |
02/03/2021
|
25/06/2022
|
ASHOK SALECHA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
YES |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
636 |
CMP/220610/0009610 |
10/06/2022
|
25/06/2022
|
H D MADAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Exit with full and final settlement with interest of 12 % Pa from first payment made till now |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
637 |
CMP/220601/0009558 |
01/06/2022
|
25/06/2022
|
STEPHEN.D |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Quick Completion and handover with Appropriate Compensation and Interest. RERA should monitor the Project |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
638 |
CMP/220624/0009673 |
24/06/2022
|
25/06/2022
|
M S BHARATHI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Direction to be given to the Promoter to complete project in all aspect and to pay the delayed interest as per section 18 of RERA Act, 2016 |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
639 |
CMP/220601/0009561 |
01/06/2022
|
25/06/2022
|
DEEPAK JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
EXTENTION TO BUILDER BUT DELAYED MORE THEN THAT |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
640 |
CMP/220624/0009674 |
24/06/2022
|
25/06/2022
|
DR S SUBRAMANYAM |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Direction to be given to the Promoter to complete project in all aspect and to pay the delayed interest as per section 18 of RERA Act, 2016 |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
641 |
CMP/UR/220520/0009486 |
20/05/2022
|
25/06/2022
|
USHA ASHOK |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
The statutory period of handing over the property is over and delyed in giving the possession of the property to the allotte and seeking for compensation for the delay and violation of the agreement |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
642 |
CMP/220623/0009668 |
23/06/2022
|
25/06/2022
|
KISHORE KUMAR JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Quick Completion and handover with Appropriate Compensation and Interest. RERA should monitor the project |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
643 |
CMP/201224/0007318 |
24/12/2020
|
25/06/2022
|
HARIPRIYA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Builder has to give rebate on the last installment amount to buyers at the time of registration. Allow buyers to do interior works immediately after Regn w/o waiting for OC. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
644 |
CMP/220624/0009682 |
24/06/2022
|
25/06/2022
|
MANOJ JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
GIVE COMPENSATION |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
645 |
CMP/220608/0009603 |
08/06/2022
|
25/06/2022
|
NAVEEN KUMAR DODEJA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Requesting RERA intervention to seek compensation for the project delay and receive a firm delivery date |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
646 |
CMP/210801/0008193 |
01/08/2021
|
25/06/2022
|
MEHUL SATISH SHAH |
SOBHA LIMITED |
Bengaluru Urban |
Compensation(Delay in Installment Payment): I request RERA helps us against the atrocity of Sobha and instruct them to issue remaining installment Payment at the completion of project and not now |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
647 |
CMP/220321/0009170 |
21/03/2022
|
25/06/2022
|
GAGARIN DAS |
B.M.DEVELOPERS |
Bengaluru Urban |
Expecting with project completion as per the Broucher and delay compensation. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
648 |
CMP/220505/0009426 |
05/05/2022
|
25/06/2022
|
AADITYA RAMESH NANDESHWAR |
SOBHA LIMITED |
Bengaluru Urban |
Need my refund of 1,50,000/- rupees. after deducting cancellation charges of 50,000/- from total booking amount of 2,00,000/- |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
649 |
CMP/191121/0004781 |
21/11/2019
|
25/06/2022
|
DURGA PRASAD KHUNTIA |
SOBHA LIMITED |
Bengaluru Urban |
Refund of my total booking amount Rs. 3,50,000 for the cancelled flat |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
650 |
CMP/200130/0003380 |
30/01/2020
|
25/06/2022
|
HEMANT JINAGAL |
SOBHA LIMITED |
Bengaluru Urban |
I am seeking help from RERA to get refund of my 4 lac amount deposited during booking. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
651 |
CMP/220512/0009454 |
12/05/2022
|
25/06/2022
|
SEEMA VASANT SALUNKHE |
SOBHA LIMITED |
Bengaluru Urban |
Help us with the refund of our token advance |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
652 |
CMP/220309/0009100 |
09/03/2022
|
25/06/2022
|
ANAND |
SPL TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Refund and compensation |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
653 |
CMP/UR/220321/0009186 |
21/03/2022
|
25/06/2022
|
PURAVANKARA LIMITED |
C.H Srinivas |
Bengaluru Urban |
To cancel the Agreement for Sale executed on 21-7-18 and registered as document no. JPN-1-02641-2018-19 in CD No. JPND519for the Unit no. B5-5A-1305 and issue direction to concerned sub registrar acco |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
654 |
CMP/210516/0007951 |
16/05/2021
|
25/06/2022
|
RANJITH SUBRAMANIAM |
PURAVANKARA LIMITED |
Bengaluru Urban |
1. Return of the initial booking amount paid by me, 2. Compensation for the inconvenience Caused by Promoter as per RERA guidelines (if any) 3. Penalty on Promoter for not adhering to RERA guidelines |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
655 |
CMP/220523/0009506 |
23/05/2022
|
25/06/2022
|
SUDHEENDRA SINGH S |
SOBHA LIMITED |
Bengaluru Urban |
Please help me get the refund |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
656 |
CMP/201017/0006867 |
17/10/2020
|
25/06/2022
|
NIRAJ NAWANIT |
MANTRI CASTLES PVT LTD |
Bengaluru Urban |
delay compensation as per RERA Provisions |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
657 |
CMP/220504/0009419 |
04/05/2022
|
25/06/2022
|
CHINMOY MUKHERJEE |
SKH ESTATES AND DEVELOPERS LLP |
Bengaluru Urban |
Refund of booking amount within 1 month, else 2% monthly interest should be charged on CIticore properties till they refund my booking amount. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
658 |
CMP/200930/0006699 |
30/09/2020
|
25/06/2022
|
SHUBHASHIS SENGUPTA |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Delivering flat/interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
659 |
CMP/200930/0006719 |
30/09/2020
|
25/06/2022
|
MANIGANDAN P G |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Delivering flat/Interest/Rent/Pre-EMI Dues |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
660 |
CMP/200930/0006700 |
30/09/2020
|
25/06/2022
|
AKSHAY T S |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Delivering flat/interest/rent |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
661 |
CMP/200930/0006712 |
30/09/2020
|
25/06/2022
|
RAKESH A SHETTY |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Delivering flat/interest/rent |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
662 |
CMP/201205/0006713 |
05/12/2020
|
25/06/2022
|
VIRAJ SHETTY |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Delivering flat / interest / rent |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
663 |
CMP/200930/0006705 |
30/09/2020
|
25/06/2022
|
SANTOSH SRINIVASAN |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Delivery of Flat & Interest/compensation for delay |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
664 |
CMP/200930/0006725 |
30/09/2020
|
25/06/2022
|
VIJAYALAXMI HIREMATH |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Saleconsideration/deliveryofflat/costofproceedings |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
665 |
CMP/201001/0006741 |
01/10/2020
|
25/06/2022
|
SRAJAN TIWARI |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Delay in Delivery of Flat/ Rental Compensation/ 10% interest on Total Sale consideration paid to the respondant |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
666 |
CMP/200930/0006735 |
30/09/2020
|
25/06/2022
|
ANJALI SHARAN AND RITESH RAUSHAN |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
As per "Interim Prayer" in "Facts of Complaint" |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
667 |
CMP/201001/0006740 |
01/10/2020
|
25/06/2022
|
CHIRENJEET JAGANNATH |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Flat Delivery / Interest Compensation |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
668 |
CMP/200930/0006737 |
30/09/2020
|
25/06/2022
|
MAINAK GHOSH |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
DELIVERY OF FLAT AND PAYMENTS OF EMIS DEFALTED WITH FULL COMPENSATION DUE TO LOSS OF INTEREST AND RENTS |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
669 |
CMP/200930/0006728 |
30/09/2020
|
25/06/2022
|
ANUPAMA RAMESH |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Delay in delivery; Rental compensation for delay; 10% interest per annum on total sale consideration paid to the Respondent |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
670 |
CMP/200930/0006734 |
30/09/2020
|
25/06/2022
|
SATISH SANKARAN |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Non delivery of flat/rental compensation/ interest of 10 percent on total sale consideration. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
671 |
CMP/UR/200930/0006739 |
30/09/2020
|
25/06/2022
|
NABARUN D PURKAYASTHA AND MEGHNA D PURKAYASTHA |
M.K.K DURANI AND MRS. AYESHA SULTANA |
Bengaluru Urban |
Delivering flat/interest/rent |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
672 |
CMP/200930/0006714 |
30/09/2020
|
25/06/2022
|
MONISH GANDHI |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Delivering flat/interest/rent |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
673 |
CMP/201001/0006716 |
01/10/2020
|
25/06/2022
|
T JANAKIRAM |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Delivering Flat/Interest/Rent |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
674 |
CMP/200930/0006732 |
30/09/2020
|
25/06/2022
|
POORNIMA MURTHY |
ND DEVELOERS PVT LTD |
Bengaluru Urban |
Delivering flat/interest/rent |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH5
|
|
|
675 |
CMP/220416/0009358 |
16/04/2022
|
25/06/2022
|
N DURGARAO |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation @18% per annum from December 2019 to actual possession date. If the delay beyond September 2022, refund with 18% interest from the date of payment to actual refund date. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
676 |
CMP/211012/0008433 |
12/10/2021
|
25/06/2022
|
RASHMI SRINIVASAIAH |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delay with delivery of all promised facilities or Refund of the entire amount with prevailing interest rate |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
677 |
CMP/220416/0009361 |
16/04/2022
|
25/06/2022
|
CHANDAN KUMAR |
REDDY ESTATES PRIVATE LIMITED |
Bengaluru Urban |
Refund of full amount fifty thousand rupees |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
678 |
CMP/220603/0009579 |
03/06/2022
|
25/06/2022
|
JITESH SEDANI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Delay compensation from the date of actual promised delivery. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
679 |
CMP/220407/0009324 |
07/04/2022
|
25/06/2022
|
AKSHATA |
SKYREACH BUILDERS PRIVATE LIMITED |
Ramanagara |
Booking amount of Rs. 50000 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
680 |
CMP/220517/0009476 |
17/05/2022
|
25/06/2022
|
AJAY AGARWAL |
COLUMBIA PACIFIC COMMUNITIES PRIVATE LIMITED |
Bengaluru Urban |
to set aside this payment demand till works are completed |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
681 |
CMP/220510/0009445 |
10/05/2022
|
25/06/2022
|
JAYAKUMAR KAMALANATHAN |
GODREJ PROPERTIES LIMITED |
Bengaluru Urban |
Refund of money paid with interst |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
682 |
CMP/UR/220321/0009160 |
21/03/2022
|
25/06/2022
|
PURAVANKARA LIMITED |
Bantesh Raman Bahadur Singh |
Bengaluru Urban |
Cancellation and termination of agreement executed on 27-11-20 for unit no. B2-2B-1001 |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
683 |
CMP/220322/0009233 |
22/03/2022
|
25/06/2022
|
ARUN JAYANNA |
PROVIDENT EQUINOX 2 |
Bengaluru Urban |
Request you to help me in getting the refund of my money |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
684 |
CMP/211109/0008529 |
09/11/2021
|
25/06/2022
|
PANKAJ MEHTA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
compensation for delayed period and delivery at the earliest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
685 |
CMP/220624/0009683 |
24/06/2022
|
25/06/2022
|
KUSHAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
COMPENSATION & HOUSE RENT WITH 18% PER ANNUM INTEREST TILL DATE.MONTHLY COMP WITH 18% RATE & MONTHLY RENTAL FOR FURTHER DELAY.NO RERA EXTENTIONS & NEW TOWER REGISTER WITHOUT COMPLAINANTS CONSENT. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
686 |
CMP/220625/0009692 |
25/06/2022
|
25/06/2022
|
PANKAJ KUMAR MEHTA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Handing over possession with delayed interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
687 |
CMP/220314/0009119 |
14/03/2022
|
25/06/2022
|
PANKAJ MEHTA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fit |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
688 |
CMP/220322/0009235 |
22/03/2022
|
25/06/2022
|
NARAYANA RAJU SESHAPPA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
please help in getting Compensation for delay in handing over i.e., interest + rent lost due to delay. Please help me in getting the possession of the Flat by Apr2022/May2022. |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
689 |
CMP/220616/0009644 |
16/06/2022
|
25/06/2022
|
M JAYARAM SHETTY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Direct the developer to hand over the apartment at the earliest and compensate me for the delay caused, recover interest from the promoter at the prescribed rate. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
690 |
CMP/220625/0009686 |
25/06/2022
|
25/06/2022
|
CHAITRA K R |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delay in delivery of apartmentm MA 1202 |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
691 |
CMP/210109/0007424 |
09/01/2021
|
25/06/2022
|
ARJUN SHETTY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for Delay or Refund with Interest |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH6
|
|
|
692 |
CMP/220625/0009685 |
25/06/2022
|
25/06/2022
|
H C MALLESHA SWAMY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly comp, with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complaints consent. |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
693 |
CMP/220625/0009687 |
25/06/2022
|
25/06/2022
|
ABDUL BARI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Handing over possession with delayed interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
694 |
CMP/220624/0009676 |
24/06/2022
|
25/06/2022
|
GANESH GUPTA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Handing over possession with delayed interest |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
695 |
CMP/180303/0000534 |
03/03/2018
|
12/03/2022
|
Rajeev kumar aggarval |
Occannus Dwellings pvt.ltd.., |
Bengaluru Urban |
Refund with 16% interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
696 |
CMP/180227/0000516 |
27/02/2018
|
12/03/2022
|
Ashley Selwine |
Nitesh Melbourne Park |
Bengaluru Urban |
Builder to repay entire booking amount wt interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
697 |
CMP/171113/0000215 |
13/11/2017
|
12/03/2022
|
Umesh Kumar Tripathi |
Nitesh Long Island |
Bengaluru Urban |
Payment after completion, stop plot release |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
698 |
CMP/180707/0001014 |
07/07/2018
|
12/03/2022
|
Vijayakumar |
Nitesh Melbourne Park |
Bengaluru Urban |
Refund of Rs 4,00,000/- with interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
699 |
CMP/180605/0000896 |
05/06/2018
|
12/03/2022
|
RAJKUMAR SAMPATH |
Nitesh Melbourne Park |
Bengaluru Urban |
Refund of booking amount, interest & compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
700 |
CMP/180710/0001026 |
10/07/2018
|
12/03/2022
|
AKHILESH PATHODIA |
Nitesh Melbourne Park |
Bengaluru Urban |
To get the refund of booking amount with interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
701 |
CMP/180809/0001124 |
09/08/2018
|
12/03/2022
|
Kiran Shivappa Japannavar |
Nitesh Melbourne Park |
Bengaluru Urban |
Request your help in getting the amount refunded |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
702 |
CMP/180721/0001061 |
21/07/2018
|
12/03/2022
|
Ajay Shankar |
Nitesh Melbourne Park |
Bengaluru Urban |
Refund the advance amount of INR.27,47,338/- |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
703 |
CMP/180829/0001195 |
29/08/2018
|
12/03/2022
|
D V PHANI KUMAR |
Nitesh Melbourne Park |
Bengaluru Urban |
YES |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
704 |
CMP/180820/0001160 |
20/08/2018
|
12/03/2022
|
Lakshmi Narayana Konduri |
Nitesh Melbourne Park |
Bengaluru Urban |
Refund booking amount, interest and compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
705 |
CMP/180901/0001208 |
01/09/2018
|
12/03/2022
|
SUMATHI M |
Commune |
Bengaluru Urban |
4388760 |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
706 |
CMP/181007/0001396 |
07/10/2018
|
12/03/2022
|
Praveen Purohit |
ROSHAN GARDENIA APARTMENT |
Bengaluru Urban |
Refund of money from the builder. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
707 |
CMP/181028/0001556 |
28/10/2018
|
12/03/2022
|
PAPPU KUMAR |
MULBERRY MIST |
Bengaluru Urban |
Delay Compensation & Immediate Handover/Closure |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
708 |
CMP/181007/0001381 |
07/10/2018
|
12/03/2022
|
Ramesh Nayak B |
ROSHAN GARDENIA APARTMENT |
Bengaluru Urban |
Refund of Amount |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
709 |
CMP/180227/0000522 |
27/02/2018
|
12/03/2022
|
KEC Raja Kumar and K Vijaya Raju, |
Nitesh Napa Valley, |
Bengaluru Urban |
Reimbursement of Dues & Possession of the Villa |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
710 |
CMP/180227/0000519 |
27/02/2018
|
12/03/2022
|
KEC Raja Kumar and K Vijaya Raju, |
Nitesh Napa Valley, |
Bengaluru Urban |
Reimbursement of Dues & Possession of the Villa |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
711 |
CMP/181203/0001711 |
03/12/2018
|
12/03/2022
|
RAJIV KUMAR AGGARWAL |
OCEANUS TRANQUIL |
Bengaluru Urban |
Immediate refund as mentioned above |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
712 |
CMP/190314/0002393 |
14/03/2019
|
12/03/2022
|
REENA PANGULUR |
SHRIRAM SUMMITT |
Bengaluru Urban |
Payment of Interest, Compensation, OC at registrat |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
713 |
CMP/181103/0001606 |
03/11/2018
|
12/03/2022
|
SHRISHTY SHETTY |
GODREJ AIR |
Bengaluru Urban |
Withdrawal of Payment Demand for 16 floor |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
714 |
CMP/190120/0001927 |
20/01/2019
|
12/03/2022
|
H S SRIDHARA MURTHY |
ROSHAN GARDENIA APARTMENT |
Bengaluru Urban |
Refund of amount with interest at 18% |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
715 |
CMP/190506/0002921 |
06/05/2019
|
12/03/2022
|
CHARU CHAWLA |
NITESH CAPE COD PHASE I |
Bengaluru Urban |
Refund of the booking amount with interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
716 |
CMP/190820/0003892 |
20/08/2019
|
12/03/2022
|
SUBRAMANIAN C |
SHRIRAM SUMMITT |
Bengaluru Urban |
Payment of Delay Compensation as per RERA norms |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
717 |
CMP/180728/0001087 |
28/07/2018
|
12/03/2022
|
R SANTHOSH KUMAR |
NITESH CHELSEA |
Bengaluru Urban |
Refund of booking amount from NiteshEstatesLimited |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
718 |
CMP/191017/0004498 |
17/10/2019
|
12/03/2022
|
NINGAPPA M HUNCHYALI |
NITESH MELBOURNE PARK |
Bengaluru Urban |
Rs. 21.06 lakh refund with Interest + compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
719 |
CMP/191104/0004622 |
04/11/2019
|
12/03/2022
|
ABHIJIT A NARGUND |
PRESTIGE JINDAL CITY-PHASE II |
Bengaluru Urban |
Refund of entire cancellation amount with interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
720 |
CMP/191112/0004699 |
12/11/2019
|
12/03/2022
|
SANKAR AZHAKESAN |
PASHMINA WATERFRONT -PHASE-I |
Bengaluru Urban |
Need my money back with interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
721 |
CMP/181202/0001705 |
02/12/2018
|
12/03/2022
|
AMIT PAL & SOUTRIMA PAL |
SHRIRAM GREEN FIELD PHASE 1 |
Bengaluru Urban |
1. Monthly delay compensation for bank interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
722 |
CMP/200823/0006406 |
23/08/2020
|
12/03/2022
|
PRIYANKA SHARMA |
SOBHA LIMITED |
Bengaluru Urban |
Refund of blocking amount of rupess one lakhs alongwith the interest on the amout due to delay in refund. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
723 |
CMP/191225/0005042 |
25/12/2019
|
12/03/2022
|
ARVIND GAUR |
MIRABILIS (LAND OWNER SHARE) |
Bengaluru Urban |
Delay compensation- Mirabilis project |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
724 |
CMP/191221/0004974 |
21/12/2019
|
12/03/2022
|
ANJANEYULU GOURISHETTY |
SOBHA LIMITED |
Bengaluru Urban |
I request RERA officials to help me in getting the flat booking amount refund along with compensation towards financials loss and trauma I have gone through during last one year i.e. Rs.10 lakhs |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
725 |
CMP/UR/220113/0008789 |
13/01/2022
|
12/03/2022
|
SHOBHA N |
PATRAKARTARA HOUSE BUILDING CO-OPERATIVE SOCIETY LTD. |
Bengaluru Urban |
I request you to direct the society to register the sites on initial aggreed price i.e. 825/Sq.ft. and leavy penalty for delay and direct the society to register the ongoing Media layout with RERA . |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
726 |
CMP/200311/0005691 |
11/03/2020
|
12/03/2022
|
RAVI BHAT |
PROVIDENT HOUSING LIMITED |
Bengaluru Urban |
Help me in getting my money back from the company for failing to deliver the flat within stipulated time |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
727 |
CMP/220122/0008852 |
22/01/2022
|
12/03/2022
|
VINAY ATHREYA |
PARKWEST - MAPLE - TOWER 4 |
Bengaluru Urban |
Compensation and fast tracking of delivery |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
728 |
CMP/210520/0007955 |
20/05/2021
|
12/03/2022
|
ASHWATH KUMAR G |
SHRIPROP DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
I request Authorized person should look into this issues and help me to get my money which i have paid |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
729 |
CMP/211001/0008409 |
01/10/2021
|
12/03/2022
|
PEOCI GHOSH DAS |
SPL TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of Booking amount due to financial issue |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
730 |
CMP/220310/0009104 |
10/03/2022
|
12/03/2022
|
GURURAJ |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Full refund with compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
731 |
CMP/210613/0007993 |
13/06/2021
|
12/03/2022
|
MD SARFARAZ ALAM |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Delay and other compensation till receipt of OC |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
732 |
CMP/210705/0008098 |
05/07/2021
|
12/03/2022
|
K JAVED IQBAL |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Delay compensation and Subvention compensation till receipt of O.C/Handover of flat |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
733 |
CMP/200911/0006553 |
11/09/2020
|
12/03/2022
|
SAMEERA C DAMLE |
SOBHA LIMITED |
Bengaluru Urban |
Facilitate the refund of the booking amount |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
734 |
CMP/201201/0007151 |
01/12/2020
|
12/03/2022
|
NAGA PRASHANTH P |
SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD. |
Bengaluru Rural |
Refund of Rs. 10 Lakhs which i have paid by bidding MSIL chit at higher value + Interest @ 15% from date of payment as i took personal loans and i continued to pay home loan + 5 Lakhs as Mental trauma |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
735 |
CMP/210108/0007417 |
08/01/2021
|
12/03/2022
|
CHOPDE PRAVIN GIRIDHAR |
KRUTHI DEVELOPERS |
Bengaluru Urban |
Possession / Compensation for loss & Rent paid / Refund / NOC from Land Owner |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
736 |
CMP/201230/0007338 |
30/12/2020
|
12/03/2022
|
GURCHARAN SINGH |
SOBHA LIMITED |
Bengaluru Urban |
Refund of my (100% booking amount) Rs. 801000 along with interest that I have paid to the bank. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
737 |
CMP/210918/0008348 |
18/09/2021
|
12/03/2022
|
SHIVANI SHARMA |
SALARPURIA REAL ESTATES PRIVATE LIMITED |
Bengaluru Urban |
Immediate action on builder for 100% Refund without any deductions |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
738 |
CMP/200305/0005643 |
05/03/2020
|
12/03/2022
|
SWEEKAR SHARMA |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Refund amount for GST along with 12% interest for delay and Rs50000/- compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
739 |
CMP/200125/0005289 |
25/01/2020
|
12/03/2022
|
ROHAN KRISHNA |
SOBHA LIMITED |
Bengaluru Urban |
Full Refund with interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
740 |
CMP/210503/0007940 |
03/05/2021
|
12/03/2022
|
AMIT GARG |
SJR PRIMECORPORATION PVT LTD |
Bengaluru Urban |
Compensation for the damage caused and fixing the root cause of seepages at multiple places. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
741 |
CMP/200724/0006250 |
24/07/2020
|
12/03/2022
|
NEETA FARZAN HEERJEE |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
REVOCATION OF RERA REGISTRATION AND NOT TO GRANT ANY FURTHER/NEW REGISTRATIONS TO THE SAME PROMOTER |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
742 |
CMP/220215/0009009 |
15/02/2022
|
12/03/2022
|
SINDHU GVN |
HEBRON PROPERTIES PVT LTD |
Bengaluru Urban |
Please intervene, and take action on Builder/Developer to Process the Refund Amount of 1 lakh rupees on my Flat Booking Cancellation. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
743 |
CMP/210204/0007568 |
04/02/2021
|
12/03/2022
|
ROHAN KUMAR SANTRA |
APEX REALTY VENTURES LLP |
Bengaluru Urban |
Refund of the entire amount paid up to the builder so far along with appropriate compensation for the mental agony caused |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
744 |
CMP/210702/0008090 |
02/07/2021
|
12/03/2022
|
AJIT JUDE IREANEUS LOBO |
PRESTIGE ESTATES PROJECTS LIMTED |
Dakshina Kannada |
Refund of amount paid |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
745 |
CMP/UR/220311/0009111 |
11/03/2022
|
12/03/2022
|
CHITRABANU DURAISAMY |
JAINS AND PALM VENTURES PVT LTD |
Bengaluru Urban |
Make sure they develop the site as liveable |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
746 |
CMP/201130/0007162 |
30/11/2020
|
12/03/2022
|
AMITH KUMAR |
ANTEVORTA DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund with compensations |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
747 |
CMP/220309/0009098 |
09/03/2022
|
12/03/2022
|
SUMITMEHTHA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
require full refund of the money paid and compensation to interest paids and other compensations. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
748 |
CMP/210925/0008376 |
25/09/2021
|
12/03/2022
|
REKHA PREETHAM |
PROVIDENT HOUSING LIMITED |
Dakshina Kannada |
Refund of advance booking amount - Rs 200000 |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
749 |
CMP/211112/0008547 |
12/11/2021
|
12/03/2022
|
SMT NEERAJAKSHI |
PRATHAMM DEVELOPERS |
Bengaluru Urban |
Issue an order directing the Opponent to refund the amount of Rs. 14,67,636/- along with interest and compensation / damages. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
750 |
CMP/201107/0007029 |
07/11/2020
|
12/03/2022
|
R BALAJI |
PROVIDENT HOUSING LIMITED |
Bengaluru Urban |
I WANT MY MONEY REFUND OF TWO LACS |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
751 |
CMP/UR/211104/0008516 |
04/11/2021
|
12/03/2022
|
N PRAKASH |
KORATIGERE NARAYANA VENKATESH IYENGAR |
Bengaluru Urban |
Directions to the Vendor/Developer to execute the Sale Deed in favour of the Complainant immediately with costs |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
752 |
CMP/210713/0008120 |
13/07/2021
|
12/03/2022
|
VIVEKANAND PANDEY |
VSAN INFRASTRUCTURE PVT LTD |
Chikballapur |
Requesting support in the registration of site on priority basis. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
753 |
CMP/210713/0008122 |
13/07/2021
|
12/03/2022
|
ROHIT PANDEY |
VSAN INFRASTRUCTURE PVT LTD |
Chikballapur |
Request your support for the completion of registration site on priority basis. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
754 |
CMP/210711/0008115 |
11/07/2021
|
12/03/2022
|
SANDEEP PUJARI |
PURAVANKARA LIMITED |
Bengaluru Urban |
Refund of the full booking amount of INR 1,00,000.00 as promised by builder while booking the flat. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
755 |
CMP/201224/0007315 |
24/12/2020
|
12/03/2022
|
REKHA |
PURAVANKARA LIMITED |
Bengaluru Urban |
Cancellation of late payment fee of Rs.3,13,849 |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
756 |
CMP/210622/0008021 |
22/06/2021
|
12/03/2022
|
ANAND KUMAR NATARAJAN |
PRESTIGE ESTATES PROJECTS LIMITED |
Bengaluru Urban |
Need full refund of my initial 10% (Rs. 1603372) payment which I have paid. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
757 |
CMP/211115/0008571 |
15/11/2021
|
12/03/2022
|
SHAMARAO MANOHAR |
SOBHA LIMITED |
Bengaluru Urban |
Need help to get Booking amount refund and additional compensation for loss of health, mind stress which had throug over 8 months |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
758 |
CMP/UR/210406/0007869 |
06/04/2021
|
12/03/2022
|
SRIRAM KRISHNAN |
JAIN HOUSING & CONSTRUCTIONS |
Bengaluru Urban |
Complete the villa per the agreement or refund of the amount with interest. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
759 |
CMP/211116/0008574 |
16/11/2021
|
12/03/2022
|
SWAMINATHAN RAJAGOPALAN |
SOBHA LIMITED |
Bengaluru Urban |
Immediate Refund of the Booking amount due to the open litigation on the property |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
760 |
CMP/UR/220311/0009114 |
11/03/2022
|
12/03/2022
|
ASHOK BALASUBRAMANIAM |
JAINS & ALLIANCE PALMS VENTURE PRIVATE LIMITED |
Bengaluru Urban |
Possession of the villa with all amenities along with the penalty payments as per the construction agreement |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
761 |
TMP/220226/0000869 |
26/02/2022
|
12/03/2022
|
PRAVEEN KUMAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
762 |
CMP/UR/220311/0009115 |
11/03/2022
|
12/03/2022
|
RAMANNA HOSMANI |
JAIN HOUSING AND CONSTRUCTIONS LTD |
Bengaluru Urban |
Handover Villa or Refund |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
763 |
CMP/UR/210723/0008158 |
23/07/2021
|
12/03/2022
|
MOHAMMED SAMIULLA |
Tula Praveen |
Bengaluru Urban |
kindly request RERA to direct the respondent to cancel the agreement as per termination agreement. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
764 |
CMP/UR/210723/0008157 |
23/07/2021
|
12/03/2022
|
MOHAMMED SAMIULLA |
Sham N M Raju |
Bengaluru Urban |
kindly request RERA to direct the respondent to cancel the agreement as per termination agreement. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
765 |
CMP/UR/201214/0007009 |
14/12/2020
|
12/03/2022
|
SURENDER KUMAR SARVESHWAR |
ASHISH PURAVANKARA AND RAVI PURAVANKARA (Provident Housing Limited) |
Bengaluru Urban |
Now, we intend not to pursue this Apartment and want the agreement cancelled and request for refund of the application money of Rs. 2,00,000 paid to the opposite party by way of online transfer. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
766 |
CMP/200915/0006589 |
15/09/2020
|
12/03/2022
|
ANOOP S |
S2 HOMES |
Bengaluru Urban |
FIX the issue |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
767 |
CMP/210423/0007921 |
23/04/2021
|
12/03/2022
|
M SIDDHARTHA PAI |
MAHINDRA HOMES PRIVATE LIMITED |
Bengaluru Urban |
appropriate action conseuqent upon violation of Section 13 (1) of the RERA Act |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
768 |
CMP/UR/210623/0008033 |
23/06/2021
|
12/03/2022
|
RAJANI KANTH PANDRANGI |
SANDEEP MEHTA |
Bengaluru Urban |
Interest & penalty, calculated at 10% p.a. for the years delayed |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
769 |
CMP/210505/0007944 |
05/05/2021
|
12/03/2022
|
PIYUSH SHARMA |
SOBHA LIMITED |
Bengaluru Urban |
Request for Help with Refund with accrued Interest during these tough times |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
770 |
CMP/220302/0009062 |
02/03/2022
|
12/03/2022
|
ATUL CHERIAN MULAMOOTIL |
M/S.YD BUILDERS |
Bengaluru Urban |
Cancellation of Exchange Deed of Flat no. 418, UDS rectification in sale deed, clarify OC status, Project completion with all amenities or compensation in this regard |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
771 |
CMP/211120/0008611 |
20/11/2021
|
12/03/2022
|
KOUSHIK GANGAVARAM |
M/S.YD BUILDERS |
Bengaluru Urban |
Uploading of Occupancy Certificate (OC), Project completion with All Amenities, UDS rectification |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
772 |
CMP/210713/0008124 |
13/07/2021
|
12/03/2022
|
KIRAN PANDEY |
VSAN INFRASTRUCTURE PVT LTD |
Chikballapur |
Request your support for the completion of site on priority basis. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
773 |
CMP/210713/0008125 |
13/07/2021
|
12/03/2022
|
ROHIT PANDEY |
VSAN INFRASTRUCTURE PVT LTD |
Chikballapur |
Request your support for the completion of registration of site on priority basis. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
774 |
CMP/210713/0008119 |
13/07/2021
|
12/03/2022
|
HARISH CHANDRA PANDEY |
VSAN INFRASTRUCTURE PVT LTD |
Chikballapur |
REQUIRE DIRECTION TO VSAN INFRA FOR REGISTRATION OF SITE ON PRIORITY BASIS. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
775 |
CMP/210713/0008121 |
13/07/2021
|
12/03/2022
|
VIVEKANAND PANDEY |
VSAN INFRASTRUCTURE PVT LTD |
Chikballapur |
Require support for the registration of site on priority basis. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
776 |
CMP/210210/0007606 |
10/02/2021
|
12/03/2022
|
SHRISTY NARAYAN SHETTY |
GODREJ HOUSING PROJECTS LLP |
Bengaluru Urban |
Comply the Order dated 06-08-2019 |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
777 |
CMP/UR/200914/0006582 |
14/09/2020
|
12/03/2022
|
CHIKKA RAJAKUMARA |
M/S SAN INFRASTRUCTURE PVT LTD |
Bengaluru Urban |
Return of amount along with bank rate of interest |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
778 |
CMP/220121/0008846 |
21/01/2022
|
12/03/2022
|
DR K D CHAKRAVARTY |
SUMADHURA INFRACON PRIVATE LIMITED |
Bengaluru Urban |
DIRECT THE BUILDER TO COMPLETE MY REGISTRATION ( FLAT B 203). RELIEF OF INTERST RS 3.27 LAKHS, CLAIMED BY BUIDER( BECAUSE OF COVID INDUCED FINANCIAL CRISIS) |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
779 |
CMP/210216/0007646 |
16/02/2021
|
12/03/2022
|
MOHAMMED AKBAR |
SOBHA LIMITED |
Bengaluru Urban |
Request you to kindly help me get back my refund of 3 lakhs and other compensations as per the honorable law of Republic of India. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
780 |
CMP/210117/0007459 |
17/01/2021
|
12/03/2022
|
VINEET ARORA |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
REFUND OF EXTRA GST AMOUNT. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
781 |
CMP/211027/0008477 |
27/10/2021
|
12/03/2022
|
DHANESH DAS |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Refund of advance booking paid - Rupees Twenty Thousand |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
782 |
CMP/UR/210209/0007546 |
09/02/2021
|
12/03/2022
|
LOKESH S |
AHAD BUILDERS PVT LTD |
Bengaluru Rural |
OBJECTION to stop approvals |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
783 |
CMP/210118/0007464 |
18/01/2021
|
12/03/2022
|
AAKANKSHA GURUSIDDAPPA |
PURAVANKARA LIMITED |
Bengaluru Urban |
Full Refund , compensation and apology |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
784 |
CMP/UR/201121/0007104 |
21/11/2020
|
12/03/2022
|
VANDIKA KALPITKUMAR BHATT |
SJR PRIME CORPORATION PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delay and related losses suffered |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
785 |
CMP/191210/0004952 |
10/12/2019
|
12/03/2022
|
SUVAJIT CHAKRABORTY |
CMRS INFRASTRUCTURE PVT. LTD |
Bengaluru Urban |
to refund the entire booking/advance amount of Rs.38,00,000/-(Rupees Thirty Eight Lakhs Only) with interest at the rate of 24 % from the date of receipt by the opposite party till repayment |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
Matter has been settled before Lok-adalat |
|
786 |
CMP/201215/0007252 |
15/12/2020
|
12/03/2022
|
RAJIV NAYAN VERMA |
SJR PRIME CORPORATION PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delay and related losses suffered |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
787 |
CMP/UR/201216/0007217 |
16/12/2020
|
12/03/2022
|
RAJESH KAJA |
'BLUE WATERS 'BY SJR PRIME CORPORATION |
Bengaluru Urban |
Compensation for delay and related losses suffered |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
788 |
CMP/211219/0008735 |
19/12/2021
|
12/03/2022
|
UDAYAN M |
ABS BUILDERS AND DEVELOPERS |
Bengaluru Urban |
refund of all expenses incurred along with Interest. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
789 |
CMP/211219/0008734 |
19/12/2021
|
12/03/2022
|
RAGHUPATHY V |
ABS BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Returm of Amount and Expenses Incurred with Interest from the time of Sale Agreement. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
790 |
CMP/200315/0005730 |
15/03/2020
|
12/03/2022
|
RAVEENDRANATH B |
M/S. ALLAM INFINITE INDIA PRIVATE LIMITED |
Bengaluru Urban |
To return entire amount of Rs:1,52,000/- with interest as per Sec 18 of RERA Act |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
791 |
CMP/211111/0008536 |
11/11/2021
|
12/03/2022
|
RAMU |
HI LIFE HOMES |
Bengaluru Urban |
Compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
792 |
CMP/190822/0003978 |
22/08/2019
|
12/03/2022
|
T.KAVITHA |
Kolte-Patil Developers Ltd |
Bengaluru Urban |
compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
793 |
CMP/191224/0005048 |
24/12/2019
|
12/03/2022
|
UTPAL K MEHTA |
MR RAMESH , SECRETARY OF LANDOWNER MR NAGARAJ |
Bengaluru Urban |
compensation of advance payment made to developer or a flat as promsed, we would prefer compensation, iam willing to take only the amount paid to developer and willing to forgo interest if the landown |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
794 |
CMP/210210/0007603 |
10/02/2021
|
12/03/2022
|
J RAMESH |
PURVA STAR PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
RERA Refund Act |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
795 |
CMP/200217/0005109 |
17/02/2020
|
12/03/2022
|
VSAN INFRASTRUCTURE PVT LTD |
Vishwa cariappa B.S |
Bengaluru Urban |
yes |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
796 |
CMP/220316/0009143 |
16/03/2022
|
12/03/2022
|
PADMA REKHA S |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
797 |
CMP/220316/0009141 |
16/03/2022
|
12/03/2022
|
GANESH M SHOLAPUR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation & rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for furtherdelay. No RERA extensions & new tower register without complainants consent. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
798 |
CMP/UR/220311/0009112 |
11/03/2022
|
12/03/2022
|
RAJAH BALU |
JAINS & ALLIANCE PALMS VENTURE PRIVATE LIMITED |
Bengaluru Urban |
Possession of the villa with all amenities along with the penalty payments as per the construction agreement |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
799 |
CMP/211108/0008525 |
08/11/2021
|
12/03/2022
|
BIBIN MATHAI |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation against delay possession |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
800 |
CMP/UR/210403/0007860 |
03/04/2021
|
12/03/2022
|
SREEDHAR EKBOTE |
SANDEEP MEHTA |
Bengaluru Urban |
Delivery of the unit along with all the amenities promised in the agreement |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
801 |
CMP/200204/0005367 |
04/02/2020
|
12/03/2022
|
ANAND MATHAI KURUVILLA AND SHEILA KURUVILLA |
TOTAL ENVIRONMENT HABITAT PRIVATE LIMITED |
Bengaluru Urban |
Refund of the entire amount with interest and compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
802 |
CMP/210705/0008095 |
05/07/2021
|
12/03/2022
|
GEETHA SINGH D |
R K CONSTRUCTIONS |
Bengaluru Urban |
As Per RERA Gudilines, Builder needs to compensate for all the losses and EMI till Possession Or Refund the complete amount with damages |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
803 |
TMP/210309/0000130 |
09/03/2021
|
12/03/2022
|
SURAJ RENGARAJAN |
JAINS HOUSING |
Bengaluru Urban |
Completion of the project and making it livable for the owners |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
804 |
CMP/210706/0008102 |
06/07/2021
|
12/03/2022
|
H R SHANKAR |
SAI SRUSHTI ONEHUB PROJECTS LLP |
Bengaluru Rural |
As on till date they kept avoiding me and also they are not even at least bothered to reply my emails. Hence I humbly request you to kindly intervene and help me to get the full refund with interest. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
805 |
CMP/UR/210102/0007375 |
02/01/2021
|
12/03/2022
|
BRAJESH KUMAR PATEL |
APEX REALTY VENTURES LLP |
Bengaluru Urban |
I humbly request RERA to help me in refund of flat blocking amount of Rs 25000 /- from builder and protect the rights of flat buyers. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
806 |
CMP/200315/0005729 |
15/03/2020
|
12/03/2022
|
H NAGARAJ |
M/S. ALLAM INFINITE INDIA PRIVATE LIMITED |
Bengaluru Urban |
Refund of entire amount of Rs:152000/- with interest as per Sec 18 of RERA Act |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
807 |
CMP/201221/0007294 |
21/12/2020
|
12/03/2022
|
GAURAV SAIT |
SJR PRIME CORPORATION PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delay and related losses suffered |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
808 |
CMP/UR/190808/0003167 |
08/08/2019
|
12/03/2022
|
TARIQUE ANWAR |
SOBHA LIMITED |
Bengaluru Urban |
Refund of 3.5 Lakhs with compensation for delays |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
809 |
CMP/210713/0008123 |
13/07/2021
|
12/03/2022
|
KIRAN PANDEY |
VSAN INFRASTRUCTURE PVT LTD |
Chikballapur |
Request your support for the completion of registration of site on priority basis. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
810 |
CMP/210921/0008361 |
21/09/2021
|
12/03/2022
|
PRATIBHA RAI |
SOBHA LIMITED |
Bengaluru Urban |
Its been 1 year and still I haven't received the refund amount even after multiple follow up. Moreover the respective sales person is also not picking up the call neither responsive in email. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
811 |
CMP/191209/0004931 |
09/12/2019
|
12/03/2022
|
RAVINDRA DIWAKAR CHAUBEY |
DINESH D RANKA |
Bengaluru Urban |
Compensation equivalent to 19500 INR or as per RERA regulation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
812 |
CMP/220303/0009063 |
03/03/2022
|
12/03/2022
|
CH VENKAT RAMESH |
M/S.YD BUILDERS |
Bengaluru Urban |
Cancellation of Exchange Deed of Flat no. 418, UDS Correction in sale deed, clarify OC status, Project completion with all amenities or compensation in this regard |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
813 |
CMP/180917/0001282 |
17/09/2018
|
12/03/2022
|
RAJIV KUMAR |
OCEANUS DWELLINGS (P) LTD |
Bengaluru Urban |
Refund with 16% compounded interest. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
814 |
CMP/UR/210713/0008127 |
13/07/2021
|
12/03/2022
|
SIVA KUMAR T |
PRIDE ORCHADES PRIVATE LIMITED, |
Bengaluru Urban |
Request to get our refund |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
815 |
CMP/210821/0008259 |
21/08/2021
|
12/03/2022
|
NITHYASHREE |
PURAVANKARA LIMITED |
Bengaluru Urban |
Kindly help us in getting the booking amount as it a hard earned money. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
816 |
CMP/201005/0006763 |
05/10/2020
|
12/03/2022
|
AZHAGARASU A |
SOBHA LIMITED |
Bengaluru Urban |
No |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
817 |
CMP/201226/0007330 |
26/12/2020
|
12/03/2022
|
SHAMBHU KUMAR |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
refund resolution |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
818 |
CMP/201029/0006976 |
29/10/2020
|
12/03/2022
|
RAKESH KUMAR SONWANI |
PURAVANKARA LIMITED |
Bengaluru Urban |
Builders is refusing to return the booking amount from last 2 years. Kindly instruct the builder to refund the amount considering the facts of complaint. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
819 |
CMP/UR/201208/0007226 |
08/12/2020
|
12/03/2022
|
SHAOLINE DAS |
SJR PRIME CORPORATION PRIVATE LIMITED |
Bengaluru Urban |
Compensation for delay and related losses suffered |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
820 |
CMP/220309/0009093 |
09/03/2022
|
12/03/2022
|
PRAVEEN PUROHIT |
ROSHAN GARDENIA APARTMENT |
Bengaluru Urban |
Compensation of Rs. 10 Lakhs for the losses incurred due to non completion of the project, rental payments for past 4 years, harassment, mental stress, cost of petitions and other financial burden. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
821 |
CMP/210913/0008326 |
13/09/2021
|
12/03/2022
|
SANJEEV GUPTA |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
The construction is widley stalled, the booking money shall be refunded with 10% interest as per the clause (9) in Nitesh Form |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
822 |
CMP/210803/0008202 |
03/08/2021
|
12/03/2022
|
ROUSHAN KUMAR |
SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD. |
Bengaluru Rural |
Expedite the refund case with applicable compensation against cancellation of flat unit in Sowparnika Columns project |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
823 |
CMP/210205/0007574 |
05/02/2021
|
12/03/2022
|
KOTHARI RAMESHBHAI |
KRUTHI DEVELOPERS |
Bengaluru Urban |
Compensation for delay in possession, Compel builder to complete project in time & remove all illegal construction. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
824 |
CMP/210127/0007509 |
27/01/2021
|
12/03/2022
|
CHOPDE PRAVIN GIRIDHAR |
KRUTHI DEVELOPERS |
Bengaluru Urban |
Kindly Demolish the B&C block connection. -- as upon confrontation with builder, he says take your flat value and sell it back to me and get out. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
825 |
CMP/210203/0007567 |
03/02/2021
|
12/03/2022
|
NARAYAN HIRA DUBARIYA |
KRUTHI DEVELOPERS |
Bengaluru Urban |
Demolish B&C block illegal construction and help me get compensation from builder as well as ask builder to finish project soon |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
826 |
CMP/201204/0007214 |
04/12/2020
|
12/03/2022
|
SACHIN SHIVATAMU |
PRESTIGE ESTATES PROJECTS LIMITED |
Bengaluru Urban |
I am looking for a justification on the cancellation charges from builder. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
827 |
CMP/UR/210319/0007803 |
19/03/2021
|
12/03/2022
|
KAMAL DEEP DHAM |
JAIN HOUSING & CONSTRUCTIONS LTD. |
Bengaluru Urban |
Completion of project or sell it to a third party who can complete this project |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
828 |
CMP/UR/220311/0009113 |
11/03/2022
|
12/03/2022
|
BABU GEORGE |
SANDEEP MEHTA |
Bengaluru Urban |
Make the project in a livable condition from the builder |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
829 |
CMP/220309/0009094 |
09/03/2022
|
12/03/2022
|
H S SRIDHARA MURTHY |
ROSHAN GARDENIA APARTMENT |
Bengaluru Urban |
Compensation of Rs.10 Lakhs for the losses incurred due to non-completion of the project, rental payments for the past 4 years, harrassment,mental stress,cost of petitions and other financial burden |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
830 |
CMP/220309/0009095 |
09/03/2022
|
12/03/2022
|
RAMESH NAYAK B |
ROSHAN GARDENIA APARTMENT |
Bengaluru Urban |
Compensation of Rs 10 Lakhs for the losses incurred due to the non completion of project, rental payment for the past 4 years, harassment, mental stress, cost of petitions, and other financial burden. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
831 |
CMP/210818/0008256 |
18/08/2021
|
12/03/2022
|
RAKESH KIZHAKEPAT |
PROVIDENT HOUSING LIMITED |
Bengaluru Urban |
I need complete refund of booking amount (2lakhs) |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
832 |
CMP/210918/0008353 |
18/09/2021
|
12/03/2022
|
YOGESH SHARMA |
TOTAL ENVIRONMENT HABITAT PRIVATE LIMITED |
Bengaluru Urban |
Refund and compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
833 |
CMP/210826/0008273 |
26/08/2021
|
12/03/2022
|
JAJIT MENON |
SOBHA LIMITED |
Bengaluru Urban |
Refund of full amount paid along with interest. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
834 |
CMP/211029/0008503 |
29/10/2021
|
12/03/2022
|
HARESH KHANDELWAL |
SOBHA LIMITED |
Bengaluru Urban |
Sobha is charging me ~ Rs80,000 as Interest for late payment. Late payment happened due to covid 2nd wave (explained in "Fact of Complaint"). I want RERA to ask sobha to waive this interest charges |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
835 |
CMP/UR/201102/0006992 |
02/11/2020
|
12/03/2022
|
PRASANNA P MATHAD |
PROVIDENT HOUSING LTD |
Bengaluru Urban |
Refund the amount |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
836 |
CMP/211228/0008755 |
28/12/2021
|
12/03/2022
|
VHS SASTRY |
ELEGANT BUILDERS AND DEVELOPERS |
Bengaluru Urban |
request for balance booking amount |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
837 |
CMP/UR/210723/0008159 |
23/07/2021
|
12/03/2022
|
MOHAMMED SAMIULLA |
Madduri Venkateswara Reddy |
Bengaluru Urban |
we kindly request RERA to direct the respondent to cancel the agreement as per termination agreement. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
838 |
CMP/UR/210617/0008000 |
17/06/2021
|
12/03/2022
|
B S MAHESH KUMAR |
BCIL RED EARTH DEVELOPERS INDIA PVT LTD |
Bengaluru Urban |
PLEASE INTERFERE AND SOLVE THE ABOVE SAID ISSUES . |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
839 |
CMP/200512/0005891 |
12/05/2020
|
12/03/2022
|
SONALI A DESAI |
SOBHA LIMITED |
Bengaluru Urban |
Refund of Rs.10, 81,709 (Rupees Ten Lakhs Eighty One Thousand Seven Hundred and Nine) plus 12% Interest p.a from the Refund Application Date Rs.1,29,805 plus Compensation of Rs. 3,00,000 |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
840 |
CMP/210325/0007833 |
25/03/2021
|
12/03/2022
|
SURAJ GHOSH |
SPH GROUPS |
Bengaluru Urban |
To help refund the booking amount plus compensation |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
841 |
CMP/201201/0007152 |
01/12/2020
|
12/03/2022
|
NAGA PRASHANTH PATHIKONDA |
SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD. |
Bengaluru Rural |
Refund of Rs. 10 Lakhs which i have paid by bidding MSIL chit at higher value + Interest @ 15% from date of payment as i took personal loans and i continued to pay home loan + 5 Lakhs as Mental trauma |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
842 |
CMP/201213/0007257 |
13/12/2020
|
12/03/2022
|
PRIYADARSHI JENA |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund with Compensation for Paid Installments and Capital punishment to builder |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
843 |
CMP/210602/0007975 |
02/06/2021
|
12/03/2022
|
ANINDYA DASGUPTA |
APEX REALTY VENTURES LLP |
Bengaluru Urban |
I need the money to help my relatives who are affected by covid. Please deduct minimum amount and provide a refund. |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
844 |
CMP/201116/0007068 |
16/11/2020
|
12/03/2022
|
PRIYA KANNAN |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of paid installments which is around 36.5 Lacs |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
845 |
CMP/200210/0003897 |
10/02/2020
|
12/03/2022
|
GOPAL SAHA |
SHRIVISION HOMES PRIVATE LIMITED |
Bengaluru Urban |
Need the full refund with due interest and penulty |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
846 |
CMP/220222/0009043 |
22/02/2022
|
12/03/2022
|
ARVIND KUMAR VIPPUNUTHULA |
M/S.YD BUILDERS |
Bengaluru Urban |
Cancellation of Exchange Deed of Flat no. 418, UDS rectification in sale deed, clarify OC status, Project completion with all amenities or compensation in this regard |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
847 |
CMP/210526/0007962 |
26/05/2021
|
12/03/2022
|
ROBIN SINGH VASU |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Honorable RERA to check and get us full compensation- MCLR+2%, Additional GST Builder Charged us, Interest & Rent which we paid after 31.12.2019, till we receive OC |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
|
|
848 |
CMP/210817/0008249 |
17/08/2021
|
12/03/2022
|
RAJIV CHODISETTI |
G R PROMOTERS |
Bengaluru Urban |
I request builder to allot parking No 32 as per bbmp approved plan which is opposite to lift and this space is not allotted to anyone today and it's lying empty and it's not used for parking |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
849 |
CMP/210222/0007489 |
22/02/2021
|
12/03/2022
|
RAJIV CHODISETTI |
G R PROMOTERS |
Bengaluru Urban |
I request builder to allocate parking No 32 of bbmp approved plan which is opposite to lift and this slot is not allotted for parking today, so I request builder to allot the same slot to me |
Disposed before Lok Adalat |
AUTHORITY
|
BENCH4
|
|
|
850 |
CMP/UR/210308/0007759 |
08/03/2021
|
12/03/2022
|
SHISHIR KUMAR |
JAIN HOUSING & JAIN CONSTRUCTIONS LTD |
Bengaluru Urban |
I have following requests from RERA, 1. Bring the project under RERA so that the guidelines will be applied. 2. Check what Builder has done with the collected funds. 3. Make the villas livable |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
851 |
CMP/UR/210802/0008195 |
02/08/2021
|
12/03/2022
|
RANGARAJAN NARAYANAN |
JAINS & ALLIANCE PALMS VENTURE PRIVATE LIMITED |
Bengaluru Urban |
Possession of the villa with all amenities along with the penalty payments as per the construction agreement |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
852 |
CMP/UR/210406/0007868 |
06/04/2021
|
12/03/2022
|
NATARAJAN KALLAPADI |
JAIN HOUSING & JAIN CONSTRUCTIONS LTD |
Bengaluru Urban |
Project needs to be livable as per brochure and if builder is not able to execute, RERA help is required to bring a new builder who can execute this project to completion |
Disposed before Lok Adalat |
AUTHORITY
|
FULLBENCH
|
|
|
853 |
CMP/180827/0001188 |
27/08/2018
|
15/12/2018
|
Rajat Garg |
VASATHI AVANTE |
Bengaluru Urban |
Monetary compensation@12% on paid amount till date |
Disposed before Lok Adalat |
ADJUDICATING OFFICER
|
|
Matter is settled in Lok Adalat. |
|