S.No | ACKNOWLEDGEMENT NO | PROMOTER | PROJECT | DISTRICT | TALUK | REASON FOR REJECTION | APPLIED ON | REJECTED ON |
---|---|---|---|---|---|---|---|---|
1 | ACK/KA/RERA/1258/404/PR/140923/007446 | K R sreedhar | Sreedhar K R 68/2 A | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 22/02/2024 request for registration of the project has been rejected |
14/09/2023 | 02/04/2024 |
2 | ACK/KA/RERA/1262/435/PR/160523/007109 | SHREE MRUTHUNJAYA GRAMEENABIRUDDI SAMSHTE SHIGGAON | SHREE MRUTHUNJAYAY GRAMEENABIRUDDI SAMASHTE KAMAN | Haveri | SHIGGAON | As per Hon'ble Authority order dated: 11/01/2024 request for registration of the project has been rejected |
16/05/2023 | 28/03/2024 |
3 | ACK/KA/RERA/1268/378/PR/010423/007011 | MYSORE ZILLA PANCHAYATH EMPLOYEE WELFARE SOCIETY | NANJUNDASWAMY BADAVANE | Mysore | MYSORE | As per the Hon'ble Authority Order dated 11-01-2024 application for project registration is rejected. |
01/04/2023 | 14/03/2024 |
4 | ACK/KA/RERA/1258/404/PR/300523/007146 | Manjunath G N | Manjunath G N Layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 11-01-2024 application for project registration is rejected. |
30/05/2023 | 14/03/2024 |
5 | ACK/KA/RERA/1262/435/PR/240523/007135 | Mahammadjafar M | Mahammadjafar saw mill | Haveri | SHIGGAON | As per the Hon'ble Authority Order dated 11-01-2024 application for project registration is rejected. |
24/05/2023 | 14/03/2024 |
6 | ACK/KA/RERA/1258/404/PR/180523/007120 | Danappa C S | Danappa Layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 11-01-2024 application for project registration is rejected. |
18/05/2023 | 14/03/2024 |
7 | ACK/KA/RERA/1271/291/PR/240823/007388 | BETTAIAH RANGAPPA | RANGAPPA LAYOUT | Shivamogga | BHADRAVATHI | As per Hon'ble Authority order dated:01/02/2024 request for registration of the project has been rejected |
24/08/2023 | 06/03/2024 |
8 | ACK/KA/RERA/1249/447/PR/210723/007299 | SHRI NARAYAN LAXMANSA PAWAR (PROP ARATI CONSTRUCTIONS) | Amrut Empire | Belagavi (Belgaum) | BELAGAVI | As per Hon'ble Authority order dated:01/02/2024 request for registration of the project has been rejected |
21/07/2023 | 06/03/2024 |
9 | ACK/KA/RERA/1258/404/PR/190923/007453 | Gangamma | Ganagmma layout 169 | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 22/02/2024 request for registration of the project has been rejected |
19/09/2023 | 28/02/2024 |
10 | ACK/KA/RERA/1258/404/PR/140923/007443 | Santhosh R G 68 | Santhosh layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 22/02/2024 request for registration of the project has been rejected |
14/09/2023 | 28/02/2024 |
11 | ACK/KA/RERA/1258/404/PR/130923/007439 | Sri kantappa | Srikanthappa Layout 211/1 | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 22/02/2024 request for registration of the project has been rejected |
13/09/2023 | 28/02/2024 |
12 | ACK/KA/RERA/1257/334/PR/110923/007431 | SHEHNAZ BANU | SHAHZAD BUILDERS | Dakshina Kannada | MANGALORE | As per Hon'ble Authority order dated: 22/02/2024 request for registration of the project has been rejected |
11/09/2023 | 28/02/2024 |
13 | ACK/KA/RERA/1258/404/PR/050923/007416 | Manjunath H N 35 / 39 | Manjunath H N 35/39 | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 22/02/2024 request for registration of the project has been rejected |
05/09/2023 | 28/02/2024 |
14 | ACK/KA/RERA/1271/486/PR/140623/007192 | OM SHAKTHI PROPERTIES | BRIGHT CITY | Shivamogga | SHIVAMOGGA | As per Hon'ble Authority order dated:01/02/2024 request for registration of the project has been rejected |
14/06/2023 | 28/02/2024 |
15 | ACK/KA/RERA/1262/435/PR/100623/007186 | B G ramalingesh | Nagalingeshwar Badavane | Haveri | SHIGGAON | As per Hon'ble Authority order dated: 22/02/2024 request for registration of the project has been rejected |
10/06/2023 | 28/02/2024 |
16 | ACK/KA/RERA/1271/486/PR/280823/007399 | P MAGAN RAJ JAIN | SUMAN LAYOUT | Shivamogga | SHIVAMOGGA | As per Hon'ble Authority order dated:01/02/2024 request for registration of the project has been rejected and moved online on the portal for rejection. |
28/08/2023 | 26/02/2024 |
17 | ACK/KA/RERA/1249/447/PR/250823/007394 | M/s ADWAII CONSTRUCTIONS | SRI NIWAS | Belagavi (Belgaum) | BELAGAVI | As per Hon'ble Authority order dated: 01/02/2024 request for registration of the project has been rejected |
25/08/2023 | 26/02/2024 |
18 | ACK/KA/RERA/1271/291/PR/250823/007390 | Renukadevi G and Pankaja R | Patel Thimayya Rangappa Badavane | Shivamogga | BHADRAVATHI | As per Hon'ble Authority order dated: 01/02/2024 request for registration of the project has been rejected |
25/08/2023 | 26/02/2024 |
19 | ACK/KA/RERA/1259/479/PR/220823/007379 | MAHANTESH MALLIKARJUN KARADI | 70o North | Dharwad | HUBLI | As per Hon'ble Authority order dated: 01/02/2024 request for registration of the project has been rejected |
22/08/2023 | 26/02/2024 |
20 | ACK/KA/RERA/1265/339/PR/140823/007364 | M/s Lineshya Projects | Lineysha Palm Retreat Phase I | Kolar | KOLAR | As per Hon'ble Authority order dated:01/02/2024 request for registration of the project has been rejected |
14/08/2023 | 26/02/2024 |
21 | ACK/KA/RERA/1262/435/PR/240723/007312 | sulemanbasha Tarlaghatta | kaveri badavane | Haveri | SHIGGAON | As per Hon'ble Authority order dated: 25/01/2024 request for registration of the project has been rejected |
24/07/2023 | 26/02/2024 |
22 | ACK/KA/RERA/1257/335/PR/020723/007247 | MULIYA DEVELOPERS LLP | MULIYA PRANATHI LAYOUT | Dakshina Kannada | PUTTUR | As per Hon'ble Authority order dated: 25/01/2024 request for registration of the project has been rejected |
02/07/2023 | 26/02/2024 |
23 | ACK/KA/RERA/1258/404/PR/300623/007241 | B UMASHANKAR | GARDEN CITY LAYOUT | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 25/01/2024 request for registration of the project has been rejected |
30/06/2023 | 26/02/2024 |
24 | ACK/KA/RERA/1258/404/PR/240623/007230 | ANIL BARANGAL | M A BARANGAL LAYOUT | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated xx-xx-xx application for project registration is rejected. |
24/06/2023 | 26/02/2024 |
25 | ACK/KA/RERA/1257/334/PR/150623/007203 | SHREE BALEENDRA BUILDERS AND DEVELOPERS | SAI GANESHA | Dakshina Kannada | MANGALORE | As per Hon'ble Authority order dated:18/01/2024 request for registration of the project has been rejected |
15/06/2023 | 26/02/2024 |
26 | ACK/KA/RERA/1258/404/PR/150623/007198 | Basavaraj H | Basavarj layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated:01/02/2024 request for registration of the project has been rejected |
15/06/2023 | 26/02/2024 |
27 | ACK/KA/RERA/1257/335/PR/080623/007179 | MULIYA DEVELOPERS LLP | MULIYA PRANATHI LAYOUT | Dakshina Kannada | PUTTUR | As per Hon'ble Authority order dated: 11/01/2024 request for registration of the project has been rejected |
08/06/2023 | 26/02/2024 |
28 | ACK/KA/RERA/1258/404/PR/040423/007019 | K Annapoornamma | K Annapoornamma layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated:11/01/2024 request for registration of the project has been rejected |
04/04/2023 | 26/02/2024 |
29 | ACK/KA/RERA/1253/286/PR/030623/007162 | ASKA | ASKA | Chamrajanagar | GUNDULPET | As per Hon'ble Authority order dated: 25/01/2024 request for registration of the project has been rejected |
03/06/2023 | 26/02/2024 |
30 | ACK/KA/RERA/1258/404/PR/290523/007143 | Vishwambara B G | Vishwambara Layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 11/01/2024 request for registration of the project has been rejected |
29/05/2023 | 26/02/2024 |
31 | ACK/KA/RERA/1258/404/PR/120523/007101 | J R SATHISHKUMAR | DOLLARS COLLONEY | Davangere | DAVANGERE | As per Hon'ble Authority order dated:11/01/2024 request for registration of the project has been rejected |
12/05/2023 | 26/02/2024 |
32 | ACK/KA/RERA/1249/447/PR/090523/007093 | DEEPA DEVELOPERS PROP ANAND LAXMAN GOSAVI | DEEPA APARTMENT | Belagavi (Belgaum) | BELAGAVI | As per Hon'ble Authority order dated:11/01/2024 request for registration of the project has been rejected |
09/05/2023 | 26/02/2024 |
33 | ACK/KA/RERA/1268/378/PR/050523/007084 | Krishnam Constructions and Developers | Krishnam Hill View | Mysore | MYSORE | As per Hon'ble Authority order dated: 11/01/2024 request for registration of the project has been rejected |
05/05/2023 | 26/02/2024 |
34 | ACK/KA/RERA/1262/435/PR/260423/007066 | Manjunath m kunchur | Manjunath murteppa layout | Haveri | SHIGGAON | As per Hon'ble Authority order dated:11/01/2024 request for registration of the project has been rejected |
26/04/2023 | 26/02/2024 |
35 | ACK/KA/RERA/1250/304/PR/090423/007032 | M R Shankarappa | SK SAMRUDHI | Bengaluru Rural | HOSKOTE | As per Hon'ble Authority order dated: 25/01/2024 request for registration of the project has been rejected |
09/04/2023 | 26/02/2024 |
36 | ACK/KA/RERA/1271/486/PR/300323/006998 | UNIQUE WELL WORTH | PL and KRK PARADISE | Shivamogga | SHIVAMOGGA | As per Hon'ble Authority order dated:11/01/2024 request for registration of the project has been rejected |
30/03/2023 | 26/02/2024 |
37 | ACK/KA/RERA/1271/486/PR/061222/006585 | MADAN H N | SDM LAYOUT | Shivamogga | SHIVAMOGGA | As per Hon'ble Authority order dated: 25/01/2024 request for registration of the project has been rejected |
06/12/2022 | 26/02/2024 |
38 | ACK/KA/RERA/1257/334/PR/070923/007423 | Shree Nidhi Infrastructures | Nandana | Dakshina Kannada | MANGALORE | As per Hon'ble Authority order dated: 18/01/2024 request for registration of the project has been rejected |
07/09/2023 | 15/02/2024 |
39 | ACK/KA/RERA/1265/347/PR/150723/007280 | KANAKASREE ENCLAVE | KANAKASREE ENCLAVE | Kolar | MALUR | As per Hon'ble Authority order dated: 18/01/2024 request for registration of the project has been rejected |
15/07/2023 | 15/02/2024 |
40 | ACK/KA/RERA/1268/378/PR/090623/007182 | B Mahaveer kumar jain | Mahalakshmi Hill View | Mysore | MYSORE | As per Hon'ble Authority order dated: 18/01/2024 request for registration of the project has been rejected |
09/06/2023 | 15/02/2024 |
41 | ACK/KA/RERA/1258/404/PR/050623/007169 | B S JAGADEESHA | B S BASAPPA LAYOUT | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 18/01/2024 request for registration of the project has been rejected |
05/06/2023 | 15/02/2024 |
42 | ACK/KA/RERA/1262/429/PR/010623/007151 | Yaligar Channappa | Yaligar Channappa layout | Haveri | HAVERI | As per Hon'ble Authority order dated: 18/01/2024 request for registration of the project has been rejected |
01/06/2023 | 15/02/2024 |
43 | ACK/KA/RERA/1249/447/PR/260523/007140 | M/S. ASSETS DEVELOPERS | KHB HEIGHTS | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 11/01/2024 application for project registration is rejected. |
26/05/2023 | 15/02/2024 |
44 | ACK/KA/RERA/1250/303/PR/160523/007112 | TELECOM EMPLOYEES CO-OPERATIVE HOUSING SOCIETY LTD | GREEN FIELD GARDENS EXTENSION 4 AND 5A | Bengaluru Rural | DEVANAHALLI | As per Hon'ble Authority order dated: 18/01/2024 request for registration of the project has been rejected |
16/05/2023 | 15/02/2024 |
45 | ACK/KA/RERA/1258/404/PR/130523/007107 | SUPREME DEVELOPERS | MANOMAY LAYOUT 1 | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 18/01/2024 request for registration of the project has been rejected |
13/05/2023 | 15/02/2024 |
46 | ACK/KA/RERA/1258/404/PR/130523/007104 | SUPREME DEVELOPERS | MANOMAY LAYOUT 2 | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 11/01/2024 application for project registration is rejected. |
13/05/2023 | 15/02/2024 |
47 | ACK/KA/RERA/1251/310/PR/040523/007083 | SLV BUILDERS & DEVELOPERS | SLV MILLENNIAL | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 11/01/2024 application for project registration is rejected. |
04/05/2023 | 15/02/2024 |
48 | ACK/KA/RERA/1271/291/PR/120523/007103 | RAFEE ULLA KHAN | S.K. LAYOUT | Shivamogga | BHADRAVATHI | As per Hon'ble Authority order dated: 18/01/2024 request for Registration of the project has been rejected |
12/05/2023 | 15/02/2024 |
49 | ACK/KA/RERA/1251/472/PR/080523/007089 | BETTAIAH B | ELBEE WATER EDGE | Bengaluru Urban | YELAHANKA | As per the Hon'ble Authority Order dated 11/01/2024 application for project registration is rejected. |
08/05/2023 | 15/02/2024 |
50 | ACK/KA/RERA/1250/304/PR/060523/007088 | JP Housing Corporation | JP IRIS | Bengaluru Rural | HOSKOTE | As per Hon'ble Authority order dated: 18/01/2024 request for registration of the project has been rejected |
06/05/2023 | 15/02/2024 |
51 | ACK/KA/RERA/1249/447/PR/100423/007036 | M/s. Assets Developers | MADINA TOWERS | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 11/01/2024 application for project registration is rejected. |
10/04/2023 | 15/02/2024 |
52 | ACK/KA/RERA/1258/404/PR/010423/007012 | Sree Hari J T | Sree Hari J T - layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 11/01/2024 application for project registration is rejected. |
01/04/2023 | 15/02/2024 |
53 | ACK/KA/RERA/1268/378/PR/260223/006885 | Prema Ayyangar | Koushalya nagara 6th phase | Mysore | MYSORE | As per Hon'ble Authority order dated: 18/01/2024 request for registration of the project has been rejected |
26/02/2023 | 15/02/2024 |
54 | ACK/KA/RERA/1268/380/PR/040223/006797 | R PRAVEEN GOEL | SHIVAM LAYOUT | Mysore | NANJANGUD | As per Hon'ble Authority order dated: 18/01/2024 request for registration of the project has been rejected |
04/02/2023 | 15/02/2024 |
55 | ACK/KA/RERA/1258/404/PR/211022/006457 | siddappa S | siddappa layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 18/01/2024 request for registration of the project has been rejected |
21/10/2022 | 15/02/2024 |
56 | ACK/KA/RERA/1251/310/PR/200529/004027 | Bangalore Development Authority | NPKL KOMAGHATTA PHASE 3 | Bengaluru Urban | Bengaluru South | As per Hon'ble Authority order dated: 22/06/2023 request for registration of the project has been rejected |
29/05/2020 | 15/02/2024 |
57 | ACK/KA/RERA/1249/447/PR/080723/007264 | AADISHAKTI CONSTRUCTION COMPANY | SHREE SWAMI SAMRTH SANKALP RESIDENCY | Belagavi (Belgaum) | BELAGAVI | As per Hon'ble Authority order dated: 21/12/2023 request for registration of the project has been rejected |
08/07/2023 | 16/01/2024 |
58 | ACK/KA/RERA/1258/404/PR/080323/006930 | Suresh Enterprises | Suresh Layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 07/12/2023 request for registration of the project has been rejected |
08/03/2023 | 16/01/2024 |
59 | ACK/KA/RERA/1249/447/PR/030423/007013 | VRISHABENDRA P HIREMATH PROP SHRI PARVATI CONSTRUCTION.CO | NISHAKARA | Belagavi (Belgaum) | BELAGAVI | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
03/04/2023 | 10/01/2024 |
60 | ACK/KA/RERA/1251/308/PR/300323/007004 | PIONIER PPROJECT | ELEMENTS | Bengaluru Urban | Anekal | As per Hon'ble Authority order dated:21/12/2023 request for registration of the project has been rejected |
30/03/2023 | 10/01/2024 |
61 | ACK/KA/RERA/1258/404/PR/290323/006995 | Hanumantappa k Hadagad | Hanumantappa Layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
29/03/2023 | 10/01/2024 |
62 | ACK/KA/RERA/1258/404/PR/240323/006990 | Rudresh K B | Rudresh Layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
24/03/2023 | 10/01/2024 |
63 | ACK/KA/RERA/1258/405/PR/150323/006959 | Rakesh Patil | Rakesh Patil layout | Davangere | HARIHAR | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
15/03/2023 | 10/01/2024 |
64 | ACK/KA/RERA/1258/404/PR/150323/006958 | Vishal S | vishal layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
15/03/2023 | 10/01/2024 |
65 | ACK/KA/RERA/1258/404/PR/150323/006957 | Savitha S L | Savith S L | Davangere | DAVANGERE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
15/03/2023 | 10/01/2024 |
66 | ACK/KA/RERA/1258/404/PR/140323/006954 | Jayanna B | Jayanna layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
14/03/2023 | 10/01/2024 |
67 | ACK/KA/RERA/1251/446/PR/130323/006951 | ARK GLOBAL ESTATES | MELROSE | Bengaluru Urban | Bengaluru East | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
13/03/2023 | 10/01/2024 |
68 | ACK/KA/RERA/1268/378/PR/030323/006905 | Ananda Kumar H | Kamadhenu Badavane | Mysore | MYSORE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
03/03/2023 | 10/01/2024 |
69 | ACK/KA/RERA/1251/310/PR/030323/006904 | Oceanus Dwellings Pvt Ltd | Oceanus White Meadows | Bengaluru Urban | Bengaluru South | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
03/03/2023 | 10/01/2024 |
70 | ACK/KA/RERA/1258/404/PR/230223/006875 | Nagamma | Nagamma layout kundavada | Davangere | DAVANGERE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
23/02/2023 | 10/01/2024 |
71 | ACK/KA/RERA/1268/378/PR/030323/006902 | MADHUVANA HBCS | B.T.S LAYOUT - 1st STAGE | Mysore | MYSORE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
03/03/2023 | 10/01/2024 |
72 | ACK/KA/RERA/1262/432/PR/030323/006901 | Moulali Walikar | Moulali Walikar LAYOUT | Haveri | HANGEL | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
03/03/2023 | 10/01/2024 |
73 | ACK/KA/RERA/1258/404/PR/020323/006891 | R G JAGADEESH | JAGADEESH R G | Davangere | DAVANGERE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
02/03/2023 | 10/01/2024 |
74 | ACK/KA/RERA/1258/404/PR/230223/006876 | manjunatha G | manjunath 232/1 | Davangere | DAVANGERE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
23/02/2023 | 10/01/2024 |
75 | ACK/KA/RERA/1258/404/PR/230223/006874 | Manjuntha G 215/1 | Manjunath Shamanur | Davangere | DAVANGERE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
23/02/2023 | 10/01/2024 |
76 | ACK/KA/RERA/1258/408/PR/160223/006838 | Murigendrappa C H 03 | Murigendrappa 166/10* | Davangere | HONNALI | As per Hon'ble Authority order dated:04/12/2023 request for registration of the project has been rejected |
16/02/2023 | 10/01/2024 |
77 | ACK/KA/RERA/1271/291/PR/130223/006827 | MUDLIGOWDA H | PRK LAYOUT | Shivamogga | BHADRAVATHI | As per Hon'ble Authority order dated:04/12/2023 request for registration of the project has been rejected |
13/02/2023 | 10/01/2024 |
78 | ACK/KA/RERA/1271/294/PR/120223/006825 | MARTHANDA H B | CHANDRODAYA LAYOUT | Shivamogga | THIRTHAHALLI | As per Hon'ble Authority order dated:21/12/2023 request for registration of the project has been rejected |
12/02/2023 | 10/01/2024 |
79 | ACK/KA/RERA/1251/446/PR/250123/006767 | Munisubbaiah M | Nagarjuna Enclave | Bengaluru Urban | Bengaluru East | As per Hon'ble Authority order dated:04/12/2023 request for registration of the project has been rejected |
25/01/2023 | 10/01/2024 |
80 | ACK/KA/RERA/1271/486/PR/071022/006408 | SHIVANANDA RAO | SHIVANANDA RAO | Shivamogga | SHIVAMOGGA | As per Hon'ble Authority order dated:21/12/2023 request for registration of the project has been rejected |
07/10/2022 | 10/01/2024 |
81 | ACK/KA/RERA/1268/378/PR/081022/006416 | NANDANA DEVELOPERS | PUSHYA BADAVANE | Mysore | MYSORE | As per Hon'ble Authority order dated:07/12/2023 request for registration of the project has been rejected |
08/10/2022 | 10/01/2024 |
82 | ACK/KA/RERA/1249/447/PR/241122/006554 | Dayaar Ventures | Silver Ray | Belagavi (Belgaum) | BELAGAVI | As per Hon'ble Authority order dated: 02/11/2023 request for registration of the project has been rejected |
24/11/2022 | 28/12/2023 |
83 | ACK/KA/RERA/1251/310/PR/200602/004031 | BDA | NPKL KOMAGHATTA PHASE 1 | Bengaluru Urban | Bengaluru South | As per Hon'ble Authority order dated: 22/06/2023 request for registration of the project has been rejected |
02/06/2020 | 28/12/2023 |
84 | ACK/KA/RERA/1251/310/PR/200529/004026 | Banagalore Development Authority | NPKL KOMAGHATTA PHASE 2 | Bengaluru Urban | Bengaluru South | As per Hon'ble Authority order dated: 22/06/2023 request for registration of the project has been rejected |
29/05/2020 | 28/12/2023 |
85 | ACK/KA/RERA/1251/309/PR/130622/006039 | ELEGANT PROPERTIES | ELEGANT ALTIS | Bengaluru Urban | Bengaluru North | As per Hon'ble Authority order dated: 29 /11/2023 request for registration of the project has been rejected |
13/06/2022 | 07/12/2023 |
86 | ACK/KA/RERA/1249/447/PR/150323/006960 | SMART CONSTRUCTIONS | SMART PARADISE RESIDENCY | Belagavi (Belgaum) | BELAGAVI | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
15/03/2023 | 29/11/2023 |
87 | ACK/KA/RERA/1258/404/PR/170223/006841 | M S Patil | M A PATIL | Davangere | DAVANGERE | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
17/02/2023 | 29/11/2023 |
88 | ACK/KA/RERA/1258/408/PR/170223/006840 | M S Patil 01 | M S Patil 162/13-1 | Davangere | HONNALI | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
17/02/2023 | 29/11/2023 |
89 | ACK/KA/RERA/1258/404/PR/110223/006822 | S Shilpa | Shilpa layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
11/02/2023 | 29/11/2023 |
90 | ACK/KA/RERA/1258/404/PR/241122/006551 | vijaya kumar | Vijya layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
24/11/2022 | 29/11/2023 |
91 | ACK/KA/RERA/1258/404/PR/221122/006549 | Nagaraj B | Nagaraj | Davangere | DAVANGERE | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
22/11/2022 | 29/11/2023 |
92 | ACK/KA/RERA/1254/460/PR/161122/006526 | Eternity Adore | Eternity Grape County | Chikballapur | Chikkaballapur | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
16/11/2022 | 29/11/2023 |
93 | ACK/KA/RERA/1268/378/PR/121022/006430 | DEEPU S | BHAGYASHREE ENCLAVE | Mysore | MYSORE | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
12/10/2022 | 29/11/2023 |
94 | ACK/KA/RERA/1258/406/PR/090922/006337 | AEE KHB DAVANGERE | Channagiri,Chikkulekere Sy no 86 | Davangere | CHANNAGIRI | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
09/09/2022 | 29/11/2023 |
95 | ACK/KA/RERA/1249/447/PR/220722/006169 | ADARSH SHIVAJI MUCHANDI | ANJANAADRI RESIDENCY | Belagavi (Belgaum) | BELAGAVI | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
22/07/2022 | 29/11/2023 |
96 | ACK/KA/RERA/1249/447/PR/241122/006555 | DAYAAR ASSOCIATES | Silver Ray | Belagavi (Belgaum) | BELAGAVI | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
24/11/2022 | 23/11/2023 |
97 | ACK/KA/RERA/1258/408/PR/160223/006837 | Murigendrappa CH 02 | Murigendrappa 166/6 | Davangere | HONNALI | As per Hon'ble Authority order dated: 02/11/2023 request for registration of the project has been rejected |
16/02/2023 | 23/11/2023 |
98 | ACK/KA/RERA/1258/404/PR/160223/006836 | Murigendrappa C H 01 | Murigendrappa 166/10-1 | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 02/111/2023 request for registration of the project has been rejected |
16/02/2023 | 23/11/2023 |
99 | ACK/KA/RERA/1258/404/PR/040223/006796 | Sudarshan M N | sudarshan LAY OUT | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 02/11/2023 request for registration of the project has been rejected |
04/02/2023 | 23/11/2023 |
100 | ACK/KA/RERA/1249/367/PR/020223/006791 | ANWAR DADIWALE | VEER SAVARKAR NAGAR | Belagavi (Belgaum) | CHIKODI | As per Hon'ble Authority order dated: 02/11/2023 request for registration of the project has been rejected |
02/02/2023 | 23/11/2023 |
101 | ACK/KA/RERA/1252/282/PR/110123/006719 | RAJKUMAR | SK PATIL LAYOUT | Bidar | BASAVAKALYAN | As per Hon'ble Authority order dated:02/11/2023 request for registration of the project has been rejected |
11/01/2023 | 23/11/2023 |
102 | ACK/KA/RERA/1271/486/PR/251022/006463 | SAYEEDA BEGUM | HEGGERI BADAVANE | Shivamogga | SHIVAMOGGA | As per Hon'ble Authority order dated: 31/10/2023 request for registration of the project has been rejected |
25/10/2022 | 23/11/2023 |
103 | ACK/KA/RERA/1251/446/PR/220223/006869 | M/s ODION BUILDERS AND DEVELOPERS | THE WOODS OF EAST PHASE VI | Bengaluru Urban | Bengaluru East | As per Hon'ble Authority order dated: 31/10/2023 request for registration of the project has been rejected |
22/02/2023 | 15/11/2023 |
104 | ACK/KA/RERA/1258/404/PR/210223/006862 | manjula k m | manjula k m | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 25/10/2023 request for registration of the project has been rejected |
21/02/2023 | 15/11/2023 |
105 | ACK/KA/RERA/1251/308/PR/200223/006858 | CONFIDENT PROJECTS (INDIA) PRIVATE LIMITED | Confident Kingston | Bengaluru Urban | Anekal | As per Hon'ble Authority order dated: 25/10/2023 request for registration of the project has been rejected |
20/02/2023 | 15/11/2023 |
106 | ACK/KA/RERA/1271/294/PR/190223/006853 | K L PRABHAKAR | KERODI LAYOUT | Shivamogga | THIRTHAHALLI | As per Hon'ble Authority order dated: 25/10/2023 request for registration of the project has been rejected |
19/02/2023 | 15/11/2023 |
107 | ACK/KA/RERA/1258/408/PR/170223/006843 | M S Patil 04 | M S patil 162/3 | Davangere | HONNALI | As per Hon'ble Authority order dated: 25/10/2023 request for registration of the project has been rejected |
17/02/2023 | 15/11/2023 |
108 | ACK/KA/RERA/1249/367/PR/010623/007152 | M/S RATUJA DEVELOPERS | Shri Sant Baba Maharaj Complex | Belagavi (Belgaum) | CHIKODI | As per the Hon'ble Authority Order dated 11/10/2023 application for project registration is rejected. |
01/06/2023 | 31/10/2023 |
109 | ACK/KA/RERA/1271/291/PR/260123/006769 | A N KRISHNAMURTHY KY VEENA AND A N NARAYANA | BANASHANKARI LAYOUT | Shivamogga | BHADRAVATHI | As per the Hon'ble Authority Order dated 11/10/2023 application for project registration is rejected. |
26/01/2023 | 31/10/2023 |
110 | ACK/KA/RERA/1268/378/PR/230123/006759 | KRISHNE GOWDA T.R | SRI RAMA LAYOUT | Mysore | MYSORE | As per the Hon'ble Authority Order dated 12/10/2023 application for project registration is rejected. |
23/01/2023 | 31/10/2023 |
111 | ACK/KA/RERA/1268/378/PR/230123/006758 | BHARATHI K S | H.S.N LAYOUT | Mysore | MYSORE | As per the Hon'ble Authority Order dated 10/10/2023 application for project registration is rejected. |
23/01/2023 | 31/10/2023 |
112 | ACK/KA/RERA/1251/309/PR/221220/006628 | KARNATAKA SLUM DEVELOPMENT BOARD | PMAY1500 MAHALAKSHMI LAYOUT | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 11/10/2023 application for project registration is rejected. |
20/12/2022 | 31/10/2023 |
113 | ACK/KA/RERA/1268/378/PR/230123/006757 | KRISHNE GOWDA T.R | SRI RAGHAVENDRA LAYOUT | Mysore | MYSORE | As per the Hon'ble Authority Order dated 12/10/2023 application for project registration is rejected. |
23/01/2023 | 31/10/2023 |
114 | ACK/KA/RERA/1255/477/PR/140123/006726 | KESHAVEGOWDA L K | NIRVANA | Chikkamagaluru | CHIKKAMAGALURU | As per the Hon'ble Authority Order dated 11/10/2023 application for project registration is rejected. |
14/01/2023 | 31/10/2023 |
115 | ACK/KA/RERA/1258/404/PR/100123/006714 | Nagarajappa M | Madivalara nagarajappa Layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 10/10/2023 application for project registration is rejected. |
10/01/2023 | 31/10/2023 |
116 | ACK/KA/RERA/1258/404/PR/201222/006627 | Rudresh | Rudresh | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 11/10/2023 application for project registration is rejected. |
20/12/2022 | 31/10/2023 |
117 | ACK/KA/RERA/1274/353/PR/221219/006625 | KARNATAKA SLUM DEVELOPMENT BOARD | Construction of 313 @ Bhtkala | Uttara Kannada | BHATKAL | As per the Hon'ble Authority Order dated 12/10/2023 application for project registration is rejected. |
19/12/2022 | 31/10/2023 |
118 | ACK/KA/RERA/1258/404/PR/101222/006601 | veeresh kumar | veeresh layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 12/10/2023 application for project registration is rejected. |
10/12/2022 | 31/10/2023 |
119 | ACK/KA/RERA/1263/419/PR/021222/006579 | AKHILESH KALASHETTY | HB ENCLAVE | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 11/10/2023 application for project registration is rejected. |
02/12/2022 | 31/10/2023 |
120 | ACK/KA/RERA/1263/419/PR/281122/006565 | M/S SIDRAM PROPERTIES | SIDRAM-RESIDENCY | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 12/10/2023 application for project registration is rejected. |
28/11/2022 | 31/10/2023 |
121 | ACK/KA/RERA/1249/367/PR/200925/004253 | SHRIPAD RAJARAM NERLIKAR | ANAND RESIDENCE | Belagavi (Belgaum) | CHIKODI | As per Hon'ble Authority order dated: 11/10/2023 request for registration of the project has been rejected |
25/09/2020 | 31/10/2023 |
122 | TOR/ACK/KA/RERA/1251/472/PR/221104/006490 | ACTIVE HOMES PVT LTD | ADITRRI LOTUS | Bengaluru Urban | YELAHANKA | As per the Hon'ble Authority Order dated 12/09/2023 application for project registration is rejected. |
04/11/2022 | 20/09/2023 |
123 | ACK/KA/RERA/1258/408/PR/311222/006686 | Puttamma H P | PUTTAMMA LAYOUT | Davangere | HONNALI | As per the Hon'ble Authority Order dated 17/08/2023 application for project registration is rejected. |
31/12/2022 | 06/09/2023 |
124 | ACK/KA/RERA/1268/378/PR/241222/006662 | VEENA B | AMMA RESIDENCY | Mysore | MYSORE | As per the Hon'ble Authority Order dated 17/08/2023 application for project registration is rejected. |
24/12/2022 | 06/09/2023 |
125 | ACK/KA/RERA/1258/404/PR/231222/006656 | Vijya kumar | Vijyakumar layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 17/08/2023 application for project registration is rejected. |
23/12/2022 | 06/09/2023 |
126 | ACK/KA/RERA/1258/404/PR/081222/006596 | AShwini | Ashwini layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 17/08/2023 application for project registration is rejected. |
08/12/2022 | 06/09/2023 |
127 | ACK/KA/RERA/1258/404/PR/081222/006594 | L NINGAPPA | NINGAPPA LAYOUT | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 17/08/2023 application for project registration is rejected. |
08/12/2022 | 06/09/2023 |
128 | ACK/KA/RERA/1248/440/PR/071222/006591 | Ballari DCC Bank Employees House Building Co-operative Society | B D C C Bank Emp's House Building Co-op Society | Vijayanagara | HOSPET | As per the Hon'ble Authority Order dated 24/08/2023 application for project registration is rejected. |
07/12/2022 | 06/09/2023 |
129 | ACK/KA/RERA/1271/486/PR/061222/006589 | H V UMESH | SHIVAPRIYA LAYOUT | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 24/08/2023 application for project registration is rejected. |
06/12/2022 | 06/09/2023 |
130 | ACK/KA/RERA/1261/482/PR/151122/006523 | K N PRAKASH | PRAKASH ENCLAVE | Hassan | HASSAN | As per the Hon'ble Authority Order dated 17/08/2023 application for project registration is rejected. |
15/11/2022 | 06/09/2023 |
131 | ACK/KA/RERA/1268/378/PR/041022/006401 | PINNACLE GREEN | PINNACLE GREEN | Mysore | MYSORE | As per the Hon'ble Authority Order dated 17/08/2023 application for project registration is rejected. |
04/10/2022 | 06/09/2023 |
132 | ACK/KA/RERA/1268/378/PR/210325/004854 | LAKSHMI SAGAR H R | Prof. RANGAIAH SHIVATHEERTHAN LAYOUT | Mysore | MYSORE | As per the Hon'ble Authority Order dated 24/08/2023 application for project registration is rejected. |
25/03/2021 | 06/09/2023 |
133 | ACK/KA/RERA/1268/378/PR/201205/004421 | Santhas YS | Vinayaka Garden City phase 3 | Mysore | MYSORE | As per the Hon'ble Authority Order dated 24/08/2023 application for project registration is rejected. |
05/12/2020 | 06/09/2023 |
134 | ACK/KA/RERA/1250/303/PR/191129/003717 | Lotus Value | Lotus Nature Park | Bengaluru Rural | DEVANAHALLI | As per the Hon'ble Authority Order dated 17/08/2023 application for project registration is rejected. |
29/11/2019 | 06/09/2023 |
135 | ACK/KA/RERA/1258/404/PR/061022/006406 | Nagaraj n t | Nagaraj n t | Davangere | DAVANGERE | As per Hon'ble Authority order dated:30/07/2023 request for registration of the project has been rejected |
06/10/2022 | 18/08/2023 |
136 | TOR/ACK/KA/RERA/1268/378/PR/220907/006329 | VINSCO BUILDTECH PVT LTD | Vinsco Aigiri Enclave | Mysore | MYSORE | As per Hon'ble Authority order dated:25/07/2023 request for Transfer of Rights of the project has been rejected |
07/09/2022 | 18/08/2023 |
137 | ACK/KA/RERA/1268/378/PR/070922/006323 | M B Boregowda | SUMUKHA LAYOUT | Mysore | MYSORE | As per Hon'ble Authority order dated:20/07/2023 request for registration of the project has been rejected |
07/09/2022 | 18/08/2023 |
138 | ACK/KA/RERA/1258/404/PR/110822/006230 | shivandappa p k | shivandappa | Davangere | DAVANGERE | As per Hon'ble Authority order dated:20/07/2023 request for registration of the project has been rejected |
11/08/2022 | 18/08/2023 |
139 | ACK/KA/RERA/1271/294/PR/270722/006179 | H. M. Shivaram Udupa | Arunodaya Layout | Shivamogga | THIRTHAHALLI | As per Hon'ble Authority order dated:20/07/2023 request for registration of the project has been rejected |
27/07/2022 | 18/08/2023 |
140 | TOR/ACK/KA/RERA/1268/378/PR/210116/004514 | BANK OFFICERS AND OFFICIALS WELFARE ASSOCIATION | VAJAMANGALA, MYSORE | Mysore | MYSORE | As per Hon'ble Authority order dated:18/07/2023 request for Transfer of Rights of the project has been rejected |
16/01/2021 | 18/08/2023 |
141 | ACK/KA/RERA/1249/447/PR/230322/005797 | Dayaar Ventures | Silver Spark | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 20/07/2023 application for project registration is rejected. |
23/03/2022 | 17/08/2023 |
142 | ACK/KA/RERA/1257/333/PR/171122/006530 | INFO DEVELOPERS | INFO CENTER | Dakshina Kannada | DAKSHINA KANNADA | As per Hon'ble Authority order dated: 27/07/2023 request for registration of the project has been rejected |
17/11/2022 | 04/08/2023 |
143 | ACK/KA/RERA/1271/486/PR/141122/006520 | GADIGEPPA | GANGOTHRI LAYOUT | Shivamogga | SHIVAMOGGA | As per Hon'ble Authority order dated: 20/07/2023 request for registration of the project has been rejected |
14/11/2022 | 04/08/2023 |
144 | ACK/KA/RERA/1258/405/PR/071122/006502 | Ramprasad | Ramprasad kulkarni | Davangere | HARIHAR | As per Hon'ble Authority order dated: 27/07/2023 request for registration of the project has been rejected |
07/11/2022 | 04/08/2023 |
145 | ACK/KA/RERA/1268/378/PR/121022/006434 | GANGESH B K | ORANGE ENCLAVE | Mysore | MYSORE | As per Hon'ble Authority order dated: 27/07/2023 request for registration of the project has been rejected |
12/10/2022 | 04/08/2023 |
146 | ACK/KA/RERA/1258/404/PR/021022/006370 | Ajaya kumar B G | AJYA LAYOUT | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 27/07/2023 request for registration of the project has been rejected |
02/10/2022 | 04/08/2023 |
147 | ACK/KA/RERA/1268/378/PR/160922/006362 | B Y SHIVANNA | BY Shivanna | Mysore | MYSORE | As per Hon'ble Authority order dated: 20/07/2023 request for registration of the project has been rejected |
16/09/2022 | 04/08/2023 |
148 | ACK/KA/RERA/1258/404/PR/080922/006330 | Manjuanth | Manjuanth layout | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 20/07/2023 request for registration of the project has been rejected |
08/09/2022 | 04/08/2023 |
149 | ACK/KA/RERA/1268/384/PR/211011/005318 | SAN PROPERTIES AND DEVELOPERS | NEW TOWN | Mysore | PIRIYAPATNA | As per Hon'ble Authority order dated: 20/07/2023 request for registration of the project has been rejected |
11/10/2021 | 04/08/2023 |
150 | ACK/KA/RERA/1275/448/PR/210925/005276 | V G PAREKH AND COMPANY | Paragule Colony | Vijayapura | Bijapur | As per Hon'ble Authority order dated: 20/07/2023 request for registration of the project has been rejected |
25/09/2021 | 04/08/2023 |
151 | ACK/KA/RERA/1258/404/PR/151022/006444 | Deepak J B | deepak | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 20/07/2023 application for project registration is rejected. |
15/10/2022 | 02/08/2023 |
152 | ACK/KA/RERA/1268/378/PR/270822/006288 | S M Shivaprakash | ANNAPOORNESWARI LAYOUT 2ND STAGE 5TH PHASE | Mysore | MYSORE | As per the Hon'ble Authority Order dated 19/07/2023 application for project registration is rejected. |
27/08/2022 | 02/08/2023 |
153 | ACK/KA/RERA/1258/404/PR/260822/006282 | AJAY | FLOTS | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 19/07/2023 application for project registration is rejected. |
26/08/2022 | 02/08/2023 |
154 | ACK/KA/RERA/1258/404/PR/260822/006281 | Raj kumar | RAJ | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 20/07/2023 application for project registration is rejected. |
26/08/2022 | 02/08/2023 |
155 | ACK/KA/RERA/1258/404/PR/290822/006291 | B M Channesh | Channesh layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 20/07/2023 application for project registration is rejected. |
29/08/2022 | 02/08/2023 |
156 | ACK/KA/RERA/1251/472/PR/250822/006280 | Ramachandra K | KANISHA WHITE PALACE | Bengaluru Urban | YELAHANKA | As per the Hon'ble Authority Order dated 19/07/2023 application for project registration is rejected. |
25/08/2022 | 02/08/2023 |
157 | ACK/KA/RERA/1257/333/PR/240822/006275 | CHITHARAJA SALIAN | Yash Commercial Complex | Dakshina Kannada | DAKSHINA KANNADA | As per the Hon'ble Authority Order dated 19/07/2023 application for project registration is rejected. |
24/08/2022 | 02/08/2023 |
158 | ACK/KA/RERA/1274/352/PR/180822/006252 | MANJUNATH R RAIKAR | ASHU RESIDENTIAL LAYOUT | Uttara Kannada | SIRSI | As per the Hon'ble Authority Order dated 20/07/2023 application for project registration is rejected. |
18/08/2022 | 02/08/2023 |
159 | ACK/KA/RERA/1258/404/PR/160822/006238 | Mohammed R | Mohammed | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 20/07/2023 application for project registration is rejected. |
16/08/2022 | 02/08/2023 |
160 | ACK/KA/RERA/1258/404/PR/050822/006212 | Eshwarappa | Eshwarappa LAYOUT | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 20/07/2023 application for project registration is rejected. |
05/08/2022 | 02/08/2023 |
161 | ACK/KA/RERA/1268/378/PR/050722/006111 | Ratanraj Ventures LLP | SANDLEWOOD ENCLAVE | Mysore | MYSORE | As per the Hon'ble Authority Order dated 20/07/2023 application for project registration is rejected. |
05/07/2022 | 02/08/2023 |
162 | ACK/KA/RERA/1263/419/PR/100622/006035 | ISHANYA CONSTRUCTIONS | MEERANANTH RESIDENCY | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 13/07/2023 application for project registration is rejected. |
10/06/2022 | 02/08/2023 |
163 | ACK/KA/RERA/1250/303/PR/240222/005707 | OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED | Southend 2 | Bengaluru Rural | DEVANAHALLI | As per the Hon'ble Authority Order dated 27/07/2023 application for project registration is rejected. |
24/02/2022 | 02/08/2023 |
164 | TOR/ACK/KA/RERA/1251/308/PR/210427/004955 | CoEvolve Emerald LLP | CoEVOLVE EMERALD | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 25/07/2023 application for project registration is rejected. |
27/04/2021 | 02/08/2023 |
165 | ACK/KA/RERA/1275/448/PR/210925/005277 | V G PAREKH AND COMPANY | Chandan Nagar | Vijayapura | Bijapur | As per the Hon'ble Authority Order dated 20/07/2023 application for project registration is rejected. |
25/09/2021 | 02/08/2023 |
166 | ACK/KA/RERA/1272/402/PR/060922/006318 | K R Anasuya | Gruhalakshmi Layout | Tumakuru | KUNIGAL | As per the Hon'ble Authority Order dated 13/07/2023 application for project registration is rejected. |
06/09/2022 | 19/07/2023 |
167 | ACK/KA/RERA/1251/310/PR/080322/005756 | Rajiv Gandhi Housing Corporation Limited | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 13/07/2023 application for project registration is rejected. |
08/03/2022 | 19/07/2023 | |
168 | ACK/KA/RERA/1251/310/PR/190410/003210 | Italix Living Spaces Pvt Ltd | Ozone Chambers - Residential | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 13/07/2023 application for project registration is rejected. |
10/04/2019 | 19/07/2023 |
169 | ACK/KA/RERA/1268/378/PR/060922/006317 | SPOORTHi DEVELOPERS AND INFRASTRUCTURE | SPOORTHI PALACE VIEW | Mysore | MYSORE | As per the Hon'ble Authority Order dated 13/07/2023 application for project registration is rejected. |
06/09/2022 | 19/07/2023 |
170 | ACK/KA/RERA/1258/404/PR/160722/006149 | Remesh | Remesh | Davangere | DAVANGERE | As per Hon'ble Authority order dated: 13/07/2023 request for registration of the project has been rejected |
16/07/2022 | 19/07/2023 |
171 | ACK/KA/RERA/1251/446/PR/230722/006174 | Reddy Thirumala Reddy | THIRUMALAADHARI | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 05/07/2023 application for project registration is rejected. |
23/07/2022 | 18/07/2023 |
172 | ACK/KA/RERA/1257/333/PR/171122/006532 | MATHA DEVELOPERS PVT LTD | Matha Guru Residency | Udupi | UDUPI | As per the Hon'ble Authority Order dated 11/07/2023 application for project registration is rejected. |
17/11/2022 | 13/07/2023 |
173 | ACK/KA/RERA/1258/404/PR/291022/006469 | Ramakanth s v | Ramakanth | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 11/07/2023 application for project registration is rejected. |
29/10/2022 | 13/07/2023 |
174 | ACK/KA/RERA/1258/404/PR/120922/006341 | Ajaya kumar | sonu | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 11/07/2023 application for project registration is rejected. |
12/09/2022 | 13/07/2023 |
175 | ACK/KA/RERA/1268/381/PR/060922/006320 | Hyland properties | Nisarga paradise phase 1D | Mysore | HUNSUR | As per the Hon'ble Authority Order dated 11/07/2023 application for project registration is rejected. |
06/09/2022 | 13/07/2023 |
176 | ACK/KA/RERA/1258/409/PR/210622/006062 | SHIVAKUMAR K | Mayakonda layout | Davangere | JAGALUR | As per the Hon'ble Authority Order dated 05/07/2023 application for project registration is rejected. |
21/06/2022 | 13/07/2023 |
177 | ACK/KA/RERA/1251/310/PR/190410/003211 | Italix Living Spaces Pvt Ltd | Ozone Chambers - Commercial | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 22/06/2023 application for project registration is rejected. |
10/04/2019 | 13/07/2023 |
178 | ACK/KA/RERA/1258/404/PR/190822/006258 | Lingaraju | Lingaraju layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 22/06/2023 application for project registration is rejected. |
19/08/2022 | 06/07/2023 |
179 | ACK/KA/RERA/1268/378/PR/160722/006150 | SUMANREDDY P | PINNACLE GREEN | Mysore | MYSORE | As per the Hon'ble Authority Order dated 22/06/2023 application for project registration is rejected. |
16/07/2022 | 06/07/2023 |
180 | ACK/KA/RERA/1258/404/PR/010722/006096 | Chandrappa v | chandrappa layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 22/06/2023 application for project registration is rejected. |
01/07/2022 | 06/07/2023 |
181 | ACK/KA/RERA/1251/310/PR/300622/006092 | Housing Commissioner | Proposed Housing Scheme at sy no 206 | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 22/06/2023 application for project registration is rejected. |
30/06/2022 | 06/07/2023 |
182 | ACK/KA/RERA/1268/378/PR/240522/005986 | YASHODHARANI CONSTRUCTIONS | Siddarameshwara Prasanna Badavane | Mysore | MYSORE | As per the Hon'ble Authority Order dated 22/06/2023 application for project registration is rejected. |
24/05/2022 | 06/07/2023 |
183 | ACK/KA/RERA/1272/394/PR/260322/005808 | Chandan Naidu M | Chandan Enclave | Tumakuru | TUMKUR | As per the Hon'ble Authority Order dated 22/06/2023 application for project registration is rejected. |
26/03/2022 | 06/07/2023 |
184 | ACK/KA/RERA/1251/446/PR/151121/005461 | Ozone Elegant Developers Private Limited | OZONE ICON | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 22/06/2023 application for project registration is rejected. |
15/11/2021 | 06/07/2023 |
185 | ACK/KA/RERA/1271/486/PR/210622/005021 | NINGAPPA T D | NINGAPPA T D | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 22/06/2023 application for project registration is rejected. |
22/06/2021 | 06/07/2023 |
186 | ACK/KA/RERA/1251/308/PR/190822/003510 | SKR MEADOWS | SKR MEADOWS | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 22/06/2023 application for project registration is rejected. |
22/08/2019 | 06/07/2023 |
187 | ACK/KA/RERA/1250/303/PR/240222/005710 | OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED | Southend 3 | Bengaluru Rural | DEVANAHALLI | As per Hon'ble Authority order dated: 15/06/2023 request for registration of the project has been rejected |
24/02/2022 | 22/06/2023 |
188 | ACK/KA/RERA/1248/440/PR/210413/004917 | G KIRAN KUMAR | SHREE NANJUNDESHWARA BADAVANE | Ballari (Bellary) | HOSPET | As per Hon'ble Authority order dated:15/06/2023 request for registration of the project has been rejected |
13/04/2021 | 22/06/2023 |
189 | ACK/KA/RERA/1251/446/PR/181130/002860 | PRAVEEN MOHAN | Tirumala K Park Central | Bengaluru Urban | Bengaluru East | As per Hon'ble Authority order dated: 03/05/2023 request for registration of the project has been rejected |
30/11/2018 | 05/05/2023 |
190 | ACK/KA/RERA/1271/486/PR/240622/006077 | LAXMAN RAMESH | BHUVANESHWAR LAYOUT | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 28/04/2023 application for project registration is rejected. |
24/06/2022 | 04/05/2023 |
191 | ACK/KA/RERA/1258/404/PR/140622/006045 | SRINATH REDDY | SRINATH LAYOUT | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 28/04/2023 application for project registration is rejected. |
14/06/2022 | 04/05/2023 |
192 | ACK/KA/RERA/1258/405/PR/140622/006043 | sharsd k k | KK Layout | Davangere | HARIHAR | As per the Hon'ble Authority Order dated 28/04/2023 application for project registration is rejected. |
14/06/2022 | 04/05/2023 |
193 | ACK/KA/RERA/1269/385/PR/090622/006031 | S K NAGIREDDY | Jaya Nagar Extension Sy.No. 935/6 and 935/7 | Raichur | RAICHUR | As per the Hon'ble Authority Order dated 28/04/2023 application for project registration is rejected. |
09/06/2022 | 04/05/2023 |
194 | ACK/KA/RERA/1262/430/PR/230522/005979 | k Harsha Reddy | kHarsha r | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 28/04/2023 application for project registration is rejected. |
23/05/2022 | 04/05/2023 |
195 | ACK/KA/RERA/1262/430/PR/230522/005977 | Harsha Reddy | HarshaReddy | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 28/04/2023 application for project registration is rejected. |
23/05/2022 | 04/05/2023 |
196 | ACK/KA/RERA/1258/404/PR/190522/005963 | Channdrappa | Channdrappa | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 28/04/2023 application for project registration is rejected. |
19/05/2022 | 04/05/2023 |
197 | ACK/KA/RERA/1260/414/PR/130122/005589 | Muncipal Commissioner Gadag Betageri | construction of DU'S 229 HOUSING | Gadag | GADAG - BETIGERI | As per the Hon'ble Authority Order dated 29/04/2023 application for project registration is rejected. |
13/01/2022 | 04/05/2023 |
198 | ACK/KA/RERA/1257/334/PR/241121/005476 | BALAJI BUILDERS AND DEVELOPERS | karishma residency | Dakshina Kannada | MANGALORE | As per the Hon'ble Authority Order dated 28/04/2023 application for project registration is rejected. |
24/11/2021 | 04/05/2023 |
199 | ACK/KA/RERA/1248/441/PR/210824/005170 | K VIRUPANNA | NANDA GOKULA | Ballari (Bellary) | KAMPLI | As per the Hon'ble Authority Order dated 28/04/2023 application for project registration is rejected. |
24/08/2021 | 04/05/2023 |
200 | ACK/KA/RERA/1256/327/PR/210812/005149 | Bharath Builders and Developers | PREMIER LAYOUT PHASE 2 | Chitradurga | CHITRADURGA | As per Hon'ble Authority order dated: 28/04/2023 request for registration of the project has been rejected |
12/08/2021 | 04/05/2023 |
201 | ACK/KA/RERA/1251/310/PR/181003/002684 | ALI ASGER KAPASI | R MOUNT ROSE | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 11-04-2023 application for project registration is rejected. |
03/10/2018 | 20/04/2023 |
202 | PR/KN/180215/002699 | GSK Builders & Developers | Development of Residential sites | Bengaluru Rural | RAMANAGARA | As per the Hon'ble Authority Order dated 06/04/2023 application for project registration is rejected. |
15/02/2018 | 15/04/2023 |
203 | ACK/KA/RERA/1251/446/PR/181003/002688 | SAI MAHESHWARA COLONIZERS PRIVATE LIMITED | TRINAY RESIDENCY | Bengaluru Urban | Bengaluru East | As per Hon'ble Authority order dated: 10/04/2023 request for registration of the project has been rejected |
03/10/2018 | 12/04/2023 |
204 | TOR/ACK/KA/RERA/1251/472/PR/201019/004315 | Arvind SmartSpaces Limited | Arvind Bel Air | Bengaluru Urban | YELAHANKA | As per the Hon'ble Authority Order dated 23-03-2023 application for project registration is rejected. |
19/10/2020 | 06/04/2023 |
205 | ACK/KA/RERA/1251/310/PR/180626/002393 | Sharath Kumar Suresh | V Venture ESSENCE | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 23/03/2023 application for project registration is rejected. |
26/06/2018 | 27/03/2023 |
206 | ACK/KA/RERA/1259/410/PR/280522/005994 | SHREE DATTA BUILDERS | SHRI DATTA HEIGHTS RERA | Dharwad | DHARWAD | As per the Hon'ble Authority Order dated 20/03/2023 application for project registration is rejected. |
28/05/2022 | 24/03/2023 |
207 | PR/KN/180117/002667 | SIZZLE PROPERTIES DEVELOPER | SIZZLE NANDI VALLEY | Bengaluru Rural | DODDA BALLAPUR | As per the Hon'ble Authority Order dated 20/03/2023 application for project registration is rejected. |
17/01/2018 | 24/03/2023 |
208 | PR/KN/171120/002408 | SRIVEN PROPERTIES | SRIVEN RAG MERIDIEN | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 20/03/2023 application for project registration is rejected. |
20/11/2017 | 24/03/2023 |
209 | ACK/KA/RERA/1251/310/PR/210630/005044 | BUX RANKA DEVELOPERS PVT LTD | THE HUDSON | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 10/03/2023 application for project registration is rejected. |
30/06/2021 | 21/03/2023 |
210 | ACK/KA/RERA/1251/310/PR/100522/005934 | KANAKASHREE HOUSE BUILDING COOPERATIVE SOCIETY LIMITED | HEMMIGEPURA KANAKASHREE LAYOUT | Bengaluru Urban | Bengaluru South | As per Hon'ble Authority order dated: 23/02/2022 request for registration of the project has been rejected |
10/05/2022 | 07/03/2023 |
211 | ACK/KA/RERA/1251/310/PR/090522/005930 | KANAKASHREE HOUSE BUILDING COOPERATIVE SOCIETY LIMITED | GUDIMAVU KANAKASHREE LAYOUT | Bengaluru Urban | Bengaluru South | As per Hon'ble Authority order dated: 23/02/2022 request for registration of the project has been rejected |
09/05/2022 | 07/03/2023 |
212 | ACK/KA/RERA/1257/334/PR/180817/002555 | Alchemia Infra Realty | VEDA TOWERS | Dakshina Kannada | MANGALORE | As per Hon'ble Authority order dated: 16/02/2023 request for registration of the project has been rejected |
17/08/2018 | 07/03/2023 |
213 | ACK/KA/RERA/1251/310/PR/180730/002504 | SVR CONSTRUCTIONS | SVR OAK RIDGE | Bengaluru Urban | Bengaluru South | As per Hon'ble Authority order dated:16/02/2023 request for registration of the project has been rejected |
30/07/2018 | 07/03/2023 |
214 | ACK/KA/RERA/1251/310/PR/180406/002949 | SAI SRINIVASA BUILDERS & DEVELOPERS | SSB URBAN LOTUS | Bengaluru Urban | Bengaluru South | As per Hon'ble Authority order dated: 16/02/2023 request for registration of the project has been rejected |
06/04/2018 | 07/03/2023 |
215 | ACK/KA/RERA/1268/378/PR/251021/005371 | Smt B L Gayatri and Smt M R Sowmya | Sri Chamundeshwari Residential Layout | Mysore | MYSORE | Test project hence rejected |
25/10/2021 | 07/03/2023 |
216 | PR/KN/171107/002347 | LAND MARK BUILDERS | Sannidhi Encalve | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 27/12/2022 application for project registration is rejected. |
07/11/2017 | 16/01/2023 |
217 | ACK/KA/RERA/1249/447/PR/240522/005983 | vinay construction | VINAY PLAZA | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 29-12-2022 application for project registration is rejected. |
24/05/2022 | 12/01/2023 |
218 | ACK/KA/RERA/1251/446/PR/180524/002273 | Eternity Developers Private Limited | Skyline AURA | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 05-01-2023 application for project registration is rejected. |
24/05/2018 | 12/01/2023 |
219 | ACK/KA/RERA/1249/447/PR/171022/006450 | ANIL ANNASAHEB PATIL | SANAVI RESIDENCY | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
17/10/2022 | 09/01/2023 |
220 | ACK/KA/RERA/1257/334/PR/170622/006054 | SURAJ N ALVA | MARGARITA | Dakshina Kannada | MANGALORE | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
17/06/2022 | 09/01/2023 |
221 | ACK/KA/RERA/1268/378/PR/090622/006030 | Ratanraj Ventures LLP | Basaveshwara Enclave | Mysore | MYSORE | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
09/06/2022 | 09/01/2023 |
222 | ACK/KA/RERA/1256/327/PR/090622/006028 | VINAYAKA DEVELOPERS | VINAYAKA DEVELOPERS | Chitradurga | CHITRADURGA | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
09/06/2022 | 09/01/2023 |
223 | ACK/KA/RERA/1258/404/PR/030622/006010 | Suresha | Suresha layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
03/06/2022 | 09/01/2023 |
224 | ACK/KA/RERA/1258/404/PR/010622/006003 | Uday Shivakumar | Uday Shivakumar layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
01/06/2022 | 09/01/2023 |
225 | ACK/KA/RERA/1258/404/PR/010622/006002 | Uday Shivakumar | Uday Shivakumar layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
01/06/2022 | 09/01/2023 |
226 | ACK/KA/RERA/1251/446/PR/250522/005989 | ADITYA BUILDERS AND DEVELOPERS | ADITYA KAKS ROYAL HOMES | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
25/05/2022 | 09/01/2023 |
227 | ACK/KA/RERA/1251/446/PR/250522/005988 | Kallakunta Sahith | K RESIDENCY | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
25/05/2022 | 09/01/2023 |
228 | ACK/KA/RERA/1251/309/PR/220512/005944 | Karnataka Slum Development Board | Construction of 300 DU's at Byatrayanpura | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
12/05/2022 | 09/01/2023 |
229 | ACK/KA/RERA/1258/404/PR/070522/005918 | shivaraj A B | shivaraj | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
07/05/2022 | 09/01/2023 |
230 | ACK/KA/RERA/1249/447/PR/050522/005912 | A V VENTURES | ABHISHEK APARTMENT | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
05/05/2022 | 09/01/2023 |
231 | ACK/KA/RERA/1259/479/PR/020522/005902 | NARAYAN GOPALAKRISHNA ACHARYA | SUNCITY PARK-||| | Dharwad | HUBLI | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
02/05/2022 | 09/01/2023 |
232 | ACK/KA/RERA/1251/310/PR/280422/005894 | Sri Nanjundeshwara Developers | Sri Nanjundeshwara Residency RR-VIII | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
28/04/2022 | 09/01/2023 |
233 | ACK/KA/RERA/1256/327/PR/270422/005888 | Gnanesh S P | Sai layout | Chitradurga | CHITRADURGA | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
27/04/2022 | 09/01/2023 |
234 | ACK/KA/RERA/1258/404/PR/120422/005847 | Rohith T | Rohith | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
12/04/2022 | 09/01/2023 |
235 | ACK/KA/RERA/1258/404/PR/120422/005845 | Sanjay T | Sanjya | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
12/04/2022 | 09/01/2023 |
236 | ACK/KA/RERA/1258/404/PR/120422/005844 | thanoji rao | thanoji | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
12/04/2022 | 09/01/2023 |
237 | ACK/KA/RERA/1258/404/PR/120422/005843 | Ganesh | Ganesh | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
12/04/2022 | 09/01/2023 |
238 | ACK/KA/RERA/1258/409/PR/110422/005842 | Syed Ahmed | Syed Ahmed | Davangere | JAGALUR | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
11/04/2022 | 09/01/2023 |
239 | ACK/KA/RERA/1251/310/PR/110422/005839 | SRIVARI INFRA | GK GREEN GARDEN | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
11/04/2022 | 09/01/2023 |
240 | ACK/KA/RERA/1258/405/PR/080422/005836 | : M/s VIJAYA RAJ DEVELOPERS | Vijyaraj Developer | Davangere | HARIHAR | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
08/04/2022 | 09/01/2023 |
241 | ACK/KA/RERA/1258/404/PR/050422/005828 | Gangadharappa HC | Gangadharappa | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
05/04/2022 | 09/01/2023 |
242 | ACK/KA/RERA/1258/404/PR/050422/005827 | Sunandamma | Sunandamma | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
05/04/2022 | 09/01/2023 |
243 | ACK/KA/RERA/1258/404/PR/040422/005826 | M/s VIJAYA RAJ DEVELOPERS | VIJAYA RAJ DEVELOPERS | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
04/04/2022 | 09/01/2023 |
244 | ACK/KA/RERA/1271/486/PR/310322/005819 | ANITHA L | Anitha L | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
31/03/2022 | 09/01/2023 |
245 | ACK/KA/RERA/1268/378/PR/280322/005810 | Siddesh Enterprises | Sharada Layout | Mysore | MYSORE | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
28/03/2022 | 09/01/2023 |
246 | ACK/KA/RERA/1265/339/PR/250322/005806 | Oceanus Dwellings Pvt Ltd | Oceanus Blossom | Kolar | KOLAR | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
25/03/2022 | 09/01/2023 |
247 | ACK/KA/RERA/1268/378/PR/220322/005790 | Vidyadev Developers | VIDYADEV ENCLAVE | Mysore | MYSORE | As per the Hon'ble Authority Order dated 28/12/2022 application for project registration is rejected. |
22/03/2022 | 09/01/2023 |
248 | ACK/KA/RERA/1268/380/PR/160322/005781 | SLV CORP | SLV SHELTER- phase 1 | Mysore | NANJANGUD | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
16/03/2022 | 09/01/2023 |
249 | ACK/KA/RERA/1249/447/PR/160322/005780 | SMART CONSTRUCTIONS | SMART PARADISE RESIDENCY | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
16/03/2022 | 09/01/2023 |
250 | ACK/KA/RERA/1258/404/PR/090322/005768 | Rajanahalli s | Rajanahalli s layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
09/03/2022 | 09/01/2023 |
251 | ACK/KA/RERA/1271/291/PR/090322/005767 | Mrs VANAMALA | VANAMALAA | Shivamogga | BHADRAVATHI | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
09/03/2022 | 09/01/2023 |
252 | ACK/KA/RERA/1271/291/PR/090322/005765 | VANAMALA | VANAMALA | Shivamogga | BHADRAVATHI | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
09/03/2022 | 09/01/2023 |
253 | ACK/KA/RERA/1248/469/PR/230222/005706 | Prabhavathi K | Nisarga Medows | Ballari (Bellary) | BALLARI | As per the Hon'ble Authority Order dated 29/12/2022 application for project registration is rejected. |
23/02/2022 | 09/01/2023 |
254 | ACK/KA/RERA/1271/486/PR/270122/005623 | Spoorthi Construction | SAI SWASTHIK LAYOUT | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 28/12/2022 application for project registration is rejected. |
27/01/2022 | 09/01/2023 |
255 | ACK/KA/RERA/1257/333/PR/250122/005613 | IMAD Builders and Developers | IMAD COMPLEX | Dakshina Kannada | DAKSHINA KANNADA | As per the Hon'ble Authority Order dated 28/12/2022 application for project registration is rejected. |
25/01/2022 | 09/01/2023 |
256 | ACK/KA/RERA/1249/367/PR/250122/005611 | Chidanand Athani | Mahalaxmi layout 1 | Belagavi (Belgaum) | CHIKODI | As per the Hon'ble Authority Order dated 28/12/2022 application for project registration is rejected. |
25/01/2022 | 09/01/2023 |
257 | ACK/KA/RERA/1251/309/PR/101221/005518 | AFFINITY PROPERTIES | AFFINITY CALADIUM | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
10/12/2021 | 09/01/2023 |
258 | ACK/KA/RERA/1260/416/PR/211023/005339 | karanataka slum developement board | PMAY-HFA(U) | Gadag | MUNDARGI | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
23/10/2021 | 09/01/2023 |
259 | ACK/KA/RERA/1273/318/PR/210105/004492 | PRAFULLACHANDRA RAO U | PRATHEEK PRIME | Udupi | UDUPI | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
05/01/2021 | 09/01/2023 |
260 | ACK/KA/RERA/1268/378/PR/201226/004469 | MANOJ SHENOY M | mandeep elegance | Mysore | MYSORE | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
26/12/2020 | 09/01/2023 |
261 | ACK/KA/RERA/1251/308/PR/201001/004272 | M s TBC HOMES INFRA CROP | GRAND LA-CASA | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
01/10/2020 | 09/01/2023 |
262 | ACK/KA/RERA/1273/318/PR/200816/004181 | PRAPHULLACHANDRA RAO | PRATHEEK PRIME | Udupi | UDUPI | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
16/08/2020 | 09/01/2023 |
263 | ACK/KA/RERA/1250/303/PR/200808/004172 | Lakepoint Builders Private Limited | Devanahalli Plots Phase 1 | Bengaluru Rural | DEVANAHALLI | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
08/08/2020 | 09/01/2023 |
264 | ACK/KA/RERA/1251/310/PR/190808/003486 | DS MAX PROPERTIES PRIVATE LIMITED | DS MAX SILVIA | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
08/08/2019 | 09/01/2023 |
265 | ACK/KA/RERA/1259/479/PR/190606/003345 | SHRIDATTA INFRATECH PVT LTD | SHRIDATTA RESIDENTIAL APPARTMENT | Dharwad | HUBLI | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
06/06/2019 | 09/01/2023 |
266 | ACK/KA/RERA/1251/309/PR/190430/003256 | BALAJI BUILDERS | BALAJI PRAGHATHI | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
30/04/2019 | 09/01/2023 |
267 | ACK/KA/RERA/1251/308/PR/190302/003091 | Nandakishor B N | Navanidhi Township C Block | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
02/03/2019 | 09/01/2023 |
268 | ACK/KA/RERA/1257/334/PR/190115/002959 | SPACE | NORTHERNSKY PALM STREAK "(LAND OWNER SHARE)" | Dakshina Kannada | MANGALORE | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
15/01/2019 | 09/01/2023 |
269 | ACK/KA/RERA/1251/446/PR/190114/002958 | VIKYATH INFRA | VIKYATH ROYAL | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
14/01/2019 | 09/01/2023 |
270 | ACK/KA/RERA/1275/448/PR/190301/003085 | SVAMITVA INFRA PVT LTD | Skye Tower | Vijayapura | Bijapur | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
01/03/2019 | 09/01/2023 |
271 | ACK/KA/RERA/1251/309/PR/180806/002524 | Skyline Developers | Skyline Acacia | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 21/12/2022 application for project registration is rejected. |
06/08/2018 | 09/01/2023 |
272 | ACK/KA/RERA/1273/318/PR/180531/002288 | RANJAN K | ADITI ARADHYA | Udupi | UDUPI | As per Hon'ble Authority order dated: 22/12/2022 request for registration of project has been rejected |
31/05/2018 | 09/01/2023 |
273 | PR/KN/180301/002810 | Right Properties Inc | Right Sankalpa | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 22/12/2022 application for project registration is rejected. |
01/03/2018 | 05/01/2023 |
274 | ACK/KA/RERA/1271/486/PR/210122/004536 | SARASWATHI | T N S LAYOUT | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 22-12-2022 application for project registration is rejected. |
22/01/2021 | 31/12/2022 |
275 | ACK/KA/RERA/1258/404/PR/120422/005846 | Latha T | LATHA | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
12/04/2022 | 27/12/2022 |
276 | ACK/KA/RERA/1258/404/PR/300322/005817 | Satish g s | Satish | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
30/03/2022 | 27/12/2022 |
277 | ACK/KA/RERA/1271/291/PR/080322/005764 | SHIVA KUMAR B K | SHIVA KUMAR B K | Shivamogga | BHADRAVATHI | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
08/03/2022 | 27/12/2022 |
278 | ACK/KA/RERA/1271/291/PR/080322/005763 | SHIVA KUMAR B K | B K SHIVAKUMAR | Shivamogga | BHADRAVATHI | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
08/03/2022 | 27/12/2022 |
279 | ACK/KA/RERA/1271/291/PR/080322/005761 | DINESH KUMAR B V | DINESH KUMAR B V | Shivamogga | BHADRAVATHI | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
08/03/2022 | 27/12/2022 |
280 | ACK/KA/RERA/1271/291/PR/080322/005760 | JAGANATH K | JAGANATH K | Shivamogga | BHADRAVATHI | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
08/03/2022 | 27/12/2022 |
281 | ACK/KA/RERA/1268/378/PR/280222/005722 | S M ASSOCIATES | BHAVANI ENCLAVE | Mysore | MYSORE | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
28/02/2022 | 27/12/2022 |
282 | ACK/KA/RERA/1258/404/PR/081221/005513 | B sunil | B sunil layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
08/12/2021 | 27/12/2022 |
283 | ACK/KA/RERA/1258/404/PR/301121/005489 | Bharathi NS | Bharathi NS | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
30/11/2021 | 27/12/2022 |
284 | ACK/KA/RERA/1263/419/PR/211021/005323 | FAZAL MOHAMMED KHAN | SRK GARDEN | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
21/10/2021 | 27/12/2022 |
285 | ACK/KA/RERA/1271/486/PR/210302/004758 | Rudresh J R | Rudresh J R and Jyothi A V | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 19-12-2022 application for project registration is rejected. |
02/03/2021 | 27/12/2022 |
286 | ACK/KA/RERA/1268/378/PR/210224/004734 | Rai Estates | Golden Palms | Mysore | MYSORE | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
24/02/2021 | 27/12/2022 |
287 | ACK/KA/RERA/1263/419/PR/210223/004729 | Mallikarjun Ganga | Ganga Layout at Bhosga,Kalaburagi | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
23/02/2021 | 27/12/2022 |
288 | ACK/KA/RERA/1255/325/PR/210223/004728 | D Shivaprakash | Bharathi Shankara | Chikkamagaluru | SRINGERI | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
23/02/2021 | 27/12/2022 |
289 | ACK/KA/RERA/1268/378/PR/210217/004682 | Allanahally House Building Cooperative Society | Shimsha Layout | Mysore | MYSORE | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
17/02/2021 | 27/12/2022 |
290 | ACK/KA/RERA/1268/378/PR/201230/004475 | Sree Gurukrupa Groups | Prakash Enclave | Mysore | MYSORE | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
30/12/2020 | 27/12/2022 |
291 | ACK/KA/RERA/1259/479/PR/200730/004156 | GEOMAC DEVELOPERS | GEOMAC TWIN PARK | Dharwad | HUBLI | As per the Hon'ble Authority Order dated 16-12-2022 application for project registration is rejected. |
30/07/2020 | 27/12/2022 |
292 | ACK/KA/RERA/1251/446/PR/181012/002714 | M/S G R CONSTRUCTIONS | gr parkview residency | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 19/12/2022 application for project registration is rejected. |
12/10/2018 | 27/12/2022 |
293 | ACK/KA/RERA/1275/448/PR/220507/005924 | KARNATAKA SLUM DEVELOPMENT BOARD | Construction 1285 Houses at Vijayapura city PMAY | Vijayapura | Bijapur | As per the Hon'ble Authority Order dated 09/12/2022 application for project registration is rejected. |
07/05/2022 | 19/12/2022 |
294 | ACK/KA/RERA/1266/393/PR/220507/005922 | Karanataka Slum Developement board | CONSTRUCTION OF 715 (G F) HOUSES at KUSTAGI TOWN | Koppal | KUSHTAGI | As per the Hon'ble Authority Order dated 09/12/2022 application for project registration is rejected. |
07/05/2022 | 19/12/2022 |
295 | ACK/KA/RERA/1248/469/PR/020322/005726 | Shivashankarappa K H | Sites & Service Scheme at Ballari | Ballari (Bellary) | BALLARI | As per the Hon'ble Authority Order dated 09/12/2022 application for project registration is rejected. |
02/03/2022 | 19/12/2022 |
296 | ACK/KA/RERA/1270/305/PR/120122/005583 | Commissioner | single unit houses at kanakpura | Ramanagara | KANAKAPURA | As per the Hon'ble Authority Order dated 09/12/2022 application for project registration is rejected. |
12/01/2022 | 19/12/2022 |
297 | ACK/KA/RERA/1259/479/PR/121221/005532 | SHIVA SHAKTI CONSTRUCTIONS | SHIVA SHAKTI HEIGHTS | Dharwad | HUBLI | As per the Hon'ble Authority Order dated 09/12/2022 application for project registration is rejected. |
12/12/2021 | 19/12/2022 |
298 | ACK/KA/RERA/1248/442/PR/210311/004805 | LAKSHMI DEVELOPERS | LakshmiNarasimha Nagara | Ballari (Bellary) | HOOVINA HADAGALLI | As per the Hon'ble Authority Order dated 07/11/2022 application for project registration is rejected. |
11/03/2021 | 19/12/2022 |
299 | ACK/KA/RERA/1260/481/PR/210120/004525 | Karnatak Slum Development Board | PMAY-HFA | Gadag | LAKSHMESHWAR | As per the Hon'ble Authority Order dated 06/05/2022 application for project registration is rejected. |
20/01/2021 | 19/12/2022 |
300 | ACK/KA/RERA/1249/447/PR/191227/003782 | Dayyar Infra Build Private Limited | Silver Line | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 09/12/2022 application for project registration is rejected. |
27/12/2019 | 19/12/2022 |
301 | ACK/KA/RERA/1251/309/PR/190803/003480 | Fortune Developers | Landmark Dreamz | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 20/01/2022 application for project registration is rejected. |
03/08/2019 | 19/12/2022 |
302 | ACK/KA/RERA/1250/303/PR/181213/002898 | Bhoomi Developers | Bhoomi Merusri Satyavan | Bengaluru Rural | DEVANAHALLI | As per the Hon'ble Authority Order dated 09/12/2022 application for project registration is rejected. |
13/12/2018 | 19/12/2022 |
303 | ACK/KA/RERA/1251/446/PR/181128/002857 | M/s.MK Developers | MK Maruthi Residency | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 09/12/2022 application for project registration is rejected. |
28/11/2018 | 19/12/2022 |
304 | ACK/KA/RERA/1251/446/PR/180927/002671 | SVR INFRA | SV SQUARE | Bengaluru Urban | Bengaluru East | AS PER THE HON'BLE AUTHORITY ORDER DATED 09/12/2022 APPLICATION FOR PROJECT REGISTRATION IS REJECTED. |
27/09/2018 | 19/12/2022 |
305 | ACK/KA/RERA/1271/294/PR/170222/005685 | SPOORTHI CONSTRUCTIONS | SRI SAI LAYOUT | Shivamogga | THIRTHAHALLI | As per the Hon'ble Authority Order dated 27/07/2022 application for project registration is rejected. |
17/02/2022 | 08/08/2022 |
306 | ACK/KA/RERA/1271/486/PR/181115/002808 | ESHWARAPPA | ESHWARAPPA | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 06-07-2022 application for project registration is rejected. |
15/11/2018 | 19/07/2022 |
307 | ACK/KA/RERA/1258/404/PR/210827/005191 | Veeranna B | BUDIHAL ROAD LAYOUT | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 06-07-2022 application for project registration is rejected. |
27/08/2021 | 12/07/2022 |
308 | ACK/KA/RERA/1251/446/PR/210720/005091 | Prathika Builders and developers | SIDHARTHA ENCLAVE | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 07/06/2022 application for project registration is rejected. |
20/07/2021 | 12/07/2022 |
309 | ACK/KA/RERA/1258/404/PR/190222/005694 | Bishwajith vt | shiramagondanahalli LAYOUT | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 18-06-2022 application for project registration is rejected. |
19/02/2022 | 30/06/2022 |
310 | ACK/KA/RERA/1258/404/PR/050222/005649 | Varalingappa KR | Kundavada road layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 18-06-2022 application for project registration is rejected. |
05/02/2022 | 30/06/2022 |
311 | ACK/KA/RERA/1261/315/PR/210316/004819 | M L Lokesh | Vaibhav Layout | Hassan | ALUR | As per the Hon'ble Authority Order dated 30-05-2022 application for project registration is rejected. |
16/03/2021 | 30/06/2022 |
312 | ACK/KA/RERA/1251/308/PR/190222/005692 | SRINIVASA CONSTRUCTIONS | SRINIS URBANE | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 26-05-2022 application for project registration is rejected. |
19/02/2022 | 22/06/2022 |
313 | ACK/KA/RERA/1251/308/PR/021221/005497 | Aban Developers Private Limited | Aban Desire | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 26-05-2022 application for project registration is rejected. |
02/12/2021 | 22/06/2022 |
314 | ACK/KA/RERA/1251/309/PR/210215/004680 | Pradeep krishnappa | BLUEJAY ARDLEY - III | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 26-05-2022 application for project registration is rejected. |
15/02/2021 | 22/06/2022 |
315 | ACK/KA/RERA/1249/367/PR/270122/005624 | Ashok Nandani | Mahalaxmi layout 2 | Belagavi (Belgaum) | CHIKODI | As per the Hon'ble Authority Order dated 09/06/2022 application for project registration is rejected. |
27/01/2022 | 15/06/2022 |
316 | ACK/KA/RERA/1268/378/PR/040122/005568 | satish b p | Suvarna Annex | Mysore | MYSORE | As per the Hon'ble Authority Order dated 09/06/2022 application for project registration is rejected. |
04/01/2022 | 15/06/2022 |
317 | ACK/KA/RERA/1263/419/PR/301221/005563 | RAJESH M KADECHUR | LAXMI SHREE TOWNSHIP | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 09/06/2022 application for project registration is rejected. |
30/12/2021 | 15/06/2022 |
318 | ACK/KA/RERA/1258/405/PR/291121/005487 | Basavaraj b n | Harihar layout | Davangere | HARIHAR | As per the Hon'ble Authority Order dated 09/06/2022 application for project registration is rejected. |
29/11/2021 | 15/06/2022 |
319 | ACK/KA/RERA/1251/446/PR/210218/004689 | jp builders | JP ALFA | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 09/06/2022 application for project registration is rejected. |
18/02/2021 | 15/06/2022 |
320 | ACK/KA/RERA/1251/309/PR/210208/004651 | BHUMIKA NORTH CITY | BHUMIKA NORTH CITY | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 09/06/2022 application for project registration is rejected. |
08/02/2021 | 15/06/2022 |
321 | ACK/KA/RERA/1251/446/PR/210125/004543 | N GOPINATH AND MANJUNATH G M | ADVAITH ELANZA | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 09/06/2022 application for project registration is rejected. |
25/01/2021 | 15/06/2022 |
322 | ACK/KA/RERA/1271/486/PR/210117/004517 | Abdul wahid pasha | ABDUL WAHID PASHA | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 09/06/2022 application for project registration is rejected. |
17/01/2021 | 15/06/2022 |
323 | ACK/KA/RERA/1258/404/PR/120122/005580 | Brahmananda reddy D | Brahmananda Layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 31/05/2022 application for project registration is rejected. |
12/01/2022 | 07/06/2022 |
324 | ACK/KA/RERA/1251/472/PR/100122/005575 | SRNR CONSTRUCTIONS LLP | SRNR DAFFODIL | Bengaluru Urban | YELAHANKA | As per the Hon'ble Authority Order dated 31/05/2022 application for project registration is rejected. |
10/01/2022 | 07/06/2022 |
325 | ACK/KA/RERA/1251/308/PR/040122/005569 | Ms ARS INFRAA | ARS GOLDSHIRE | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 31/05/2022 application for project registration is rejected. |
04/01/2022 | 07/06/2022 |
326 | ACK/KA/RERA/1268/378/PR/210904/005216 | GRAVITY ONE LIVING SPACE PVT LTD | SANVI-PHASE-III | Mysore | MYSORE | As per the Hon'ble Authority Order dated 31/05/2022 application for project registration is rejected. |
04/09/2021 | 07/06/2022 |
327 | ACK/KA/RERA/1259/479/PR/210830/005201 | VIKAS PAWAR | THE EKAAKSHARA APARTMENTS | Dharwad | HUBLI | As per the Hon'ble Authority Order dated 31/05/2022 application for project registration is rejected. |
30/08/2021 | 07/06/2022 |
328 | ACK/KA/RERA/1254/460/PR/210827/005190 | Concorde Sylvan View | Concorde Hill Crest Phase II | Chikballapur | Chikkaballapur | As per the Hon'ble Authority Order dated 31/05/2022 application for project registration is rejected. |
27/08/2021 | 07/06/2022 |
329 | ACK/KA/RERA/1262/432/PR/210518/004981 | Maqboolahmedkhan Pathan | PATHAN RESIDENCY | Haveri | HANGEL | As per the Hon'ble Authority Order dated 31/05/2022 application for project registration is rejected. |
18/05/2021 | 07/06/2022 |
330 | ACK/KA/RERA/1271/486/PR/210302/004759 | K Lavanya Latha | K Lavanya Latha | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 31/05/2022 application for project registration is rejected. |
02/03/2021 | 07/06/2022 |
331 | ACK/KA/RERA/1255/326/PR/210101/004482 | T R NAGARAJA | H M O S LAYOUT 1 ST PHASE | Chikkamagaluru | TARIKERE | As per the Hon'ble Authority Order dated 31/05/2022 application for project registration is rejected. |
01/01/2021 | 07/06/2022 |
332 | ACK/KA/RERA/1262/430/PR/200827/004204 | Prakash Ramappa Jadamali | Jadamali Layout | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 31/05/2022 application for project registration is rejected. |
27/08/2020 | 07/06/2022 |
333 | ACK/KA/RERA/1251/446/PR/211221/005548 | Highrise Developers | HIGHRISE FORT | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 14-03-2022 application for project registration is rejected. |
21/12/2021 | 10/05/2022 |
334 | ACK/KA/RERA/1251/446/PR/211013/005322 | VENUS VENTURES | VENUS PRIDE | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 14-03-2022 application for project registration is rejected. |
13/10/2021 | 10/05/2022 |
335 | ACK/KA/RERA/1251/446/PR/210521/004986 | RAGHUNANDAN G | SDS EDEN | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 08-04-2022 application for project registration is rejected. |
21/05/2021 | 10/05/2022 |
336 | ACK/KA/RERA/1249/447/PR/210623/005023 | SOCH CONSTRUCTION | ROSHAN RESIDENCY | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 08-04-2022 application for project registration is rejected. |
23/06/2021 | 25/04/2022 |
337 | ACK/KA/RERA/1250/307/PR/210406/004898 | VAISHNAVI DEVELOPERS | SRI.VAISHANAVI ENCLAVE | Bengaluru Rural | NELAMANGALA | As per the Hon'ble Authority Order dated 08-04-2022 application for project registration is rejected. |
06/04/2021 | 25/04/2022 |
338 | ACK/KA/RERA/1251/446/PR/211008/005312 | SRI BAHARATH DEVELOPERS | SBD's PARADISE | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 08-04-2022 application for project registration is rejected. |
08/10/2021 | 11/04/2022 |
339 | ACK/KA/RERA/1268/378/PR/210728/005102 | Govinda J | J J Properties | Mysore | MYSORE | As per the Hon'ble Authority Order dated 08-04-2022 application for project registration is rejected. |
28/07/2021 | 11/04/2022 |
340 | ACK/KA/RERA/1251/308/PR/210807/005130 | REDDY STRUCTURES PRIVATE LIMITED | Mahaveer Palatium Sy No 28/1 | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 05-03-2022application for project registration is rejected. |
07/08/2021 | 15/03/2022 |
341 | ACK/KA/RERA/1259/479/PR/221121/005474 | SHRI DURGA DEVELOPERS AND PROMOTERS | JHANVI ROYAL ENCLAVE | Dharwad | HUBLI | As per the Hon'ble Authority Order dated 16-02-2022 application for project registration is rejected. |
22/11/2021 | 02/03/2022 |
342 | ACK/KA/RERA/1267/374/PR/210308/004790 | Raja Datta | Raja Prime Garden Phase-2 | Mandya | SHRIRANGAPATTNA | As per the Hon'ble Authority Order dated 03-02-2022 application for project registration is rejected. |
08/03/2021 | 02/03/2022 |
343 | ACK/KA/RERA/1262/430/PR/200625/004103 | Gajarajgouda Patil | Patil Layout | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 11-02-2022 application for project registration is rejected. |
25/06/2020 | 02/03/2022 |
344 | ACK/KA/RERA/1251/446/PR/190103/002944 | DINESH D RANKA | MIRABILIS (LAND OWNER SHARE) | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 11-02-2022 application for project registration is rejected. |
03/01/2019 | 02/03/2022 |
345 | ACK/KA/RERA/1268/378/PR/251121/005479 | B T BHASKAR | NA | Mysore | MYSORE | After FNH two more opportunities are given to the applicant, but compliance is not made. Hence REJECTED |
25/11/2021 | 28/02/2022 |
346 | ACK/KA/RERA/1259/479/PR/210825/005178 | Neelgund Developers and Builders Pvt Ltd | NEELGUND EKTA 7 | Dharwad | HUBLI | As per the Hon'ble Authority Order dated 20-01-2022 application for project registration is rejected. |
25/08/2021 | 21/02/2022 |
347 | ACK/KA/RERA/1250/303/PR/190906/003540 | VIVAAN PROPERTIES INDIA PRIVATE LTD | Urbana Bliss | Bengaluru Rural | DEVANAHALLI | As per the Hon'ble Authority Order dated 11-02-2022 application for project registration is rejected. |
06/09/2019 | 21/02/2022 |
348 | ACK/KA/RERA/1257/334/PR/190307/003105 | SHETTY BUILDERS AND DEVELOPERS | ONELLA COMMERCIAL PREMISES | Dakshina Kannada | MANGALORE | As per the Hon'ble Authority Order dated 31-01-2022 application for project registration is rejected. |
07/03/2019 | 21/02/2022 |
349 | ACK/KA/RERA/1251/308/PR/190228/003082 | H.P.Rama Reddy and A.Rama Reddy | Reliaable Dollar Collony 'Phase 1 Extension' | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 11-02-2022 application for project registration is rejected. |
28/02/2019 | 21/02/2022 |
350 | ACK/KA/RERA/1251/310/PR/181005/002699 | K V SRINIVASULU | TAMARA PREMIUM RESIDENTIAL LAYOUT | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 31-01-2022 application for project registration is rejected. |
05/10/2018 | 21/02/2022 |
351 | ACK/KA/RERA/1251/446/PR/180827/002577 | ECSTASY PROJECTS PVT LTD | Trifecta- FAIT POUR | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 11-02-2022 application for project registration is rejected. |
27/08/2018 | 21/02/2022 |
352 | ACK/KA/RERA/1257/334/PR/111121/005456 | ANIL KUMAR SHET S | BEETLE SANVI | Dakshina Kannada | MANGALORE | As per the Hon'ble Authority Order dated 19-01-2022 application for project registration is rejected. |
11/11/2021 | 07/02/2022 |
353 | ACK/KA/RERA/1258/404/PR/281021/005442 | Dinesh | nagesh shet | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 20-01-2022 application for project registration is rejected. |
28/10/2021 | 07/02/2022 |
354 | ACK/KA/RERA/1251/472/PR/231021/005329 | Dharani Promoters and Builders | Dharani Greens | Bengaluru Urban | YELAHANKA | As per the Hon'ble Authority Order dated 19-01-2022 application for project registration is rejected. |
23/10/2021 | 07/02/2022 |
355 | ACK/KA/RERA/1249/367/PR/211012/005319 | LAXMAN SATYAPPA MALI | LAXMAN MALI LAYOUT | Belagavi (Belgaum) | CHIKODI | As per the Hon'ble Authority Order dated 20-01-2022 application for project registration is rejected. |
12/10/2021 | 07/02/2022 |
356 | ACK/KA/RERA/1258/404/PR/211011/005317 | AJJAPPA B | AJJAPPA B | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 20-02-2022 application for project registration is rejected. |
11/10/2021 | 07/02/2022 |
357 | ACK/KA/RERA/1268/378/PR/211010/005316 | H N Urmeela | VENKATAGIRI SPRING HERITAGE | Mysore | MYSORE | As per the Hon'ble Authority Order dated 20-01-2022 application for project registration is rejected. |
10/10/2021 | 07/02/2022 |
358 | ACK/KA/RERA/1268/378/PR/211007/005308 | M P Ravi Shankar and M P Sandhya Rani | Aishwarya Paradise Enclave | Mysore | MYSORE | As per the Hon'ble Authority Order dated 20-01-2022 application for project registration is rejected. |
07/10/2021 | 07/02/2022 |
359 | ACK/KA/RERA/1259/410/PR/211005/005307 | Sagar Parvathi | Delight Dreams | Dharwad | DHARWAD | As per the Hon'ble Authority Order dated 20-01-2022 application for project registration is rejected. |
05/10/2021 | 07/02/2022 |
360 | ACK/KA/RERA/1251/309/PR/211004/005306 | K SQURE PROPERTIES PRIVATE LIMITED | K SQURE REGIUM | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 19-01-2022 application for project registration is rejected. |
04/10/2021 | 07/02/2022 |
361 | ACK/KA/RERA/1258/404/PR/211001/005296 | HARSHA DEVELOPERS | HARSHA DEVELOPERS | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 20-01-2022 application for project registration is rejected. |
01/10/2021 | 07/02/2022 |
362 | ACK/KA/RERA/1262/430/PR/200623/004098 | LIYAKHATHALI KHATIB | KHATIB LAYOUT | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 20-01-2022 application for project registration is rejected. |
23/06/2020 | 07/02/2022 |
363 | ACK/KA/RERA/1262/430/PR/200615/004071 | Shriram Tandi | TANDI LAYOUT | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 20-01-2022 application for project registration is rejected. |
15/06/2020 | 07/02/2022 |
364 | ACK/KA/RERA/1256/327/PR/190302/003093 | gnanesha.s.p | malaiah bhadavane | Chitradurga | CHITRADURGA | As per the Hon'ble Authority Order dated 20-01-2022 application for project registration is rejected. |
02/03/2019 | 07/02/2022 |
365 | ACK/KA/RERA/1251/308/PR/210825/005180 | RD Buildtech and Developers Karnataka Private Limited | RELIAABLE E-CITY | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 21-12-2021 application for project registration is rejected. |
25/08/2021 | 01/02/2022 |
366 | ACK/KA/RERA/1258/404/PR/210824/005167 | kiran g m | Mahalakshmi layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 16-12-2021 application for project registration is rejected. |
24/08/2021 | 01/02/2022 |
367 | ACK/KA/RERA/1258/404/PR/210811/005147 | nagabhushana ss | Shiva parvathi1 s layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 21-12-2021 application for project registration is rejected. |
11/08/2021 | 01/02/2022 |
368 | ACK/KA/RERA/1262/432/PR/210803/005120 | Ravi Kalal | Development of land Extent S.no 307A/1B3 | Haveri | HANGEL | As per the Hon'ble Authority Order dated 21-12-2021 application for project registration is rejected. |
03/08/2021 | 01/02/2022 |
369 | ACK/KA/RERA/1259/479/PR/210802/005113 | SHREYALAXMI PROPERTIES | SHREYA COLONY | Dharwad | HUBLI | As per the Hon'ble Authority Order dated 21-12-2021 application for project registration is rejected. |
02/08/2021 | 01/02/2022 |
370 | ACK/KA/RERA/1251/310/PR/210716/005080 | Pelagsus Infrastructures Private Limited | Hamilton Tower | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 21-12-2021 application for project registration is rejected. |
16/07/2021 | 01/02/2022 |
371 | ACK/KA/RERA/1265/339/PR/190611/003352 | BALAJI MADHAVASHETTY | VVS ROSE GARDENS PHASE IV | Kolar | KOLAR | As per the Hon'ble Authority Order dated 16-12-2021 application for project registration is rejected. |
11/06/2019 | 01/02/2022 |
372 | ACK/KA/RERA/1249/367/PR/211001/005299 | Silverline Developers | Silver Nest | Belagavi (Belgaum) | CHIKODI | As per the Hon'ble Authority Order dated 24-01-2022 application for project registration is rejected. |
01/10/2021 | 29/01/2022 |
373 | ACK/KA/RERA/1251/310/PR/210923/005269 | Engineers Associates Private Limited | SRI TIRUMALA ELITE | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 28-12-2021 application for project registration is rejected. |
23/09/2021 | 29/01/2022 |
374 | ACK/KA/RERA/1258/404/PR/210917/005246 | RAJU K H | RAJU karur layout | Davangere | DAVANGERE | As per the Hon'ble Authority Order dated 24-01-2022 application for project registration is rejected. |
17/09/2021 | 29/01/2022 |
375 | ACK/KA/RERA/1268/378/PR/210904/005212 | BELLEVANA LAYOUT | BELLIVANA LAYOUT | Mysore | MYSORE | As per the Hon'ble Authority Order dated 24-01-2022 application for project registration is rejected. |
04/09/2021 | 29/01/2022 |
376 | ACK/KA/RERA/1274/351/PR/210827/005192 | KESHAVA KRUPA | THE SOLITAIRE | Uttara Kannada | KARWAR | As per the Hon'ble Authority Order dated 28-12-2021 application for project registration is rejected. |
27/08/2021 | 29/01/2022 |
377 | ACK/KA/RERA/1273/318/PR/210825/005179 | Ganesh Devadiga | Lakshmi Residency | Udupi | UDUPI | As per the Hon'ble Authority Order dated 24-01-2022 application for project registration is rejected. |
25/08/2021 | 29/01/2022 |
378 | ACK/KA/RERA/1248/441/PR/210825/005177 | RENUKARAJA C H | GOKULA LAYOUT | Ballari (Bellary) | KAMPLI | As per the Hon'ble Authority Order dated 24-01-2022 application for project registration is rejected. |
25/08/2021 | 29/01/2022 |
379 | ACK/KA/RERA/1262/430/PR/200826/004200 | H D NAGARAJ | HADAGALI LAYOUT | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 24-01-2022 application for project registration is rejected. |
26/08/2020 | 29/01/2022 |
380 | ACK/KA/RERA/1251/446/PR/200807/004169 | R GANGADHAR | SAI SILICON CITY | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 24-01-2022 application for project registration is rejected. |
07/08/2020 | 29/01/2022 |
381 | ACK/KA/RERA/1249/367/PR/200611/004057 | Chidanand Basaprabhu Kore Sahakari Sakkare Karkane Niyamit Chikkodi | Ankali Layout | Belagavi (Belgaum) | CHIKODI | As per the Hon'ble Authority Order dated 24-01-2022 application for project registration is rejected. |
11/06/2020 | 29/01/2022 |
382 | ACK/KA/RERA/1251/446/PR/200608/004043 | delhi prasad | PRATHIKA ENCLAVE | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 24-01-2022 application for project registration is rejected. |
08/06/2020 | 29/01/2022 |
383 | ACK/KA/RERA/1254/460/PR/190124/002991 | PRAGNA HOLDINGS | The Highway | Chikballapur | Chikkaballapur | As per the Hon'ble Authority Order dated 22-10-2021 application for project registration is rejected. |
24/01/2019 | 04/01/2022 |
384 | ACK/KA/RERA/1271/486/PR/200924/004251 | P V VISHWANATH | NAGARAJ LAYOUT | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 17-11-2021, application for project registration is rejected. |
24/09/2020 | 13/12/2021 |
385 | ACK/KA/RERA/1251/446/PR/200918/004242 | SVL BUILDERS AND DEVELOPERS | SVL IESHTA | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 02-12-2021, application for project registration is rejected. |
18/09/2020 | 13/12/2021 |
386 | ACK/KA/RERA/1262/430/PR/200825/004197 | NEELAVVA SIDDAPPA TAHASHILDAR | Tahashildar Layout | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 02-12-2021, application for project registration is rejected. |
25/08/2020 | 13/12/2021 |
387 | ACK/KA/RERA/1262/430/PR/200825/004196 | Girisha R Majjagi | Majjagi Layout | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 02-12-2021, application for project registration is rejected. |
25/08/2020 | 13/12/2021 |
388 | ACK/KA/RERA/1251/446/PR/200818/004185 | RAMESH PILLAPPA | DESIRE TREE | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 02-12-2021, application for project registration is rejected. |
18/08/2020 | 13/12/2021 |
389 | ACK/KA/RERA/1270/302/PR/200814/004180 | Universal Developers | Valley Wood Annex | Ramanagara | RAMANAGARA | As per the Hon'ble Authority Order dated 02-12-2021, application for project registration is rejected. |
14/08/2020 | 13/12/2021 |
390 | ACK/KA/RERA/1251/446/PR/200807/004167 | JD BLOSSOMS | JD BLOSSOM | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 02-12-2021, application for project registration is rejected. |
07/08/2020 | 13/12/2021 |
391 | ACK/KA/RERA/1271/486/PR/200720/004139 | MURUDAPPA ESHWARAPPA | ESHWARAPPA BADAVANE | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 02-12-2021, application for project registration is rejected. |
20/07/2020 | 13/12/2021 |
392 | ACK/KA/RERA/1259/479/PR/200710/004121 | SKYTOWN BUILDERS AND DEVELOPERS | SKYTOWN GARCIA | Dharwad | HUBLI | As per the Hon'ble Authority Order dated 02-12-2021, application for project registration is rejected. |
10/07/2020 | 13/12/2021 |
393 | ACK/KA/RERA/1271/486/PR/200629/004107 | S V Mahendra | SIDDARAMESHWARA LAYOUT | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 02-12-2021, application for project registration is rejected. |
29/06/2020 | 13/12/2021 |
394 | ACK/KA/RERA/1249/447/PR/200622/004089 | Global City Land Developers & Builders | Adinath Arcade | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 02-12-2021, application for project registration is rejected. |
22/06/2020 | 13/12/2021 |
395 | ACK/KA/RERA/1273/318/PR/190521/003303 | B Madhusudhan Acharya | Sri Vidya Palace | Udupi | UDUPI | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
21/05/2019 | 13/12/2021 |
396 | ACK/KA/RERA/1251/472/PR/190305/003099 | K M Srinivasa Murthy | Adithya's Kings Court | Bengaluru Urban | YELAHANKA | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
05/03/2019 | 13/12/2021 |
397 | ACK/KA/RERA/1247/297/PR/210714/005075 | Veeresh Chowkimath | Shree Basaveshwara Layout | Bagalkot | BADAMI | As per the Hon'ble Authority Order dated 16-11-2021, application for project registration is rejected. |
14/07/2021 | 03/12/2021 |
398 | ACK/KA/RERA/1262/430/PR/200923/004250 | Basavaraj Nandihalli | Nandihalli Layout | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 17-11-2021, application for project registration is rejected. |
23/09/2020 | 03/12/2021 |
399 | ACK/KA/RERA/1249/371/PR/200910/004228 | RAVITEJ CHANDRAHAS ANVEKAR | ANAVEKAR LANDMARK | Belagavi (Belgaum) | RAMDURG | As per the Hon'ble Authority Order dated 17-11-2021, application for project registration is rejected. |
10/09/2020 | 03/12/2021 |
400 | ACK/KA/RERA/1259/479/PR/200625/004102 | SKYTOWN BUILDERS AND DEVELOPERS | SKYTOWN WOODS | Dharwad | HUBLI | As per the Hon'ble Authority Order dated 17-11-2021, application for project registration is rejected. |
25/06/2020 | 03/12/2021 |
401 | ACK/KA/RERA/1249/447/PR/200622/004095 | Dhanatejas Constructions | Dhanatejas Constructions | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected.. |
22/06/2020 | 03/12/2021 |
402 | ACK/KA/RERA/1249/367/PR/190524/003313 | Shantanu Manavi | SM 49 SQUARE | Belagavi (Belgaum) | CHIKODI | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
24/05/2019 | 03/12/2021 |
403 | ACK/KA/RERA/1253/286/PR/190522/003310 | Arjun Developers | Nanjundeshwara Nagar Begur Project | Chamrajanagar | GUNDULPET | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
22/05/2019 | 03/12/2021 |
404 | ACK/KA/RERA/1271/486/PR/190522/003307 | RAJU D | ALKOLA VILLAGE ALKOLA | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
22/05/2019 | 03/12/2021 |
405 | ACK/KA/RERA/1268/378/PR/190517/003298 | Ramesh Kumar | Sri Sri Parijatha | Mysore | MYSORE | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
17/05/2019 | 03/12/2021 |
406 | ACK/KA/RERA/1271/486/PR/190506/003269 | G C R Homes | Sree Sai Sambrama | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
06/05/2019 | 03/12/2021 |
407 | ACK/KA/RERA/1251/309/PR/190430/003258 | N.SURENDRA NAIDU | NCNAKSHAYA | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
30/04/2019 | 03/12/2021 |
408 | ACK/KA/RERA/1271/486/PR/190425/003245 | Punyakoti Developers and Builders | Vinayak layout | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
25/04/2019 | 03/12/2021 |
409 | ACK/KA/RERA/1251/446/PR/190401/003187 | SVP INFRASTRUCTURE | SVP SAI SUNSHINE | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
01/04/2019 | 03/12/2021 |
410 | ACK/KA/RERA/1251/446/PR/190314/003121 | SLR AIKYA DEVELOPERS | SLR AIKYA LOTUS | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
14/03/2019 | 03/12/2021 |
411 | ACK/KA/RERA/1256/327/PR/190302/003092 | Hindustan builders | STJSS Layout | Chitradurga | CHITRADURGA | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
02/03/2019 | 03/12/2021 |
412 | ACK/KA/RERA/1256/327/PR/190301/003086 | VISHWANATHA G M | S J S S LAYOUT | Chitradurga | CHITRADURGA | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
01/03/2019 | 03/12/2021 |
413 | ACK/KA/RERA/1251/446/PR/190226/003069 | M/s.EPSHITA BUILDERS | WHITE PALMS | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
26/02/2019 | 03/12/2021 |
414 | ACK/KA/RERA/1256/329/PR/190214/003048 | B PRABHAVATHI | NRS Naik Layout | Chitradurga | HIRIYUR | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
14/02/2019 | 03/12/2021 |
415 | ACK/KA/RERA/1251/446/PR/190213/003045 | T Mallikarjuna | AADHYA NIVAS | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 20-11-2021, application for project registration is rejected. |
13/02/2019 | 03/12/2021 |
416 | ACK/KA/RERA/1251/446/PR/190201/003008 | SB BUILDERS | SB ROYAL ENCLAVE | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected |
01/02/2019 | 03/12/2021 |
417 | ACK/KA/RERA/1251/446/PR/190201/003006 | priyanka developers | SILVER OAK | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
01/02/2019 | 03/12/2021 |
418 | ACK/KA/RERA/1259/479/PR/190128/003000 | HAMAMANTAPPA MYAGERI | ANANYA APARTMENT | Dharwad | HUBLI | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
28/01/2019 | 03/12/2021 |
419 | ACK/KA/RERA/1251/310/PR/190122/002981 | SKR GARDENS | SKR GARDENS | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
22/01/2019 | 03/12/2021 |
420 | ACK/KA/RERA/1251/309/PR/190121/002979 | G SELVA KUMAR | NAGA AXTON | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
21/01/2019 | 03/12/2021 |
421 | ACK/KA/RERA/1251/310/PR/190116/002963 | OPERA STRUCTURES | OPERA AUTUMN GARDENS | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
16/01/2019 | 03/12/2021 |
422 | ACK/KA/RERA/1251/446/PR/200928/004262 | SV BUILDERS | VISWAM HOMES | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 17-11-2021, application for project registration is rejected. |
28/09/2020 | 02/12/2021 |
423 | ACK/KA/RERA/1251/446/PR/200926/004257 | JP GROUP | JP HEIGHTS | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 17-11-2021, application for project registration is rejected. |
26/09/2020 | 02/12/2021 |
424 | ACK/KA/RERA/1262/430/PR/200826/004199 | Kavya K Bennur | K K BENNUR LAYOUT | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 16-11-2021, application for project registration is rejected. |
26/08/2020 | 02/12/2021 |
425 | ACK/KA/RERA/1259/410/PR/200817/004183 | ADITHI INFRA | ADITHI GARDEN | Dharwad | DHARWAD | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
17/08/2020 | 02/12/2021 |
426 | ACK/KA/RERA/1271/486/PR/200618/004079 | HONNAPPA C | HONNAPPA LAYOUT | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
18/06/2020 | 02/12/2021 |
427 | ACK/KA/RERA/1249/447/PR/200616/004075 | KAUSHALYA CONSTRUCTION COMPANY | S.K.Plaza | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 18/11/2021 application for project registration is rejected. |
16/06/2020 | 02/12/2021 |
428 | ACK/KA/RERA/1251/309/PR/200513/004010 | JAI DEVELOPERS | JAI PARK SQUARE | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
13/05/2020 | 02/12/2021 |
429 | PR/KN/170930/002183 | Shri Siddarudha Builders and Developers | Dharani | Bengaluru Rural | DEVANAHALLI | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
30/09/2017 | 02/12/2021 |
430 | ACK/KA/RERA/1271/293/PR/210807/005131 | MEDTHINA DSOUZA | HOSANAGARA LAYOUT | Shivamogga | HOSANAGARA | As per the Hon'ble Authority Order dated 16-11-2021, application for project registration is rejected. |
07/08/2021 | 02/12/2021 |
431 | ACK/KA/RERA/1267/374/PR/210803/005121 | Mahesha | Mahesha | Mandya | SHRIRANGAPATTNA | As per the Hon'ble Authority Order dated 16-11-2021, application for project registration is rejected. |
03/08/2021 | 02/12/2021 |
432 | ACK/KA/RERA/1263/419/PR/200930/004265 | Mohammed Noor Ul Islam | Shamsh Ul Islam Residency | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 17-11-2021, application for project registration is rejected. |
30/09/2020 | 02/12/2021 |
433 | ACK/KA/RERA/1268/378/PR/200622/004094 | V K Jagadish Babu | SANKALP IMPERIAL HOUSE | Mysore | MYSORE | As per the Hon'ble Authority Order dated 17-11-2021, application for project registration is rejected. |
22/06/2020 | 02/12/2021 |
434 | ACK/KA/RERA/1271/486/PR/200611/004060 | Renuka Priya Layout | Renuka Priya Layout | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
11/06/2020 | 02/12/2021 |
435 | ACK/KA/RERA/1263/419/PR/191231/003793 | PRASHANT | PRASHANT LAYOUT 11 | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 19-11-2021, application for project registration is rejected. |
31/12/2019 | 02/12/2021 |
436 | ACK/KA/RERA/1251/446/PR/191227/003781 | SRI BALAJI INFRASTRUCTURE | BALAJI ELITE 2 | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
27/12/2019 | 02/12/2021 |
437 | ACK/KA/RERA/1271/291/PR/191213/003755 | ARUNKUMAR V | LAYOUT | Shivamogga | BHADRAVATHI | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
13/12/2019 | 02/12/2021 |
438 | ACK/KA/RERA/1251/446/PR/191209/003737 | B Konda Reddy | VAIBHAVEE ENCLAVE | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
09/12/2019 | 02/12/2021 |
439 | ACK/KA/RERA/1271/486/PR/191106/003669 | SHANTHILAL BHAVARLAL | LAYOUT | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
06/11/2019 | 02/12/2021 |
440 | ACK/KA/RERA/1271/486/PR/191024/003651 | Midmac Developers Pvt Ltd | Midmac Richmond Town | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
24/10/2019 | 02/12/2021 |
441 | ACK/KA/RERA/1263/419/PR/190525/003318 | Chittaranjan Patil | Chittaranjan Sannur Phase-1 | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
25/05/2019 | 02/12/2021 |
442 | ACK/KA/RERA/1263/419/PR/190525/003317 | Chittaranjan Patil | Chittaranjan Sannur Phase- 2 | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
25/05/2019 | 02/12/2021 |
443 | ACK/KA/RERA/1251/446/PR/190524/003314 | SB BUILDERS | SB ROYAL CLASSIC | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
24/05/2019 | 02/12/2021 |
444 | ACK/KA/RERA/1250/303/PR/190506/003270 | Sri Srinivasa.V | Vaishnavi Grande | Bengaluru Rural | DEVANAHALLI | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
06/05/2019 | 02/12/2021 |
445 | ACK/KA/RERA/1271/486/PR/190502/003260 | Punyakoti Developers and Builders | Dollors colony | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
02/05/2019 | 02/12/2021 |
446 | ACK/KA/RERA/1265/339/PR/190427/003250 | BALAJI MADHAVASHETTY | VVS ROSE GARDENS PHASE II | Kolar | KOLAR | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
27/04/2019 | 02/12/2021 |
447 | ACK/KA/RERA/1265/347/PR/190420/003237 | PRADEEP M S | ASR DEVELOPERS | Kolar | MALUR | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
20/04/2019 | 02/12/2021 |
448 | ACK/KA/RERA/1256/329/PR/190412/003217 | RAMANNA K | SRI MANJUNATHA SWAMY LAYOUT | Chitradurga | HIRIYUR | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
12/04/2019 | 02/12/2021 |
449 | ACK/KA/RERA/1268/378/PR/190409/003206 | M/S PALATINE PROJECTS | Palatine | Mysore | MYSORE | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
09/04/2019 | 02/12/2021 |
450 | ACK/KA/RERA/1251/446/PR/190327/003161 | PALETI JOYCE | KL REGENCY | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
27/03/2019 | 02/12/2021 |
451 | ACK/KA/RERA/1251/310/PR/190326/003159 | A R PROPERTIES | A R FORTUNE | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
26/03/2019 | 02/12/2021 |
452 | ACK/KA/RERA/1271/486/PR/190324/003152 | MOHAN H | MOHAN LAYOUT | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
24/03/2019 | 02/12/2021 |
453 | ACK/KA/RERA/1253/286/PR/190318/003136 | ARJUN DEVELOPERS | panjaanahalli layout | Chamrajanagar | GUNDULPET | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
18/03/2019 | 02/12/2021 |
454 | ACK/KA/RERA/1256/329/PR/190315/003125 | H R VEERESH | SUMA CHANDRASHEKAR NAGARA | Chitradurga | HIRIYUR | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
15/03/2019 | 02/12/2021 |
455 | ACK/KA/RERA/1271/486/PR/190312/003117 | K C Ramachandra | Channappa Gowda Layout | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 25-10-2021, application for project registration is rejected. |
12/03/2019 | 02/12/2021 |
456 | ACK/KA/RERA/1255/477/PR/190309/003109 | P S INJITHKUMAR | SIERRA PALMS APARTMENTS | Chikkamagaluru | CHIKKAMAGALURU | As per the Hon'ble Authority Order dated 22-10-2021, application for project registration is rejected. |
09/03/2019 | 02/12/2021 |
457 | ACK/KA/RERA/1251/446/PR/190107/002950 | Poorvi Infinite Private Limited | POORVI CHAMPIONS HEIGHT | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
07/01/2019 | 02/12/2021 |
458 | ACK/KA/RERA/1257/334/PR/181231/002941 | SPACE | MARIAN PARADISE STREAK "(LAND OWNER SHARE)" | Dakshina Kannada | MANGALORE | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
31/12/2018 | 02/12/2021 |
459 | ACK/KA/RERA/1254/465/PR/181230/002938 | Sridhar B.R | devaraguthahalli | Chikballapur | Sidlaghatta | As per the Hon'ble Authority Order dated 16-11-2021, application for project registration is rejected. |
30/12/2018 | 02/12/2021 |
460 | ACK/KA/RERA/1273/319/PR/180927/002667 | SHREEDHAR ACHAR | ANANTHA RESIDENCY | Udupi | KARKAL | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
27/09/2018 | 02/12/2021 |
461 | PR/KN/180214/002738 | Amrith Shenoy P | VOLAGA | Udupi | UDUPI | As per the Hon'ble Authority Order dated 21-10-2021, application for project registration is rejected. |
14/02/2018 | 02/12/2021 |
462 | PR/KN/171101/002316 | MUSKAAN DEVELOPERS | LAO-41/2013-14 | Bengaluru Rural | HOSKOTE | As per the Hon'ble Authority Order dated 16-11-2021, application for project registration is rejected. |
01/11/2017 | 02/12/2021 |
463 | PR/KN/171017/002238 | CRONOS CONSTRUCTIONS | ALCON STAR | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 18-11-2021, application for project registration is rejected. |
17/10/2017 | 02/12/2021 |
464 | ACK/KA/RERA/1271/486/PR/191224/003779 | M/s. Surya Developers And Builders | Surya Layout | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
24/12/2019 | 17/11/2021 |
465 | ACK/KA/RERA/1271/486/PR/191213/003754 | S S JYOTHIPRAKSH | J P LAYOUT | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
13/12/2019 | 17/11/2021 |
466 | ACK/KA/RERA/1262/432/PR/191205/003734 | JANANI PRAMOTERS & DEVELOPERS | JANANI LAYOUT | Haveri | HANGEL | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
05/12/2019 | 17/11/2021 |
467 | ACK/KA/RERA/1249/447/PR/191205/003732 | ONENESS BUILDERS AND DEVELOPERS | SHIVSHANTI EMPIRE | Belagavi (Belgaum) | BELAGAVI | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
05/12/2019 | 17/11/2021 |
468 | ACK/KA/RERA/1249/367/PR/191202/003723 | Sajid iqbal Javed Iqbal Murasal | Sarkar Colony Nipani | Belagavi (Belgaum) | CHIKODI | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
02/12/2019 | 17/11/2021 |
469 | ACK/KA/RERA/1249/369/PR/191126/003708 | Hajaratali Ahamad Peerjade | PATTAN SHETTI LAYOUT | Belagavi (Belgaum) | HUKERI | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
26/11/2019 | 17/11/2021 |
470 | ACK/KA/RERA/1255/325/PR/191121/003701 | BENAKAKONDI MAHARUDRAPPA | ADHISHANKARA BADAVANNE | Chikkamagaluru | SRINGERI | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
21/11/2019 | 17/11/2021 |
471 | ACK/KA/RERA/1251/446/PR/191102/003658 | s somshekar | sathivk enclave | Bengaluru Urban | Bengaluru East | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
02/11/2019 | 17/11/2021 |
472 | ACK/KA/RERA/1257/336/PR/191016/003627 | Kamaldeep Builders And Developers | KAMALDEEP'S PALGUNI COMPLEX | Dakshina Kannada | BANTWAL | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
16/10/2019 | 17/11/2021 |
473 | ACK/KA/RERA/1249/367/PR/191016/003626 | Jayakumar Appasab Khot | J K Layout | Belagavi (Belgaum) | CHIKODI | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
16/10/2019 | 17/11/2021 |
474 | ACK/KA/RERA/1262/429/PR/191013/003620 | SAVITA SATISH TADASAD | RAJESHWARI PRASHANT SAVADATTI & CHANDRAKANT BASAVRAJ SAVADATTI RESIDENTIAL LAYOUT | Haveri | HAVERI | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
13/10/2019 | 17/11/2021 |
475 | ACK/KA/RERA/1268/378/PR/190402/003190 | SATHISH B P | SUVARNA MAHAL | Mysore | MYSORE | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
02/04/2019 | 17/11/2021 |
476 | ACK/KA/RERA/1251/308/PR/190104/002948 | BUILD 4U INFRA PRIVATE LIMITED | PSR COSMOS | Bengaluru Urban | Anekal | As per the Hon'ble Authority Order dated 22/10/2021 application for project registration is rejected. |
04/01/2019 | 17/11/2021 |
477 | ACK/KA/RERA/1271/486/PR/181231/002940 | PRAVEEN MAHISHI | BELALKU | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 21/10/2021 application for project registration is rejected. |
31/12/2018 | 17/11/2021 |
478 | ACK/KA/RERA/1262/430/PR/181017/002733 | Abdul | SKN LAYOUT - 1 | Haveri | RANIBENNUR | As per the Hon'ble Authority Order dated 25/10/2021 application for project registration is rejected. |
17/10/2018 | 17/11/2021 |
479 | ACK/KA/RERA/1254/460/PR/180802/002517 | SITRUS PROJECTS | SITRUS MEADOWS ( VILLAS PROJECT) | Chikballapur | Chikkaballapur | As per the Hon'ble Authority Order dated 21/10/2021 application for project registration is rejected. |
02/08/2018 | 17/11/2021 |
480 | PR/KN/180320/002837 | SAMAYAMANTULA RAVI KUMAR | RAVIKUMAR | Koppal | GANGAVATHI | As per the Hon'ble Authority Order dated 21/10/2021 application for project registration is rejected. |
20/03/2018 | 17/11/2021 |
481 | PR/KN/180118/002650 | BHUMIKA BUILDERS | BHUMIKA PRIMROSE | Bengaluru Urban | Bengaluru South | As per the Hon'ble Authority Order dated 21/10/2021 application for project registration is rejected. |
18/01/2018 | 17/11/2021 |
482 | PR/KN/171230/002602 | Vishwas Bawa Builders | Vishwas Supreme | Dakshina Kannada | MANGALORE | As per the Hon'ble Authority Order dated 21/10/2021 application for project registration is rejected. |
30/12/2017 | 17/11/2021 |
483 | PR/KN/171207/002507 | TETRA GRAND CONSTRUCTIONS | TETRA GRAND'S GREEN ADMIRE A BLOCK | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 21/10/2021 application for project registration is rejected. |
07/12/2017 | 17/11/2021 |
484 | PR/KN/171120/002385 | SUMANGALA NAGARI | Devi Builders-40'x90' | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 21/10/2021 application for project registration is rejected. |
20/11/2017 | 17/11/2021 |
485 | ACK/KA/RERA/1251/309/PR/200228/003931 | Sudhakara Reddy Annem | Affinity Sannidhan | Bengaluru Urban | Bengaluru North | As per the Hon'ble Authority Order dated 13/08/2021 application for project registration is rejected. |
28/02/2020 | 08/11/2021 |
486 | ACK/KA/RERA/1271/486/PR/190701/003387 | P V Vishwanath | Hampanna Layout | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 04/10/2021 application for project registration is rejected. |
01/07/2019 | 08/11/2021 |
487 | ACK/KA/RERA/1263/419/PR/180927/002670 | PARKLAND CONSTRUCTIONS | SHAMSHUL ISLAM RESIDENCY | Kalaburgi | KALABURGI | As per the Hon'ble Authority Order dated 04/10/2021 application for project registration is rejected. |
27/09/2018 | 08/11/2021 |
488 | ACK/KA/RERA/1271/486/PR/180611/002333 | LINGARAJU S K | LINGARAJU S K | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 04/10/2021 application for project registration is rejected. |
11/06/2018 | 08/11/2021 |
489 | ACK/KA/RERA/1271/486/PR/180611/002332 | NAVEENA G S | NAVEENA G S | Shivamogga | SHIVAMOGGA | As per the Hon'ble Authority Order dated 04/10/2021 application for project registration is rejected. |
11/06/2018 | 08/11/2021 |
490 | ACK/KA/RERA/1251/308/PR/180606/002322 | INFRANY VENTURES | INFRANY NEST | Bengaluru Urban | Anekal | As per Hon`ble Authority order dated 04/10/2021 application for project registration is rejected. |
06/06/2018 | 08/11/2021 |
491 | ACK/KA/RERA/1250/300/PR/180601/002296 | Rosham reddy | go green HOUSINGS | Bengaluru Rural | CHANNAPATNA | As per Hon`ble Authority order dated 04/10/2021 application for project registration is rejected. |
01/06/2018 | 08/11/2021 |
492 | ACK/KA/RERA/1249/447/PR/180521/002261 | Reliable Constructions | Darus Salam Apartment | Belagavi (Belgaum) | BELAGAVI | As per Hon`ble Authority order dated 04/10/2021 application for project registration is rejected. |
21/05/2018 | 08/11/2021 |
493 | ACK/KA/RERA/1251/446/PR/210713/005074 | sv builders | SV ROYAL HOMES | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 05/10/2021 application for project registration is rejected. |
13/07/2021 | 02/11/2021 |
494 | ACK/KA/RERA/1249/367/PR/210712/005073 | Jayasing | Vinayand Colony | Belagavi (Belgaum) | CHIKODI | As per Hon`ble Authority order dated 05/10/2021 application for project registration is rejected. |
12/07/2021 | 02/11/2021 |
495 | ACK/KA/RERA/1263/419/PR/210710/005070 | LAXMIBAI P HOSPET | PARMESHWAR HOSPETI LAYOUT | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 05/10/2021 application for project registration is rejected. |
10/07/2021 | 02/11/2021 |
496 | ACK/KA/RERA/1268/378/PR/210707/005067 | K N Suresh | SRAMIKARA LAYOUT | Mysore | MYSORE | As per Hon`ble Authority order dated 05/10/2021 application for project registration is rejected. |
07/07/2021 | 02/11/2021 |
497 | ACK/KA/RERA/1262/435/PR/210707/005066 | MOHMMED ISMAIL DHANEBAG | MAHEBOOB SHARIFSHAH COLONY | Haveri | SHIGGAON | As per Hon`ble Authority order dated 04/10/2021 application for project registration is rejected. |
07/07/2021 | 02/11/2021 |
498 | ACK/KA/RERA/1262/435/PR/210627/005038 | ABIDABANU MD HANEEF | QADRIYA TOWN | Haveri | SHIGGAON | As per Hon`ble Authority order dated 05/10/2021 application for project registration is rejected. |
27/06/2021 | 02/11/2021 |
499 | ACK/KA/RERA/1249/447/PR/210412/004915 | BSS Infrastructure | GALAXY A APARTMENT | Belagavi (Belgaum) | BELAGAVI | As per Hon`ble Authority order dated 30/09/2021 application for project registration is rejected. |
12/04/2021 | 02/11/2021 |
500 | ACK/KA/RERA/1255/326/PR/210102/004485 | H O SATHISH KUMAR | HMOS LAYOUT 2ND PHASE | Chikkamagaluru | TARIKERE | As per Hon`ble Authority order dated 05/10/2021 application for project registration is rejected. |
02/01/2021 | 02/11/2021 |
501 | ACK/KA/RERA/1258/404/PR/190708/003413 | M/s. A.M BUILDERS & DEVELOPERS | NAINIKA PRIMEROSE | Davangere | DAVANGERE | As per Hon`ble Authority order dated 04/10/2021 application for project registration is rejected. |
08/07/2019 | 02/11/2021 |
502 | ACK/KA/RERA/1263/419/PR/190703/003398 | PRAVIN | Pravin Sannur Phase - 2 | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 04/10/2021 application for project registration is rejected. |
03/07/2019 | 02/11/2021 |
503 | ACK/KA/RERA/1263/419/PR/190703/003395 | PRAVIN BASAPPA | Pravin Sannur Phase -1 | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 04/10/2021 application for project registration is rejected. |
03/07/2019 | 02/11/2021 |
504 | ACK/KA/RERA/1263/419/PR/190703/003393 | PRAVIN | Pravin Sannur Phase - 3 | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 04/10/2021 application for project registration is rejected. |
03/07/2019 | 02/11/2021 |
505 | ACK/KA/RERA/1263/419/PR/190703/003392 | CHITTARANJAN PATIL | Chittaranjan Sannur Phase- 5 | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 04/10/2021 application for project registration is rejected. |
03/07/2019 | 02/11/2021 |
506 | ACK/KA/RERA/1271/486/PR/190626/003382 | N J BHARATHESH | BHARATHESHA LAYOUT | Shivamogga | SHIVAMOGGA | As per Hon`ble Authority order dated 04/10/2021 application for project registration is rejected. |
26/06/2019 | 02/11/2021 |
507 | ACK/KA/RERA/1251/446/PR/190626/003380 | sapthagiri infra | SAPTHAGIRI LOTUS | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 05/10/2021 application for project registration is rejected. |
26/06/2019 | 02/11/2021 |
508 | ACK/KA/RERA/1273/319/PR/190615/003362 | Leo Gregory Pereira | Konkan Plaza | Udupi | KARKAL | As per Hon`ble Authority order dated 04/10/2021 application for project registration is rejected. |
15/06/2019 | 02/11/2021 |
509 | ACK/KA/RERA/1250/305/PR/181117/002819 | H.S Yogesh | NISARGA LAYOUT | Bengaluru Rural | KANAKAPURA | As per Hon`ble Authority order dated 05/10/2021 application for project registration is rejected. |
17/11/2018 | 02/11/2021 |
510 | ACK/KA/RERA/1262/435/PR/210627/005037 | NIDA FATIMA A KHATIB | ROYAL PARK | Haveri | SHIGGAON | As per Hon`ble Authority order dated 17/09/2021 application for project registration is rejected. |
27/06/2021 | 11/10/2021 |
511 | ACK/KA/RERA/1268/378/PR/210624/005025 | Vishwam | Shreeshaa Hill View 5 | Mysore | MYSORE | As per Hon`ble Authority order dated 29/09/2021 application for project registration is rejected. |
24/06/2021 | 11/10/2021 |
512 | ACK/KA/RERA/1262/430/PR/210325/004853 | Vikram Sanghavi Urf Jain | SUKHIDEVI LAYOUT | Haveri | RANIBENNUR | As per Hon`ble Authority order dated 09/09/2021 application for project registration is rejected. |
25/03/2021 | 11/10/2021 |
513 | ACK/KA/RERA/1251/446/PR/210323/004841 | SREE SAI BALAJI BUILDERS | GRAND MONTE VISTA | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 09/09/2021 application for project registration is rejected. |
23/03/2021 | 11/10/2021 |
514 | ACK/KA/RERA/1263/421/PR/190906/003538 | Mahendra Kumar ,Ganesh and K.Vijayakumar | ANKITA COLONY | Kalaburgi | YADGIR | As per Hon`ble Authority order dated 29/09/2021 application for project registration is rejected. |
06/09/2019 | 11/10/2021 |
515 | ACK/KA/RERA/1255/325/PR/190813/003489 | P S INJITHKUMAR | BAKTHAMAPURA LAYOUT | Chikkamagaluru | SRINGERI | As per Hon`ble Authority order dated 29/09/2021 application for project registration is rejected. |
13/08/2019 | 11/10/2021 |
516 | ACK/KA/RERA/1253/286/PR/190709/003415 | ARJUN DEVELOPERS | Mahalingappa-Layout-Project | Chamrajanagar | GUNDULPET | As per Hon`ble Authority order dated 29/09/2021 application for project registration is rejected. |
09/07/2019 | 11/10/2021 |
517 | ACK/KA/RERA/1262/432/PR/190531/003331 | SHAHNAZ BANU W/O ABDULWAHID ANNIGERI | ANNIGERI LAYOUT | Haveri | HANGEL | As per Hon`ble Authority order dated 29/09/2021 application for project registration is rejected. |
31/05/2019 | 11/10/2021 |
518 | ACK/KA/RERA/1263/419/PR/190527/003321 | Chittaranjan Patil | Chittaranjan Sannur Phase-4 | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 29/09/2021 application for project registration is rejected. |
27/05/2019 | 11/10/2021 |
519 | ACK/KA/RERA/1263/419/PR/190527/003320 | Chittaranjan Patil | Chittaranjan Sannur Phase-3 | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 29/09/2021 application for project registration is rejected. |
27/05/2019 | 11/10/2021 |
520 | ACK/KA/RERA/1251/310/PR/181227/002926 | M/s. Thilak Builders | Sri Temple Touch | Bengaluru Urban | Bengaluru South | As per Hon`ble Authority order dated 18/09/2021 application for project registration is rejected. |
27/12/2018 | 11/10/2021 |
521 | ACK/KA/RERA/1258/407/PR/181224/002921 | A M BASAVARAJ | Residential layout formed in Sy. No 122/A1, 122/A2, & 122/2 | Davangere | HARAPANHALLI | As per Hon`ble Authority order dated 17/09/2021 application for project registration is rejected. |
24/12/2018 | 11/10/2021 |
522 | ACK/KA/RERA/1250/303/PR/181221/002918 | Cubatic Arcades Private Limited | ASTER | Bengaluru Rural | DEVANAHALLI | As per Hon`ble Authority order dated 17/09/2021 application for project registration is rejected. |
21/12/2018 | 11/10/2021 |
523 | ACK/KA/RERA/1250/304/PR/181204/002869 | Soorya Naidu.K.M | Garden City | Bengaluru Rural | HOSKOTE | As per Hon`ble Authority order dated 17/09/2021 application for project registration is rejected. |
04/12/2018 | 11/10/2021 |
524 | ACK/KA/RERA/1254/465/PR/181116/002815 | V. Manjula | Sai Royal City | Chikballapur | Sidlaghatta | As per Hon`ble Authority order dated 14/09/2021 application for project registration is rejected. |
16/11/2018 | 11/10/2021 |
525 | ACK/KA/RERA/1262/433/PR/210628/005040 | FAMEDABEGAM RISALDAR | RISALDAR PLOT | Haveri | SAVANUR | As per Hon`ble Authority order dated 17/09/2021 application for project registration is rejected. |
28/06/2021 | 08/10/2021 |
526 | ACK/KA/RERA/1251/446/PR/210524/004990 | RAGHUNANDAN G | ECO- SPRINGS | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 14/09/2021 application for project registration is rejected. |
24/05/2021 | 08/10/2021 |
527 | ACK/KA/RERA/1257/334/PR/210501/004963 | Mohammad Zafarulla | Imad Complex | Dakshina Kannada | MANGALORE | As per Hon`ble Authority order dated 07/09/2021 application for project registration is rejected. |
01/05/2021 | 08/10/2021 |
528 | ACK/KA/RERA/1249/367/PR/210408/004907 | Mahesh Gurunath Lokhande | Lokhande 1 | Belagavi (Belgaum) | CHIKODI | As per Hon`ble Authority order dated 09/09/2021 application for project registration is rejected. |
08/04/2021 | 08/10/2021 |
529 | ACK/KA/RERA/1271/486/PR/190928/003585 | MAYURA SOANS | ESHWAR LAYOUT | Shivamogga | SHIVAMOGGA | As per Hon`ble Authority order dated 09/09/2021 application for project registration is rejected. |
28/09/2019 | 08/10/2021 |
530 | ACK/KA/RERA/1256/327/PR/190921/003568 | K S SATHYANARAYANA SETTY | Kannika Layout | Chitradurga | CHITRADURGA | As per Hon`ble Authority order dated 14/09/2021 application for project registration is rejected. |
21/09/2019 | 08/10/2021 |
531 | ACK/KA/RERA/1271/291/PR/190919/003565 | K SHASHIKUMAR | ARJUN VALLEY | Shivamogga | BHADRAVATHI | As per Hon`ble Authority order dated 15/09/2021 application for project registration is rejected. |
19/09/2019 | 08/10/2021 |
532 | ACK/KA/RERA/1251/446/PR/190918/003562 | vibha constructions | vibha sannidhi | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 18/09/2021 application for project registration is rejected. |
18/09/2019 | 08/10/2021 |
533 | ACK/KA/RERA/1251/446/PR/190918/003561 | anvitha projects | anvitha bee | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 18/09/2021 application for project registration is rejected. |
18/09/2019 | 08/10/2021 |
534 | ACK/KA/RERA/1257/334/PR/190918/003558 | Ashraya Builders and Promoters | PETUNIA | Dakshina Kannada | MANGALORE | As per Hon`ble Authority order dated 18/09/2021 application for project registration is rejected. |
18/09/2019 | 08/10/2021 |
535 | ACK/KA/RERA/1251/446/PR/190912/003546 | sri sai constructions | sri sai delight | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 18/09/2021 application for project registration is rejected. |
12/09/2019 | 08/10/2021 |
536 | ACK/KA/RERA/1271/486/PR/181227/002929 | GRAMANTHARA SARKARI NAVUKARA VASATHI SAHAKARA SANGHA NIYAMITHA | M P THIMAPPA RESIDENTIAL LAYOUT NAVULE BELAKU RESIDENTIAL LAYOUT BOMMANAKETTE | Shivamogga | SHIVAMOGGA | As per Hon`ble Authority order dated 18/09/2021 application for project registration is rejected. |
27/12/2018 | 08/10/2021 |
537 | ACK/KA/RERA/1251/308/PR/181124/002840 | ACCENT HOMEZ | ACCENT ASHLAR | Bengaluru Urban | Anekal | As per Hon`ble Authority order dated 15/09/2021 application for project registration is rejected. |
24/11/2018 | 08/10/2021 |
538 | ACK/KA/RERA/1251/310/PR/181015/002722 | SONIN DEVELOPERS LLP | SONI TRANQUIL | Bengaluru Urban | Bengaluru South | As per Hon`ble Authority order dated 17/09/2021 application for project registration is rejected. |
15/10/2018 | 08/10/2021 |
539 | ACK/KA/RERA/1250/303/PR/181006/002703 | Lakepoint Builders Private Limited | Villa Phase A | Bengaluru Rural | DEVANAHALLI | As per Hon`ble Authority order dated 17/09/2021 application for project registration is rejected. |
06/10/2018 | 08/10/2021 |
540 | ACK/KA/RERA/1271/293/PR/181004/002690 | H K SRIDHAR | HALAGUNDA LAYOUT | Shivamogga | HOSANAGARA | As per Hon`ble Authority order dated 18/09/2021 application for project registration is rejected. |
04/10/2018 | 08/10/2021 |
541 | ACK/KA/RERA/1257/334/PR/180925/002658 | S M Saleem | POPULAR BUILDING | Dakshina Kannada | MANGALORE | As per Hon`ble Authority order dated 15/09/2021 application for project registration is rejected. |
25/09/2018 | 08/10/2021 |
542 | ACK/KA/RERA/1251/310/PR/180924/002649 | BR Ranganath | Uthsava Enclave | Bengaluru Urban | Bengaluru South | As per Hon`ble Authority order dated 17/09/2021 application for project registration is rejected. |
24/09/2018 | 08/10/2021 |
543 | ACK/KA/RERA/1262/430/PR/180920/002640 | VINOD SANGHAVI | GUTTAL ROAD | Haveri | RANIBENNUR | As per Hon`ble Authority order dated 15/09/2021 application for project registration is rejected. |
20/09/2018 | 08/10/2021 |
544 | ACK/KA/RERA/1257/334/PR/180905/002605 | SAFWAN | VISHWAS MERCURY | Dakshina Kannada | MANGALORE | As per Hon`ble Authority order dated 17/09/2021 application for project registration is rejected. |
05/09/2018 | 08/10/2021 |
545 | ACK/KA/RERA/1265/339/PR/180827/002576 | BALAJI M | VVS ROSE GARDENS PHASE III | Kolar | KOLAR | As per Hon`ble Authority order dated 18/09/2021 application for project registration is rejected. |
27/08/2018 | 08/10/2021 |
546 | ACK/KA/RERA/1259/479/PR/180727/002492 | TECHNO STORE AND REALTORS | ABHINANDAN TOWER | Dharwad | HUBLI | As per Hon`ble Authority order dated 14/09/2021 application for project registration is rejected. |
27/07/2018 | 08/10/2021 |
547 | PR/KN/171005/001696 | GOLDEN VALLEY DEVELOPERS | GOLDEN VALLEY – PHASE 2 | Bengaluru Urban | Bengaluru South | As per Hon`ble Authority order dated 15/09/2021 application for project registration is rejected. |
05/10/2017 | 08/10/2021 |
548 | ACK/KA/RERA/1249/447/PR/210522/004987 | HEDDURSHETTI DEVELOPERS | HEDDURSHETTI TOWERS | Belagavi (Belgaum) | BELAGAVI | As per Hon`ble Authority order dated 01/09/2021 application for project registration is rejected. |
22/05/2021 | 07/09/2021 |
549 | ACK/KA/RERA/1259/479/PR/210514/004974 | BHAIRU GREENHUBZ REALTY | AURA | Dharwad | HUBLI | As per Hon`ble Authority order dated 01/09/2021 application for project registration is rejected. |
14/05/2021 | 07/09/2021 |
550 | ACK/KA/RERA/1251/310/PR/210305/004773 | Sri KrishnaResidency | Sri Krishna Residency | Bengaluru Urban | Bengaluru South | As per Hon`ble Authority order dated 02/09/2021 application for project registration is rejected. |
05/03/2021 | 07/09/2021 |
551 | ACK/KA/RERA/1271/292/PR/210305/004772 | ASADULLA | KGN LAYOUT | Shivamogga | SORABA | As per Hon`ble Authority order dated 01/09/2021 application for project registration is rejected. |
05/03/2021 | 07/09/2021 |
552 | ACK/KA/RERA/1268/378/PR/210304/004768 | ARCHANA K S | JATHIN VENTURES UNIT 3 | Mysore | MYSORE | As per Hon`ble Authority order dated 02/09/2021 application for project registration is rejected. |
04/03/2021 | 07/09/2021 |
553 | ACK/KA/RERA/1268/378/PR/210303/004761 | RAVANDUR HUCHAPPA SHIVANNA | JATHIN VENTURES UNIT 1 | Mysore | MYSORE | As per Hon`ble Authority order dated 02/09/2021 application for project registration is rejected. |
03/03/2021 | 07/09/2021 |
554 | ACK/KA/RERA/1268/378/PR/210301/004751 | Vaishnavi Constructions | Prakash Vista | Mysore | MYSORE | As per Hon`ble Authority order dated 02/09/2021 application for project registration is rejected. |
01/03/2021 | 07/09/2021 |
555 | ACK/KA/RERA/1262/430/PR/210222/004718 | Mohan S Bennur | S Y BENNUR LAYOUT | Haveri | RANIBENNUR | As per Hon`ble Authority order dated 02/09/2021 application for project registration is rejected. |
22/02/2021 | 07/09/2021 |
556 | ACK/KA/RERA/1251/309/PR/210210/004666 | UV PROJECTS | UV PINTO ENCLAVE | Bengaluru Urban | Bengaluru North | As per Hon`ble Authority order dated 02/09/2021 application for project registration is rejected. |
10/02/2021 | 07/09/2021 |
557 | ACK/KA/RERA/1271/486/PR/210129/004572 | SHIVARAJA G T | RADHA KRISHNA LAYOUT | Shivamogga | SHIVAMOGGA | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
29/01/2021 | 07/09/2021 |
558 | ACK/KA/RERA/1259/479/PR/210415/004920 | Gangadhar Nayak | Shree Vishnu Enclave | Dharwad | HUBLI | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
15/04/2021 | 02/09/2021 |
559 | ACK/KA/RERA/1251/446/PR/210408/004905 | GOLDEN RAY DEVELOPERS | GOLDEN HARMONY | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
08/04/2021 | 02/09/2021 |
560 | ACK/KA/RERA/1268/378/PR/210407/004901 | AKKHANDA SAI CONSTRUCTION PRIVATE LIMITED | Yoga green Apartment | Mysore | MYSORE | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
07/04/2021 | 02/09/2021 |
561 | ACK/KA/RERA/1272/394/PR/210402/004878 | Bhaskar | Habitat Enclae | Tumakuru | TUMKUR | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
02/04/2021 | 02/09/2021 |
562 | ACK/KA/RERA/1251/446/PR/210331/004872 | vamsiram builders | Jyothi Woods 2 | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
31/03/2021 | 02/09/2021 |
563 | ACK/KA/RERA/1262/435/PR/210317/004824 | SURESH MAHADEVAPPA BADIGER | CHAVVI LAYOUT | Haveri | SHIGGAON | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
17/03/2021 | 02/09/2021 |
564 | ACK/KA/RERA/1251/472/PR/210303/004766 | Sree Sai Properties | SREE SAI SAMRUDDI | Bengaluru Urban | YELAHANKA | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
03/03/2021 | 02/09/2021 |
565 | ACK/KA/RERA/1263/419/PR/210303/004762 | YASHASWI TOWNSHIP PROJECTS PVT LTD | YASHASWI ANUGRAHA NAGAR | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
03/03/2021 | 02/09/2021 |
566 | ACK/KA/RERA/1263/419/PR/210225/004741 | sangmesh | mathura | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
25/02/2021 | 02/09/2021 |
567 | ACK/KA/RERA/1262/430/PR/210222/004717 | Prakash S Bennur | BENNUR LAYOUT | Haveri | RANIBENNUR | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
22/02/2021 | 02/09/2021 |
568 | ACK/KA/RERA/1262/430/PR/210222/004716 | Hanumanthappa Chanabasappa Kasaval | Kasaval Layout | Haveri | RANIBENNUR | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
22/02/2021 | 02/09/2021 |
569 | ACK/KA/RERA/1268/378/PR/210211/004670 | Sridhar Raj Urs | Magan Flower Homes | Mysore | MYSORE | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
11/02/2021 | 02/09/2021 |
570 | ACK/KA/RERA/1253/286/PR/210206/004649 | Ashfaq Ahmed A | T P Layout | Chamrajanagar | GUNDULPET | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
06/02/2021 | 02/09/2021 |
571 | ACK/KA/RERA/1268/378/PR/201112/004356 | Sri Akkhanda sai constructions Private Ltd | yoga Green Apartment | Mysore | MYSORE | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
12/11/2020 | 02/09/2021 |
572 | ACK/KA/RERA/1271/289/PR/200804/004164 | ARUNA K | ARUN LAYOUT | Shivamogga | SAGARA | As per Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
04/08/2020 | 02/09/2021 |
573 | ACK/KA/RERA/1249/367/PR/210127/004553 | SHRENIK MAHAVEER CHOUGALE | SIDDHI SAI LAYOUT | Belagavi (Belgaum) | CHIKODI | As per the Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
27/01/2021 | 30/08/2021 |
574 | ACK/KA/RERA/1268/378/PR/210122/004534 | SHIVAPPA | MAHENDRA ENCLAVE | Mysore | MYSORE | As per the Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
22/01/2021 | 30/08/2021 |
575 | ACK/KA/RERA/1271/486/PR/210120/004526 | Yasharaj S V | Yasharaj s v | Shivamogga | SHIVAMOGGA | As per the Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
20/01/2021 | 30/08/2021 |
576 | ACK/KA/RERA/1249/367/PR/200524/004019 | Irshadah Mohumed Azeem Patel | Patel Layout | Belagavi (Belgaum) | CHIKODI | As per the Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
24/05/2020 | 30/08/2021 |
577 | ACK/KA/RERA/1250/303/PR/200318/003989 | Lakepoint Builders Private Limited | Causeway | Bengaluru Rural | DEVANAHALLI | As per the Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
18/03/2020 | 30/08/2021 |
578 | ACK/KA/RERA/1268/378/PR/200313/003974 | GJS Infratech Pvt Ltd | Jalavayu Mysore Towers | Mysore | MYSORE | As per the Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
13/03/2020 | 30/08/2021 |
579 | ACK/KA/RERA/1249/367/PR/200311/003969 | ANNAPPA SIDDAPPA GURAV | GURAV LAYOUT | Belagavi (Belgaum) | CHIKODI | As per the Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
11/03/2020 | 30/08/2021 |
580 | ACK/KA/RERA/1263/419/PR/200311/003968 | PRAVIN | Pravin Layout SY no- 6/4 | Kalaburgi | KALABURGI | As per the Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
11/03/2020 | 30/08/2021 |
581 | ACK/KA/RERA/1263/419/PR/200311/003966 | CHITTARANJAN | Chittaranjan Layout Sy no-118/4 | Kalaburgi | KALABURGI | As per the Hon`ble Authority order dated 19/08/2021 application for project registration is rejected. |
11/03/2020 | 30/08/2021 |
582 | ACK/KA/RERA/1251/446/PR/200218/003910 | SHANMUGAM G | SRIKANTH VISTA | Bengaluru Urban | Bengaluru East | As per the Hon`ble Authority order dated 11/08/2021 application for project registration is rejected. |
18/02/2020 | 30/08/2021 |
583 | ACK/KA/RERA/1251/446/PR/200218/003909 | SRI LORVEN BUILDERS | SRI LORVEN ELITE | Bengaluru Urban | Bengaluru East | As per the Hon`ble Authority order dated 11/08/2021 application for project registration is rejected. |
18/02/2020 | 30/08/2021 |
584 | ACK/KA/RERA/1251/446/PR/200217/003907 | AMR CONSTRUCTIONS | SRI SAI PRAGNA ELITE | Bengaluru Urban | Bengaluru East | As per the Hon`ble Authority order dated 03/08/2021 application for project registration is rejected. |
17/02/2020 | 30/08/2021 |
585 | ACK/KA/RERA/1271/486/PR/200213/003898 | MUHAMMAD GHOUS | MOHAMMED GOUSE | Shivamogga | SHIVAMOGGA | As per the Hon`ble Authority order dated 09/08/2021 application for project registration is rejected. |
13/02/2020 | 30/08/2021 |
586 | ACK/KA/RERA/1251/446/PR/200212/003895 | sri balaji developers | AISHWARYA KANCHARLA GRAND | Bengaluru Urban | Bengaluru East | As per the Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
12/02/2020 | 30/08/2021 |
587 | ACK/KA/RERA/1251/446/PR/200212/003892 | sri balaji developers | ISHWARYA KANCHARLA GRAND | Bengaluru Urban | Bengaluru East | As per the Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
12/02/2020 | 30/08/2021 |
588 | ACK/KA/RERA/1249/367/PR/200128/003866 | Shankar Nanasaheb Chothe | Lakshmi Narayan Nagar | Belagavi (Belgaum) | CHIKODI | As per the Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
28/01/2020 | 30/08/2021 |
589 | ACK/KA/RERA/1249/447/PR/200128/003865 | Global City Land Developers And Builders | Adinath Arcade | Belagavi (Belgaum) | BELAGAVI | As per the Hon`ble Authority order dated 06/08/2021 application for project registration is rejected. |
28/01/2020 | 30/08/2021 |
590 | ACK/KA/RERA/1251/446/PR/200120/003840 | akhil | AKHIL SANGAMA | Bengaluru Urban | Bengaluru East | As per the Hon`ble Authority order dated 09/08/2021 application for project registration is rejected. |
20/01/2020 | 30/08/2021 |
591 | ACK/KA/RERA/1251/446/PR/200120/003837 | NAKSHATRA BUILDERS AND DEVELOPERS | SKYRAH HOMES | Bengaluru Urban | Bengaluru East | As per the Hon`ble Authority order dated 09/08/2021 application for project registration is rejected. |
20/01/2020 | 30/08/2021 |
592 | ACK/KA/RERA/1254/465/PR/200110/003815 | PANKAJ KUMAR S | VAIBHAV NAGAR PHASE-3 | Chikballapur | Sidlaghatta | As per the Hon`ble Authority order dated 09/08/2021 application for project registration is rejected. |
10/01/2020 | 30/08/2021 |
593 | ACK/KA/RERA/1263/419/PR/200107/003801 | VIJAYPAL REDDY DAGULLA | SHRIRAM HEIGHTS | Kalaburgi | KALABURGI | As per the Hon`ble Authority order dated 09/08/2021 application for project registration is rejected. |
07/01/2020 | 30/08/2021 |
594 | ACK/KA/RERA/1263/419/PR/200107/003800 | D Vijaypal Reddy | MARUTI'S KAPILA GRAND SQUARE | Kalaburgi | KALABURGI | As per the Hon`ble Authority order dated 11/08/2021 application for project registration is rejected. |
07/01/2020 | 30/08/2021 |
595 | ACK/KA/RERA/1257/333/PR/210125/004542 | ACE DEVELOPERS | SINDHU ENCLAVE | Dakshina Kannada | DAKSHINA KANNADA | As per Hon`ble Authority order dated 09/08/2021 application for project registration is rejected. |
25/01/2021 | 26/08/2021 |
596 | ACK/KA/RERA/1268/378/PR/210118/004520 | MDGO and OEHC Society | NEST HOME | Mysore | MYSORE | As per Hon`ble Authority order dated 09/08/2021 application for project registration is rejected. |
18/01/2021 | 26/08/2021 |
597 | ACK/KA/RERA/1268/378/PR/210115/004510 | NADEEM AHMED SHARIFF | TULSI GARDENS | Mysore | MYSORE | As per Hon`ble Authority order dated 11/08/2021 application for project registration is rejected. |
15/01/2021 | 26/08/2021 |
598 | ACK/KA/RERA/1255/477/PR/201224/004466 | Puttamma | Kumar & Kawadia Arcade | Chikkamagaluru | CHIKKAMAGALURU | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
24/12/2020 | 26/08/2021 |
599 | ACK/KA/RERA/1251/446/PR/201223/004464 | sai supriya ventures | HAPPY NEST | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
23/12/2020 | 26/08/2021 |
600 | ACK/KA/RERA/1251/308/PR/201217/004451 | NESTOYA HOMES PRIVATE LIMITED | LIBERTY ACRES IV | Bengaluru Urban | Anekal | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
17/12/2020 | 26/08/2021 |
601 | ACK/KA/RERA/1251/310/PR/201209/004433 | M Jayachandra Reddy | vallabha jaganath skn | Bengaluru Urban | Bengaluru South | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
09/12/2020 | 26/08/2021 |
602 | ACK/KA/RERA/1247/295/PR/201206/004424 | RADDI BADAGI | BRUNDAVANA NAGAR | Bagalkot | JAMKHANDI | As per Hon`ble Authority order dated 09/08/2021 application for project registration is rejected. |
06/12/2020 | 26/08/2021 |
603 | ACK/KA/RERA/1248/469/PR/201205/004423 | V T Venkatesha | N I Layout | Ballari (Bellary) | BALLARI | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
05/12/2020 | 26/08/2021 |
604 | ACK/KA/RERA/1249/367/PR/201203/004413 | BHARAT MAHADEV JOGALE | MAHALAXMI LAYOUT | Belagavi (Belgaum) | CHIKODI | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
03/12/2020 | 26/08/2021 |
605 | ACK/KA/RERA/1254/464/PR/201125/004394 | AASTHA PROPERTIES | SAI GOLDEN ORCHIDS PHASE 6 | Chikballapur | Gudibanda | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
25/11/2020 | 26/08/2021 |
606 | ACK/KA/RERA/1254/464/PR/200901/004211 | AK MAXX PROPERTIES | SRI SAI AASARE-PHASE 3 | Chikballapur | Gudibanda | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
01/09/2020 | 26/08/2021 |
607 | ACK/KA/RERA/1251/446/PR/200825/004194 | JD BUILDERS | JD BLOSSOM | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
25/08/2020 | 26/08/2021 |
608 | ACK/KA/RERA/1263/419/PR/200312/003971 | MALLIKARJUN | Mallikarjun Layout Sy no-109/3 & 109/4 | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
12/03/2020 | 26/08/2021 |
609 | ACK/KA/RERA/1263/419/PR/200311/003965 | PRASHANT | Prashant Layout Sy no – 77/2 | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
11/03/2020 | 26/08/2021 |
610 | ACK/KA/RERA/1271/486/PR/200310/003962 | SHASHIKUMAR V M | SHAKTHIDHAMA PREMIUM | Shivamogga | SHIVAMOGGA | As per Hon`ble Authority order dated 13/08/2021 application for project registration is rejected. |
10/03/2020 | 26/08/2021 |
611 | ACK/KA/RERA/1276/426/PR/200309/003960 | BHEEMAREDDY MEDARGOL | Bheemreddy Layout SY no - 107/2 | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 11/08/2021 application for project registration is rejected. |
09/03/2020 | 26/08/2021 |
612 | ACK/KA/RERA/1263/419/PR/200309/003959 | BHEEMAREDDY MEDARGOL | Bheemreddy Layout Sy no-119/2 | Kalaburgi | KALABURGI | As per Hon`ble Authority order dated 11/08/2021 application for project registration is rejected. |
09/03/2020 | 26/08/2021 |
613 | ACK/KA/RERA/1271/486/PR/200229/003935 | K B JAYANNA | K B JAYANNA | Shivamogga | SHIVAMOGGA | As per Hon`ble Authority order dated 09/08/2021 application for project registration is rejected. |
29/02/2020 | 26/08/2021 |
614 | ACK/KA/RERA/1251/446/PR/200228/003932 | K SRIDHAR | S R HOMES | Bengaluru Urban | Bengaluru East | As per Hon`ble Authority order dated 09/08/2021 application for project registration is rejected. |
28/02/2020 | 25/08/2021 |
615 | ACK/KA/RERA/1249/447/PR/210112/004504 | Panchaxshri Hiremath | Trinetra Residence | Belagavi (Belgaum) | BELAGAVI | Hon’ble Authority in its court order dated 22/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
12/01/2021 | 05/07/2021 |
616 | ACK/KA/RERA/1274/352/PR/200502/004007 | Narasimha Divekar | Dodnalli S.no 7/9 | Uttara Kannada | SIRSI | Hon’ble Authority in its court order dated 09/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
02/05/2020 | 05/07/2021 |
617 | ACK/KA/RERA/1262/430/PR/201208/004429 | Chandulal Gandhi | Sri Vigneshwara Layout | Haveri | RANIBENNUR | Hon’ble Authority in its court order dated 21/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
08/12/2020 | 05/07/2021 |
618 | ACK/KA/RERA/1254/460/PR/200313/003976 | C N CHANNE GOWDA | NANDI MEADOWS | Chikballapur | Chikkaballapur | Hon’ble Authority in its court order dated 09/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
13/03/2020 | 05/07/2021 |
619 | ACK/KA/RERA/1262/430/PR/200710/004120 | Virupakshappa Makanur | Makanur Layout | Haveri | RANIBENNUR | Hon’ble Authority in its court order dated 09/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
10/07/2020 | 05/07/2021 |
620 | ACK/KA/RERA/1249/367/PR/200122/003853 | Mahammadhanif Bagwan | unique park | Belagavi (Belgaum) | CHIKODI | Hon’ble Authority in its court order dated 09/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
22/01/2020 | 05/07/2021 |
621 | ACK/KA/RERA/1263/419/PR/201023/004322 | HARSH DEVELOPERS | PRISTINE VALLEY | Kalaburgi | KALABURGI | Hon’ble Authority in its court order dated 09/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
23/10/2020 | 05/07/2021 |
622 | ACK/KA/RERA/1254/460/PR/201210/004438 | SANDEEP B | SRI RAMA KUTEERA | Chikballapur | Chikkaballapur | Hon’ble Authority in its court order dated 21/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
10/12/2020 | 05/07/2021 |
623 | ACK/KA/RERA/1254/464/PR/201109/004346 | AASTHA PROPERTIES | SAI GOLDEN ORCHIDS PHASE-6 | Chikballapur | Gudibanda | Hon’ble Authority in its court order dated 21/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
09/11/2020 | 05/07/2021 |
624 | ACK/KA/RERA/1267/374/PR/201015/004308 | KBL and SONS | SILICON CITY LAYOUT PHASE -II | Mandya | SHRIRANGAPATTNA | Hon’ble Authority in its court order dated 21/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
15/10/2020 | 05/07/2021 |
625 | ACK/KA/RERA/1248/440/PR/210225/004742 | Srinivas C | RSG Layout | Ballari (Bellary) | HOSPET | Hon’ble Authority in its court order dated 22/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
25/02/2021 | 05/07/2021 |
626 | ACK/KA/RERA/1249/367/PR/210106/004498 | ALLAUDDIN | ALLAUDDIN YAHYAKHAN NADAF | Belagavi (Belgaum) | CHIKODI | Hon’ble Authority in its court order dated 22/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
06/01/2021 | 05/07/2021 |
627 | ACK/KA/RERA/1271/486/PR/200118/003832 | MAHADEV BASAPPA DEGAVI | LAYOUT | Shivamogga | SHIVAMOGGA | Hon’ble Authority in its court order dated 09/04/2021 has rejected the grant of application for reasons uploaded in the portal. |
18/01/2020 | 05/07/2021 |
628 | ACK/KA/RERA/1251/309/PR/210122/004537 | SLV DEVELOPERS PRIVATE LIMITED | SLV ICON | Bengaluru Urban | Bengaluru North | As per Hon’ble Authority order dated 07/04/2021 rejected the grant of registration. |
22/01/2021 | 22/04/2021 |
629 | ACK/KA/RERA/1249/447/PR/201005/004279 | Panchaxshri | TRINETRA RESIDENCE | Belagavi (Belgaum) | BELAGAVI | As per Hon’ble Authority order dated 08/04/2021 rejected the grant of registration. |
05/10/2020 | 22/04/2021 |
630 | ACK/KA/RERA/1257/334/PR/200930/004267 | SIRAJ AHAMED PROP INLAND BUILDERS | INLAND BUSINESS PARK | Dakshina Kannada | MANGALORE | As per Hon’ble Authority order dated 08/04/2021 rejected the grant of registration. |
30/09/2020 | 22/04/2021 |
631 | ACK/KA/RERA/1271/486/PR/200926/004258 | RUDRESH B V | RUDRAPPA B V | Shivamogga | SHIVAMOGGA | As per Hon’ble Authority order dated 08/04/2021 rejected the grant of registration. |
26/09/2020 | 22/04/2021 |
632 | ACK/KA/RERA/1251/310/PR/200901/004213 | DURGADEVI SHELTERS | Durgadevi Shelters | Bengaluru Urban | Bengaluru South | As per Hon’ble Authority order dated 01/04/2021 rejected the grant of registration. |
01/09/2020 | 22/04/2021 |
633 | ACK/KA/RERA/1251/308/PR/200828/004208 | J P SUPREME | HIGH POINT | Bengaluru Urban | Anekal | As per Hon’ble Authority order dated 07/04/2021 rejected the grant of registration. |
28/08/2020 | 22/04/2021 |
634 | ACK/KA/RERA/1262/430/PR/200821/004192 | Shambulinga B Ballary | BALLARY EXTENSIONS | Haveri | RANIBENNUR | As per Hon’ble Authority order dated 08/04/2021 rejected the grant of registration. |
21/08/2020 | 22/04/2021 |
635 | ACK/KA/RERA/1259/410/PR/201127/004400 | GANGADHAR NAYAK | VISHNU ENCLAVE | Dharwad | DHARWAD | As per Hon’ble Authority in its court order dated 18/03/2021 rejected the application for registration. |
27/11/2020 | 05/04/2021 |
636 | ACK/KA/RERA/1268/378/PR/210101/004481 | MOHAMMED IMRAN KHAN | MERAKI | Mysore | MYSORE | As per Hon’ble Authority order dated 17/03/2021 rejected the grant of registration |
01/01/2021 | 31/03/2021 |
637 | ACK/KA/RERA/1247/295/PR/201124/004388 | MAHIBOOB H TALIKOTI | MANIYAR COLONY | Bagalkot | JAMKHANDI | As per Hon’ble Authority order dated 18/03/2021 rejected the grant of registration |
24/11/2020 | 31/03/2021 |
638 | ACK/KA/RERA/1271/486/PR/201119/004376 | T RAJESH | RAJESH T | Shivamogga | SHIVAMOGGA | As per Hon’ble Authority order dated 18/03/2021 rejected the grant of registration |
19/11/2020 | 31/03/2021 |
639 | ACK/KA/RERA/1268/378/PR/201118/004370 | ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED | Shreeshaa Hill View 5 | Mysore | MYSORE | As per Hon’ble Authority order dated 17/03/2021 rejected the grant of registration |
18/11/2020 | 31/03/2021 |
640 | ACK/KA/RERA/1263/419/PR/201117/004367 | SHRI RACHANNA | SOLAPURE LAYOUT | Kalaburgi | KALABURGI | As per Hon’ble Authority order dated 19/03/2021 rejected the grant of registration |
17/11/2020 | 31/03/2021 |
641 | ACK/KA/RERA/1268/378/PR/201117/004366 | GRAVITY ONE LIVING SPACE PVT LTD | SANVI-PHASE-III | Mysore | MYSORE | As per Hon’ble Authority order dated 17/03/2021 rejected the grant of registration |
17/11/2020 | 31/03/2021 |
642 | ACK/KA/RERA/1268/378/PR/201112/004355 | ESHA ENCLAVE | Esha Enclave | Mysore | MYSORE | As per Hon’ble Authority order dated 16/03/2021 rejected the grant of registration |
12/11/2020 | 31/03/2021 |
643 | ACK/KA/RERA/1273/318/PR/201112/004352 | VIDYULLEKHA BUILDERS AND DEVELOPERS | ADIDHAN SAIKRIPA | Udupi | UDUPI | As per Hon’ble Authority order dated 18/03/2021 rejected the grant of registration |
12/11/2020 | 31/03/2021 |
644 | ACK/KA/RERA/1263/419/PR/201112/004350 | Mohammed Vilayath Ali | BEE NEST RESIDENCY | Kalaburgi | KALABURGI | As per Hon’ble Authority order dated 16/03/2021 rejected the grant of registration |
12/11/2020 | 31/03/2021 |
645 | ACK/KA/RERA/1251/309/PR/201107/004343 | AVANTGARDE HOMES | AvantGarde One | Bengaluru Urban | Bengaluru North | As per Hon’ble Authority order dated 19/03/2021 rejected the grant of registration |
07/11/2020 | 31/03/2021 |
646 | ACK/KA/RERA/1251/308/PR/201106/004342 | P SATHYA SHEKAR | RADIANT KAIRA | Bengaluru Urban | Anekal | As per Hon’ble Authority order dated 06/03/2021 rejected the grant of registration |
06/11/2020 | 31/03/2021 |
647 | ACK/KA/RERA/1271/486/PR/201104/004338 | SIDDAPPAYYA MATHAD | SIDDAPPAYYA MATHAD | Shivamogga | SHIVAMOGGA | As per Hon’ble Authority order dated 19/03/2021 rejected the grant of registration |
04/11/2020 | 31/03/2021 |
648 | ACK/KA/RERA/1251/446/PR/201103/004336 | SRI LORVEN CONSTRUCTIONS | SRI LORVEN EMERALD | Bengaluru Urban | Bengaluru East | As per Hon’ble Authority order dated 19/03/2021 rejected the grant of registration |
03/11/2020 | 31/03/2021 |
649 | ACK/KA/RERA/1264/437/PR/201103/004331 | B Raghavendra | B. Raghavendra | Kodagu | MADIKERI | As per Hon’ble Authority order dated 19/03/2021 rejected the grant of registration |
03/11/2020 | 31/03/2021 |
650 | ACK/KA/RERA/1271/486/PR/201031/004329 | CHUNILAL SODHA | CHUNNILALJI | Shivamogga | SHIVAMOGGA | As per Hon’ble Authority order dated 17/03/2021 rejected the grant of registration |
31/10/2020 | 31/03/2021 |
651 | ACK/KA/RERA/1253/286/PR/201026/004324 | Sathyavathi | Ratnasiri Badavane | Chamrajanagar | GUNDULPET | As per Hon’ble Authority order dated 18/03/2021 rejected the grant of registration |
26/10/2020 | 31/03/2021 |
652 | ACK/KA/RERA/1263/419/PR/201022/004319 | SUYASH UDYOG PRIVATE LIMITED | MANAS GREENS | Kalaburgi | KALABURGI | As per Hon’ble Authority order dated 29/01/2021 rejected the grant of registration |
22/10/2020 | 31/03/2021 |
653 | ACK/KA/RERA/1251/446/PR/201020/004316 | K Munikrishnappa MD Sai Reniit Projects | SAI METRO CITY PHASE VII | Bengaluru Urban | Bengaluru East | As per Hon’ble Authority order dated 16/03/2021 rejected the grant of registration |
20/10/2020 | 31/03/2021 |
654 | ACK/KA/RERA/1268/378/PR/200907/004218 | RELIABLE ESTATES | RELIABLE MYSURU OXYGEN 2 | Mysore | MYSORE | As per Hon’ble Authority order dated 29/01/2021 rejected the grant of registration |
07/09/2020 | 31/03/2021 |
655 | ACK/KA/RERA/1256/327/PR/201120/004377 | Manjunatha M | Sri Balaji Layout | Chitradurga | CHITRADURGA | Hon’ble Authority in its order dated 04/03/2021 rejected the grant of application. |
20/11/2020 | 19/03/2021 |
656 | ACK/KA/RERA/1259/479/PR/201012/004295 | VIKAS RAJENDRASA PAWAR | THE EKAAKSHARA APARTMENT | Dharwad | HUBLI | Hon’ble Authority in its order dated 04/03/2021 rejected the grant of application. |
12/10/2020 | 19/03/2021 |
657 | ACK/KA/RERA/1257/334/PR/201130/004404 | MS RELIABLE SPACES PVT LTD | RELIABLE HEIGHTS | Dakshina Kannada | MANGALORE | Hon’ble Authority in its order dated 04/03/2021 rejected the grant of application. |
30/11/2020 | 19/03/2021 |
658 | ACK/KA/RERA/1251/446/PR/201204/004417 | Newdimensions Developers Private Limited | Glendale | Bengaluru Urban | Bengaluru East | As per Hon’ble Authority in its order dated 23/02/2021 application has been rejected |
04/12/2020 | 02/03/2021 |
659 | ACK/KA/RERA/1251/446/PR/201008/004288 | SANTOSH GLEN LEWIS | GLORIOUS - A2 | Bengaluru Urban | Bengaluru East | As per order dated 29/01/2021 application has been rejected |
08/10/2020 | 16/02/2021 |
660 | ACK/KA/RERA/1257/334/PR/180814/002547 | NAMKO BUILDERS | OCEAN VIEW | Dakshina Kannada | MANGALORE | As per order dated 17/11/2020 application has been rejected. |
14/08/2018 | 15/12/2020 |
661 | ACK/KA/RERA/1250/303/PR/200902/004214 | PRESTIGE HOSPITALITY VENTURES LIMITED | PRESTIGE PARK DRIVE | Bengaluru Rural | DEVANAHALLI | Required documents has not furnished, Hence Rejecting |
02/09/2020 | 25/11/2020 |
662 | ACK/KA/RERA/1270/305/PR/200729/004154 | Svamitva Landmarks | Svamitva Terravana | Ramanagara | KANAKAPURA | Required documents has not furnished, Hence Rejecting |
29/07/2020 | 25/11/2020 |
663 | ACK/KA/RERA/1251/446/PR/200612/004064 | vikyath infra | Vikyath White Meadows | Bengaluru Urban | Bengaluru East | Required documents has not furnished, Hence Rejecting |
12/06/2020 | 25/11/2020 |
664 | ACK/KA/RERA/1257/334/PR/200606/004040 | VISHWAS BUILDERS AND INFRASTRUCTURE DEVELOPERS | VISHWAS MARS | Dakshina Kannada | MANGALORE | Required documents has not furnished, Hence Rejecting |
06/06/2020 | 25/11/2020 |
665 | ACK/KA/RERA/1251/308/PR/200604/004032 | Mahendra Sivepillars LLP | M5_ECITY MALL | Bengaluru Urban | Anekal | Required documents has not furnished, Hence Rejecting |
04/06/2020 | 25/11/2020 |
666 | ACK/KA/RERA/1251/308/PR/200201/003873 | NESTOYA HOMES PRIVATE LIMITED | LIBERTY ACRES PHASE 4 | Bengaluru Urban | Anekal | Required documents has not furnished, Hence Rejecting |
01/02/2020 | 25/11/2020 |
667 | ACK/KA/RERA/1251/309/PR/190504/003268 | YUSUN ESTATES PRIVATE LIMITED | LEGACY TESORA | Bengaluru Urban | Bengaluru North | Required documents not furnished, Hence Rejecting |
04/05/2019 | 25/11/2020 |
668 | ACK/KA/RERA/1251/310/PR/200619/004083 | Relationship Properties Private Limited | Parkwest - Oak - Tower 10 | Bengaluru Urban | Bengaluru South | As per Order dated 07-10-2020, application has been rejected |
19/06/2020 | 13/10/2020 |
669 | ACK/KA/RERA/1251/310/PR/200619/004082 | Relationship Properties Private Limited | Parkwest - Pine - Tower 9 | Bengaluru Urban | Bengaluru South | As per Order dated 07-10-2020, application has been rejected |
19/06/2020 | 13/10/2020 |
670 | ACK/KA/RERA/1268/378/PR/200224/003919 | Panish H N | Mathru Shree Layout | Mysore | MYSORE | As per Order dated 15-09-2020, application has been rejected |
24/02/2020 | 13/10/2020 |
671 | ACK/KA/RERA/1251/446/PR/200121/003843 | AKHIL EDIFICE | AKHIL SANGAMA | Bengaluru Urban | Bengaluru East | As per Order dated 15-09-2020, application has been rejected |
21/01/2020 | 13/10/2020 |
672 | ACK/KA/RERA/1251/446/PR/190906/003541 | SUBRAMANY CONSTRUCTIONS | SLV ROYAL | Bengaluru Urban | Bengaluru East | As per Order dated 15-09-2020, application has been rejected |
06/09/2019 | 13/10/2020 |
673 | ACK/KA/RERA/1251/446/PR/200609/004047 | N Ravindra Reddy | RR RESIDENCY | Bengaluru Urban | Bengaluru East | As per Order dated 15-09-2020, application has been rejected |
09/06/2020 | 13/10/2020 |
674 | ACK/KA/RERA/1274/351/PR/190710/003419 | Asiya Developers | Asiya Business Park | Uttara Kannada | KARWAR | As per the Orders of Authority, promoter not filed consent of all the land owners. Hence Rejecting the application. |
10/07/2019 | 11/08/2020 |
675 | ACK/KA/RERA/1263/419/PR/180917/002631 | Apple Realty | APPLE REALTY | Kalaburgi | KALABURGI | Not produced relevant documents despite giving several opportunities. Hence, REJECTED with the liberty to re-apply for registration afresh with relevant documents. |
17/09/2018 | 14/06/2019 |
676 | ACK/KA/RERA/1262/430/PR/181023/002750 | Veerappa Basavantappa Jyothi | SKN LAYOUT | Haveri | RANIBENNUR | Not produced relevant documents even after several opportunity given. The promoter always remained absent for the hearings. Hence REJECTED with a liberty to re-apply for registration with the relevant documents. |
23/10/2018 | 14/06/2019 |
677 | ACK/KA/RERA/1251/308/PR/180825/002574 | SKR MEADOWS | SKR MEADOWS | Bengaluru Urban | Anekal | Valid approved plan as on date not produced. Several opportunities given. The promoter fails to produce. Hence REJECTED with a liberty to the promoter to apply afresh when he gets approved plan from the competent authority. |
25/08/2018 | 14/06/2019 |
678 | ACK/KA/RERA/1251/446/PR/181006/002700 | bonda radhakrishna | srk cornerstone | Bengaluru Urban | Bengaluru East | Non production of the required documents and as per the Order of the Authority dated 1st April 2019. |
06/10/2018 | 09/05/2019 |
679 | ACK/KA/RERA/1268/378/PR/181227/002925 | Ivanka Builders and Developers | Siddivinayaka layout | Mysore | MYSORE | The promoter not produced the renewed approved plan. Hence, REJECTED. |
27/12/2018 | 04/05/2019 |
680 | ACK/KA/RERA/1251/310/PR/190325/003154 | a | Test Project | Bengaluru Urban | Bengaluru South | Its is dummy project created for testing purpose. Hence the Project is Rejected |
25/03/2019 | 24/04/2019 |
681 | ACK/KA/RERA/1274/358/PR/180624/002384 | chetan kalal | renuka layout | Uttara Kannada | MUNDGOD | Since the validity of the plan has lapsed, the project is rejected |
24/06/2018 | 19/02/2019 |
682 | ACK/KA/RERA/1274/358/PR/180616/002354 | mohan kalal | RENUKA LAYOUT | Uttara Kannada | MUNDGOD | Since the validity of the plan has lapsed, the project is rejected |
16/06/2018 | 19/02/2019 |
683 | ACK/KA/RERA/1274/358/PR/180615/002351 | anil kalal | RENUKA LAYOUT | Uttara Kannada | MUNDGOD | Since the validity of the plan has lapsed, the project is rejected |
15/06/2018 | 19/02/2019 |
684 | ACK/KA/RERA/1274/358/PR/180529/002281 | rohan kalal | renuka layout | Uttara Kannada | MUNDGOD | Since the validity of the plan has lapsed, the project is rejected |
29/05/2018 | 19/02/2019 |
685 | ACK/KA/RERA/1274/350/PR/180624/002383 | vinay m kalal | RENUKA LAYOUT | Uttara Kannada | UTTARA KANNADA | Since the validity of the plan has lapsed, the project is rejected |
24/06/2018 | 19/02/2019 |
686 | ACK/KA/RERA/1271/486/PR/180706/002435 | LAKSHMAMMA | LAKSHMAMMA | Shivamogga | SHIVAMOGGA | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
06/07/2018 | 25/01/2019 |
687 | ACK/KA/RERA/1271/486/PR/180614/002348 | DASAPPA | DASAPPA | Shivamogga | SHIVAMOGGA | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
14/06/2018 | 25/01/2019 |
688 | ACK/KA/RERA/1271/486/PR/180614/002347 | SIDDAGANGAIAH | SIDDAGANGAIAH | Shivamogga | SHIVAMOGGA | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
14/06/2018 | 25/01/2019 |
689 | ACK/KA/RERA/1271/486/PR/180706/002436 | VENKATA KRISHNA T S | GANESH H , VENKATAKRISHNA AND VIJAYKUMAR | Shivamogga | SHIVAMOGGA | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
06/07/2018 | 25/01/2019 |
690 | ACK/KA/RERA/1271/486/PR/180614/002346 | RAMESH G SHET | RAMESH G SHET | Shivamogga | SHIVAMOGGA | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
14/06/2018 | 25/01/2019 |
691 | ACK/KA/RERA/1271/486/PR/180706/002437 | VISWANATH VENKATESHALU PANDITH | VISWANATH VENKATESHALU PANDITH AND LAKSHMAMMA | Shivamogga | SHIVAMOGGA | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
06/07/2018 | 25/01/2019 |
692 | ACK/KA/RERA/1271/486/PR/180706/002434 | VIJAY KUMAR H | VIJAY KUMAR H AND GANESH H | Shivamogga | SHIVAMOGGA | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
06/07/2018 | 25/01/2019 |
693 | ACK/KA/RERA/1263/419/PR/180820/002560 | MCP INFRA SERVICES AND PRODUCTS LLP | MEENAKSHI NAGAR PHASE I | Kalaburgi | KALABURGI | Since the validity of the plan has lapsed, the project is rejected |
20/08/2018 | 25/01/2019 |
694 | ACK/KA/RERA/1263/419/PR/180820/002561 | LAXMI BUILDERS AND DEVELOPERS | MEENAKSHI NAGAR PHASE II | Kalaburgi | KALABURGI | Plan validity period has lapsed, hence rejected. |
20/08/2018 | 25/01/2019 |
695 | ACK/KA/RERA/1251/310/PR/180629/002405 | GAG Builders and Developers | Classic Amrutha | Bengaluru Urban | Bengaluru South | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
29/06/2018 | 25/01/2019 |
696 | ACK/KA/RERA/1251/310/PR/180612/002335 | SAI KRISHNA DEVELOPERS | SAI KRISHNA SERENITY | Bengaluru Urban | Bengaluru South | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
12/06/2018 | 25/01/2019 |
697 | PR/KN/170831/001853 | karnataka housing Board | Bilagi | Bagalkot | BILGI | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
31/08/2017 | 19/01/2019 |
698 | PR/KN/180209/002582 | The Bangalore employees and self employees housing society Ltd | Krishna Greens Westmist | Mysore | MYSORE | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
09/02/2018 | 19/01/2019 |
699 | ACK/KA/RERA/1273/488/PR/180831/002588 | Ekadantha Builders | Ekadantha Builders | Udupi | BRAHMAVARA | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
31/08/2018 | 19/01/2019 |
700 | ACK/KA/RERA/1271/486/PR/180628/002402 | Raghavendra V | K.M.U residency | Shivamogga | SHIVAMOGGA | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
28/06/2018 | 19/01/2019 |
701 | ACK/KA/RERA/1271/486/PR/180620/002361 | Raghavendra V | KMU residency | Shivamogga | SHIVAMOGGA | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
20/06/2018 | 19/01/2019 |
702 | ACK/KA/RERA/1271/291/PR/180628/002399 | Raghavendra v | OM SHAKTHI residency | Shivamogga | BHADRAVATHI | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
28/06/2018 | 19/01/2019 |
703 | ACK/KA/RERA/1251/446/PR/180629/002406 | Shiva Shakthi Builders | ShivaShakthi Spring Fields | Bengaluru Urban | Bengaluru East | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
29/06/2018 | 19/01/2019 |
704 | ACK/KA/RERA/1251/310/PR/180816/002551 | Mantri Castles Pvt Ltd | Mantri Serenity6 | Bengaluru Urban | Bengaluru South | Your project has been Rejected on the grounds of your non presence during multiple hearings. |
16/08/2018 | 19/01/2019 |
705 | PR/KN/171229/002589 | SKR GARDENS | SKR GARDENS | Bengaluru Urban | Anekal | Your Project has been Rejected for Plan Sanction period is over |
29/12/2017 | 07/01/2019 |
706 | ACK/KA/RERA/1271/291/PR/180620/002360 | Raghavendra | OM SHAKTHI residency | Shivamogga | BHADRAVATHI | Rejected as existing plan approval has lapsed. |
20/06/2018 | 02/01/2019 |
707 | ACK/KA/RERA/1263/419/PR/180724/002483 | DHANANJAYA DEVELOPERS | DHANVANTHARIPURI PHASE – I | Kalaburgi | KALABURGI | Your Project has been rejected for non submission of relevant documents |
24/07/2018 | 02/01/2019 |
708 | ACK/KA/RERA/1251/446/PR/180724/002484 | ARKA PROJECTS | ARKA GRANDEUR | Bengaluru Urban | Bengaluru East | Your Project has been rejected for non submission of relevant documents |
24/07/2018 | 02/01/2019 |
709 | ACK/KA/RERA/1251/446/PR/180410/002159 | SJR BUILDERS AND DEVELOPERS | SJR RESIDENCY | Bengaluru Urban | Bengaluru East | Your Project has been rejected for non submission of relevant documents |
10/04/2018 | 02/01/2019 |
710 | ACK/KA/RERA/1251/308/PR/180504/002224 | RAVINDRA V | CYPRUS OAKS | Bengaluru Urban | Anekal | Your Project has been Rejected because of Non representation |
04/05/2018 | 11/06/2018 |
711 | PR/KN/171124/002446 | CV Shelters Private limited. | One World | Kolar | MALUR | Your Project has been rejected |
24/11/2017 | 05/06/2018 |
712 | PR/KN/170824/001427 | KRISHNA ENTERPRISES (HOUSING & INFRASTRUCTURES) INDIA PRIVATE LIMITED | KRISHNA SHELTON | Bengaluru Urban | Bengaluru North | Your Project is Rejected |
24/08/2017 | 05/06/2018 |
713 | PR/KN/180302/002805 | KARISHMA INFRASTRUCTURE | KARISHMA CRYSTAL | Bengaluru Urban | Bengaluru South | Your project is Rejected because of non representation |
02/03/2018 | 01/06/2018 |
714 | PR/KN/180101/002605 | Dayaar Builders & Developers | Moon Light Apartment | Belagavi (Belgaum) | BELAGAVI | Your Project is Rejected because of non payment of penalty |
01/01/2018 | 01/06/2018 |
715 | PR/KN/170906/001462 | M/S JANANI DEVELOPERS & BUILDERS | JANANI SUKHADAYI PALMS | Mysore | MYSORE | Your project is Rejected because of non representation |
06/09/2017 | 01/06/2018 |
716 | ACK/KA/RERA/1251/310/PR/180424/002193 | M/S Med India ltd | Greenland | Bengaluru Urban | Bengaluru South | Your project is Rejected because of non representation |
24/04/2018 | 01/06/2018 |
717 | ACK/KA/RERA/1251/310/PR/180407/002762 | BRL VENTURES PRIVATE LIMITED | COURTYARD | Bengaluru Urban | Bengaluru South | Your project is Rejected because of non representation |
07/04/2018 | 01/06/2018 |
718 | ACK/KA/RERA/1251/310/PR/180405/002941 | DINESH M S | BRUDAVAN SHIVAGIRI ENCLAVE PHASE -II | Bengaluru Urban | Bengaluru South | Your project is Rejected because of non representation |
05/04/2018 | 01/06/2018 |
719 | PR/KN/180331/002935 | Varahaa Developpers | VARAHAA ENCENIA | Bengaluru Urban | Bengaluru North | Your project is Rejected because of non representation |
31/03/2018 | 24/05/2018 |
720 | PR/KN/180323/002902 | Excel Dwellings India Pvt Ltd | Oxigen Phase-3 | Bengaluru Urban | Anekal | Your project is Rejected because of non representation |
23/03/2018 | 24/05/2018 |
721 | PR/KN/180310/002859 | sriven builders | sriven perel | Bengaluru Urban | Bengaluru East | Your project is Rejected because of non representation |
10/03/2018 | 24/05/2018 |
722 | PR/KN/180307/002844 | M SHANKAR | VASUDHA PARADISE | Bengaluru Urban | Bengaluru East | Your project is Rejected because of non representation |
07/03/2018 | 24/05/2018 |
723 | PR/KN/180301/002824 | sapthagiri developers | Sapthagiri Grand | Bengaluru Urban | Bengaluru East | Your project is Rejected because of non representation |
01/03/2018 | 24/05/2018 |
724 | PR/KN/180224/002806 | RAMYA SHIVAJI PAWAR | DAIMOND HILLS PHASE -II | Dharwad | DHARWAD | Your project is Rejected because of non representation |
24/02/2018 | 24/05/2018 |
725 | PR/KN/180218/002783 | M.RAMESH | Sashank Anutham | Bengaluru Urban | Bengaluru North | Your project is Rejected because of non representation |
18/02/2018 | 24/05/2018 |
726 | PR/KN/180216/002765 | saikrupa builders | Saikrupa Harmony Annexe | Bengaluru Urban | Bengaluru East | Your project is Rejected because of non representation |
16/02/2018 | 24/05/2018 |
727 | PR/KN/180214/002757 | Sai Srushti Infrastructure Private Limited | QUBE | Bengaluru Urban | Bengaluru East | May Be Rejected because of non representation |
14/02/2018 | 24/05/2018 |
728 | PR/KN/180205/002706 | T CHANDRAKUMAR | COCONUT GROOVE III | Mysore | MYSORE | May Be Rejected because of non representation |
05/02/2018 | 24/05/2018 |
729 | PR/KN/180118/002673 | Inspira Builders LLP | Premier Inspira Devangi | Bengaluru Urban | Bengaluru South | May Be Rejected because of non representation |
18/01/2018 | 24/05/2018 |
730 | PR/KN/180118/002670 | RELIABLE SPACE PRIVATE LIMITED | RELIABLE HEIGHTS | Dakshina Kannada | MANGALORE | May Be Rejected because of non representation |
18/01/2018 | 24/05/2018 |
731 | PR/KN/180111/002638 | BHOOMIKA BTB VENTURES | BHOOMIKA BTB VENTURES | Mysore | MYSORE | May Be Rejected because of non representation |
11/01/2018 | 24/05/2018 |
732 | PR/KN/180104/002603 | diamondproperties | SRI SAIKRISHNA TOWNSHIP | Bengaluru Rural | MAGADI | May Be Rejected because of non representation |
04/01/2018 | 24/05/2018 |
733 | PR/KN/171221/002555 | JASHWANTH MM (JDMEC) | JDMEC | Bengaluru Urban | Bengaluru South | May Be Rejected because of non representation |
21/12/2017 | 24/05/2018 |
734 | PR/KN/171214/002530 | Total Environment Technologies Private Limited | FILCON | Bengaluru Urban | Anekal | May Be Rejected because of non representation |
14/12/2017 | 24/05/2018 |
735 | PR/KN/171204/002487 | mahesh | govianucrescent | Bengaluru Urban | Bengaluru North | May Be Rejected because of non representation |
04/12/2017 | 24/05/2018 |
736 | PR/KN/171204/002494 | PATHI BUILDERS & DEVELOPERS | GEM HEIGHTS | Bengaluru Urban | Bengaluru South | May Be Rejected because of non representation |
04/12/2017 | 24/05/2018 |
737 | PR/KN/171128/002437 | MSR Dwellings Private Limited | MSR IRIS | Bengaluru Urban | Bengaluru East | May Be Rejected because of non representation |
28/11/2017 | 24/05/2018 |
738 | PR/KN/171116/002165 | sannamma | mandyaground | Mandya | MADDUR | May Be Rejected because of non representation |
16/11/2017 | 24/05/2018 |
739 | PR/KN/171110/002377 | Builds Worth Constructions | Sai Square | Dharwad | DHARWAD | May Be Rejected because of non representation |
10/11/2017 | 24/05/2018 |
740 | PR/KN/171108/002355 | ACCENT HOMEZ | KRUTHIKA NILAYA | Bengaluru Urban | Bengaluru South | May Be Rejected because of non representation |
08/11/2017 | 24/05/2018 |
741 | PR/KN/180119/002680 | BRINDAVAN DEVELOPERS | SHARAN ENCLAVE | Kalaburgi | KALABURGI | Your Project has been Rejected because of non payment of penalty |
19/01/2018 | 23/05/2018 |
742 | PR/KN/180118/002633 | SUGAL PROMOTERS | AMINA PARADISE | Dakshina Kannada | MANGALORE | Your Project has been Rejected because of non payment of penalty |
18/01/2018 | 23/05/2018 |
743 | PR/KN/171201/002256 | BALAJI MADHAVASHETTY | VVS ROSE GARDENS | Kolar | KOLAR | Your Project has been Rejected because of non payment of penalty |
01/12/2017 | 23/05/2018 |
744 | PR/KN/171127/002460 | Aakruti Properties & Constructions | ARISTO MARVEL | Bengaluru Urban | Anekal | Your Project has been Rejected because of non payment of penalty |
27/11/2017 | 23/05/2018 |
745 | ACK/KA/RERA/1251/446/PR/180416/002178 | AMR CONSTRUCTIONS | SRI SAI PRAGNA PARADISE | Bengaluru Urban | Bengaluru East | Your Project has been rejected |
16/04/2018 | 23/05/2018 |
746 | PR/KN/180320/002893 | S REKHA | S REKHA | Koppal | GANGAVATHI | Your Project has been Rejected because of non payment of penalty |
20/03/2018 | 21/05/2018 |
747 | PR/KN/170909/002013 | SAI RENIIT PROJECTS PVT.LTD. | SAI BLOSSOM WINDS | Bengaluru Urban | Anekal | Your Project has been Rejected because of non payment of penalty |
09/09/2017 | 21/05/2018 |
748 | PR/KN/180117/002668 | KATARIA BUILTECK PVT LTD | K B Residency | Bengaluru Urban | Anekal | Your Project has been rejected |
17/01/2018 | 19/05/2018 |
749 | PR/KN/171204/002491 | Canopy Estates (P) Ltd | Canopy Classic | Bengaluru Urban | Bengaluru East | Your Project has been Rejected because of Non representation |
04/12/2017 | 19/05/2018 |
750 | PR/KN/170831/001656 | SAJJAN BUILDERS & DEVELOPERS | GOLDEN PALMS | Kalaburgi | KALABURGI | Your Project has been Rejected because of Non representation |
31/08/2017 | 19/05/2018 |
751 | PR/KN/171109/002361 | YASHASWINI BUILDER PVT. LTD. | YASHASWINII MEADOOWS | Bengaluru Urban | Bengaluru East | Your Project has been Rejected because of non payment of penalty |
09/11/2017 | 18/05/2018 |
752 | PR/KN/180221/002744 | GRAVITY ONE LIVING SPACE PVT LTD | DIYAGREENS | Mysore | MYSORE | Your Project has been Rejected because of non payment of penalty |
21/02/2018 | 16/05/2018 |
753 | PR/KN/180111/002624 | BHUMIKA BUILDERS | BHUMIKA PREMIER | Bengaluru Urban | Bengaluru South | Your Project has been rejected |
11/01/2018 | 16/05/2018 |
754 | PR/KN/171031/002317 | Telecom ,Central Gov,IT& Public Sector Housing Co-Op Society ltd | Silver Kites | Chikballapur | Sidlaghatta | Your Project has been rejected |
31/10/2017 | 16/05/2018 |
755 | PR/KN/171016/002232 | AMBIANT VENTURES | ASSET HOMES | Bengaluru Urban | Bengaluru East | Your Project has been Rejected because of Non representation |
16/10/2017 | 16/05/2018 |
756 | PR/KN/170927/002144 | Allwin estates | Allwin BDA project | Bengaluru Urban | Bengaluru South | Your Project has been Rejected because of Non representation |
27/09/2017 | 16/05/2018 |
757 | PR/KN/170911/002059 | RainDrop Infrastructures | Miyans Green Residency | Bengaluru Urban | Anekal | Your Project has been Rejected because of Non representation |
11/09/2017 | 16/05/2018 |
758 | PR/KN/170831/001804 | MAANGALYA CONSTRUCTIONS | MAANGALYA PROSPER | Bengaluru Urban | Bengaluru South | Your Project has been Rejected because of Non representation |
31/08/2017 | 16/05/2018 |
759 | PR/KN/170831/001330 | KOLA VENKAT RAMA NAIDU | SHRIRAM SAMEEKSHA | Bengaluru Urban | Bengaluru North | Your Project has been Rejected because of Non representation |
31/08/2017 | 16/05/2018 |
760 | PR/KN/170815/001278 | NESTWELL CONSTRUCTION PVT. LTD., | STARLING NEST | Mysore | MYSORE | Your Project has been Rejected because of Non representation |
15/08/2017 | 16/05/2018 |
761 | PR/KN/171021/002250 | Vikash Tatia | Cocoon | Bengaluru Urban | Bengaluru North | Your Project has been rejected |
21/10/2017 | 04/05/2018 |
762 | PR/KN/171012/002223 | OMEGA BUILDERS | OMEGA ASTER | Bengaluru Urban | Bengaluru North | Your Project has been rejected |
12/10/2017 | 04/05/2018 |
763 | PR/KN/171011/002214 | SAI DEVELOPERS | SAI HOMES | Bengaluru Urban | Bengaluru North | Your Project has been rejected |
11/10/2017 | 04/05/2018 |
764 | PR/KN/171010/002193 | Raj | Unknown | Bengaluru Urban | Bengaluru North | Your Project has been rejected |
10/10/2017 | 04/05/2018 |
765 | PR/KN/170906/002010 | ALPS constructions | ALPS Pleasanton | Bengaluru Urban | Bengaluru South | Your Project has been Rejected because of Non representation |
06/09/2017 | 04/05/2018 |
766 | PR/KN/171011/002217 | Reddeppareddy | SAIKRUPA ENDURA | Bengaluru Urban | Bengaluru East | Your Project has been Rejected |
11/10/2017 | 25/04/2018 |
767 | PR/KN/171006/002200 | Shivalingaiah | RamaKrishna Nagar | Mandya | PANDAVAPURA | Your project has been Rejected |
06/10/2017 | 25/04/2018 |
768 | PR/KN/171003/002186 | DINESH M S | BRUNDAVAN MANJULA SUNRISE | Bengaluru Rural | RAMANAGARA | Your Project has been Rejected |
03/10/2017 | 25/04/2018 |
769 | PR/KN/170831/001930 | SVS PROPERTIES INDIA PVT LTD | LAKE MIST | Bengaluru Urban | Bengaluru North | Your Project has been Rejected |
31/08/2017 | 25/04/2018 |
770 | PR/KN/170831/001727 | S P chidananda | Spoorthy | Tumakuru | TUMKUR | Your Project has been Rejected because of non representation |
31/08/2017 | 25/04/2018 |
771 | PR/KN/170831/001708 | EQUINOX GLOBAL SHELTERS | ECO 360 AND GREATER GREENS | Bengaluru Rural | DEVANAHALLI | Your Project has been Rejected because of non representation |
31/08/2017 | 25/04/2018 |
772 | PR/KN/170831/001703 | subhash desai | CYPRUS OAKS | Belagavi (Belgaum) | BELAGAVI | Your Project has been Rejected because of non representation |
31/08/2017 | 25/04/2018 |
773 | PR/KN/170831/001632 | S. SURESH | SURYA RESIDENCY | Bengaluru Rural | KANAKAPURA | Your Project has been Rejected |
31/08/2017 | 25/04/2018 |
774 | PR/KN/170830/001662 | Fortuna Constructions India Pvt Ltd | Fortuna Krrish | Bengaluru Urban | Bengaluru East | Your Project has been Rejected because of non representation |
30/08/2017 | 25/04/2018 |
775 | PR/KN/170830/001622 | PRASHANT BUILDERS | PRASHANT REGENCY | Bengaluru Urban | Bengaluru South | Your Project has been Rejected |
30/08/2017 | 25/04/2018 |
776 | PR/KN/170824/001491 | KRISHNA ENTERPRISES (HOUSING & INFRASTRUCTURES) INDIA PRIVATE LIMITED | KRISHNA MYSTIQ (PHASE-I) | Bengaluru Urban | Bengaluru South | Your Project has been Rejected |
24/08/2017 | 25/04/2018 |
777 | PR/KN/170823/001393 | BALAJI BUILDERS AND DEVELOPERS | KRISHNA RESIDENCY | Dakshina Kannada | MANGALORE | Your Project has been Rejected because of non representation |
23/08/2017 | 25/04/2018 |
778 | PR/KN/170804/001125 | SREE MAHAVEER DEVELOPERS | SRINIVASA SUNRIDGE | Bengaluru Urban | Bengaluru South | Your Project has Been Rejected |
04/08/2017 | 25/04/2018 |
779 | PR/KN/170801/000910 | Vista spaces Estates LLP | Vista vera | Bengaluru Urban | Bengaluru South | Your Project has Been Rejected |
01/08/2017 | 25/04/2018 |
780 | PR/KN/170801/000898 | Umavathi | Hiils View Meadows | Bengaluru Urban | Bengaluru South | Your Project has been Rejected |
01/08/2017 | 25/04/2018 |
781 | PR/KN/170927/002147 | Green Shapes Developers (I) Pvt Ltd. | Anupam Lifestyle Villas | Bengaluru Urban | Anekal | You are rejected for non payment of penalty |
27/09/2017 | 20/04/2018 |
782 | PR/KN/170918/002110 | N CHANDRAPPA | SRI SAI RESIDENCY LAYOUT | Bengaluru Urban | Bengaluru South | You are rejected for non representation |
18/09/2017 | 20/04/2018 |
783 | PR/KN/170913/002066 | sri vaibhava builders | vaibhava dsilva | Bengaluru Urban | Bengaluru East | You are rejected for non representation |
13/09/2017 | 20/04/2018 |
784 | PR/KN/170913/001635 | Chengama Naidu | JCN Brundhavan Phase 1 | Bengaluru Rural | DEVANAHALLI | You are rejected for non representation |
13/09/2017 | 20/04/2018 |
785 | PR/KN/170907/002025 | Sparrow Projects India Private Limited | Sparrow Meadows | Bengaluru Urban | Bengaluru East | You are rejected for non representation |
07/09/2017 | 20/04/2018 |
786 | PR/KN/171004/002099 | shree mookabika builders & developers | THIRUMALA SUNIDHI DESIRE | Bengaluru Urban | Bengaluru South | You are rejected for non payment of penalty |
04/10/2017 | 20/04/2018 |
787 | PR/KN/170928/002177 | asritha properties | GRAND LIVING | Bengaluru Urban | Bengaluru South | You are rejected for non representation |
28/09/2017 | 20/04/2018 |
788 | PR/KN/170907/001954 | VISHHWANATH KUMAARR | Aditi PADMASHREE | Bengaluru Urban | Bengaluru North | You are rejected for non representation |
07/09/2017 | 20/04/2018 |
789 | PR/KN/170901/001965 | Shetty Builders & Developers | Vega | Dakshina Kannada | MANGALORE | You are rejected for non representation |
01/09/2017 | 20/04/2018 |
790 | PR/KN/170901/001964 | AMIGO SHELTERS PVT LTD | AMIGO LAKEVIEW | Bengaluru Urban | Bengaluru North | Your Project is Rejected |
01/09/2017 | 20/04/2018 |
791 | PR/KN/170901/001953 | nagesh reddy k c | green avenues | Bengaluru Urban | Anekal | Your project is Rejected |
01/09/2017 | 20/04/2018 |
792 | PR/KN/170901/001950 | asritha homes | elegance | Bengaluru Urban | Bengaluru South | You are rejected for non representation |
01/09/2017 | 20/04/2018 |
793 | PR/KN/170901/001946 | asritha constructions | happyliving | Bengaluru Urban | Bengaluru South | You are rejected for non representation |
01/09/2017 | 20/04/2018 |
794 | PR/KN/170901/001942 | G.M PROPERTY DEVELOPERS PRIVATE LIMITED | GM GREENNEST | Bengaluru Urban | Bengaluru South | You are rejected for non representation |
01/09/2017 | 20/04/2018 |
795 | PR/KN/170901/001880 | Elegant Properties | ELEGANT ALTIS | Bengaluru Urban | Bengaluru North | You are rejected for non representation |
01/09/2017 | 20/04/2018 |
796 | PR/KN/170831/001905 | Eeshan constructions | blossom heights | Bengaluru Urban | Bengaluru South | You are rejected for non representation |
31/08/2017 | 20/04/2018 |
797 | PR/KN/170831/001488 | P SOORYAPRABHA SHETTY | kalavara layout | Udupi | KUNDAPURA | You are rejected for non representation |
31/08/2017 | 20/04/2018 |
798 | PR/KN/170827/001358 | SRINIVASA DEVELOPERS | SAI POORNA LUXURIA | Bengaluru Urban | Bengaluru South | You are Rejected for non representation |
27/08/2017 | 20/04/2018 |
799 | PR/KN/170818/001344 | V Venture | ESSENCE | Bengaluru Urban | Bengaluru South | Your Application has been Rejected |
18/08/2017 | 20/04/2018 |
800 | PR/KN/170804/001102 | AASHISH DEVELOPER & BUILDERS | Ashish Woods | Bengaluru Urban | Anekal | Rejected for Non payment of Penalty |
04/08/2017 | 20/04/2018 |
801 | PR/KN/171027/002277 | Muhammad Abid Misbah | Zulfas Masterpiece B Block | Dakshina Kannada | MANGALORE | Your Project has been Rejected |
27/10/2017 | 06/04/2018 |
802 | PR/KN/170919/002127 | Krishna E Campus Pvt Ltd | La Palazzo Residences - Phase II | Bengaluru Urban | Bengaluru East | Your Project has been Rejected |
19/09/2017 | 29/03/2018 |
803 | PR/KN/170831/001882 | KRUSHI DEVELOPERS | KRUSHI NANDI ENCLAVE | Bengaluru Rural | DEVANAHALLI | Your Project is Rejected |
31/08/2017 | 28/03/2018 |
804 | PR/KN/170831/001891 | KRUSHI DEVELOPERS | NANDI ENCLAVE | Bengaluru Rural | DEVANAHALLI |
|
31/08/2017 | 19/03/2018 |
805 | PR/KN/170831/001871 | KRUSHI DEVELOPERS | GREEN MEADOWS GARDEN PHASE II | Bengaluru Rural | DEVANAHALLI |
|
31/08/2017 | 19/03/2018 |
806 | PR/KN/170831/001837 | KRUSHI DEVELOPERS | Green Meadows Garden | Bengaluru Rural | DEVANAHALLI |
|
31/08/2017 | 19/03/2018 |
807 | PR/KN/170801/000875 | vaishnavi projects | vaishnavi pride | Dharwad | DHARWAD |
|
01/08/2017 | 19/03/2018 |
808 | PR/KN/170801/000789 | TRANSCITY DEVELOPERS | TRANSPRAKRUTHI | Chikballapur | Sidlaghatta |
|
01/08/2017 | 19/03/2018 |
809 | PR/KN/170908/002042 | Skylark infrastructures | Skylark J.L.B Residency | Bengaluru Urban | Bengaluru South |
|
08/09/2017 | 30/01/2018 |
810 | PR/KN/170729/000132 | SANJAY | Mermit auriga | Bengaluru Urban | Bengaluru East |
|
29/07/2017 | 30/01/2018 |
811 | PR/KN/170831/001341 | Neelgund Developers & Builders Pvt. Ltd. | Woods | Dharwad | DHARWAD | Documents produced are not proper. |
31/08/2017 | 20/01/2018 |
812 | PR/KN/170831/001338 | Neelgund Developers & Builders Pvt. Ltd. | Eshan- 2 3 | Dharwad | DHARWAD | Documents produced are not proper. |
31/08/2017 | 20/01/2018 |
813 | PR/KN/170831/001709 | AMRUTH HEMANTRAJ KULKARNI | GREEN GARDENIA | Bengaluru Rural | DEVANAHALLI | Documents produced are not proper. |
31/08/2017 | 20/01/2018 |
814 | PR/KN/170831/001913 | S2 CONSTRUCTION | S2 CARNATION | Bengaluru Urban | Bengaluru East | Documents produced are not proper. |
31/08/2017 | 20/01/2018 |
815 | PR/KN/170831/001899 | Total Environment Building Systems Private Limited | After the Rain - Phase 2a | Bengaluru Urban | Bengaluru North | Documents produced are not proper. |
31/08/2017 | 20/01/2018 |
816 | PR/KN/170831/001829 | K. SWARUP KUMAR REDDY | ECO SPRINGS | Bengaluru Urban | Bengaluru East | Documents produced are not proper. |
31/08/2017 | 20/01/2018 |
817 | PR/KN/170831/001340 | Neelgund Developers & Builders Pvt. Ltd. | Serenity | Dharwad | DHARWAD | Documents submitted are not correct. |
31/08/2017 | 20/01/2018 |
818 | PR/KN/170814/001119 | INDIAN RAILWAY WELFARE ORGANISATION | RAIL VIHAR BENGALURU | Bengaluru Urban | Bengaluru North | Incomplete documentation |
14/08/2017 | 22/12/2017 |
819 | PR/KN/170807/001177 | Vista Merez | Vista Tribute | Bengaluru Urban | Bengaluru South | Incomplete documentation |
07/08/2017 | 22/12/2017 |
820 | PR/KN/170804/000963 | M/S. BLUE VALLEY PROPERTIES PVT. LTD | GREEN WOODS | Bengaluru Urban | Bengaluru North | Your file is rejected. |
04/08/2017 | 22/12/2017 |
821 | PR/KN/170802/001030 | Vista Spaces Estates LLP | Vista Highland | Bengaluru Urban | Bengaluru East | Your file is rejected. |
02/08/2017 | 22/12/2017 |
822 | PR/KN/170731/000611 | SandeepKumar S | T G Ascent | Bengaluru Urban | Anekal | Your file is rejected. |
31/07/2017 | 22/12/2017 |
823 | PR/KN/170801/000923 | Celebrity Structures India Pvt Ltd | Celebrity "yet to be name " | Bengaluru Urban | Anekal | Your file is rejected as there are no details |
01/08/2017 | 15/12/2017 |
824 | PR/KN/170731/000799 | PVA Developers | Mahathama Gandhi Nagar 5th Phase | Bengaluru Urban | Anekal | Your file is rejected as there are no details |
31/07/2017 | 15/12/2017 |
825 | PR/KN/170728/000055 | Max | MAX 11 | Bengaluru Urban | Bengaluru East | Your file is rejected as there are no details |
28/07/2017 | 15/12/2017 |
826 | PR/KN/170731/000627 | Lily Pond Properties Pvt. Ltd. | Lily Pond SKAV | Bengaluru Urban | Bengaluru North | Your file is rejected because details pertaining to ownership,revenue not provided. |
31/07/2017 | 15/12/2017 |
827 | PR/KN/170731/000736 | mehidevelopers | Aarushi Residency - ''The Rising Sun'' | Bengaluru Urban | Bengaluru North | Your file is rejected because details pertaining to ownership,revenue not provided. |
31/07/2017 | 15/12/2017 |
828 | PR/KN/170729/000323 | K Hari Karisna Reddy | DAATRI EVER GREEN | Bengaluru Urban | Anekal | Your file is rejected because details pertaining to ownership,revenue not provided. |
29/07/2017 | 15/12/2017 |
829 | PR/KN/170731/000534 | M. PUSHPA | NIBHA GREEN HEDGE | Bengaluru Rural | DEVANAHALLI | Your file is rejected because details pertaining to ownership,revenue not provided. |
31/07/2017 | 15/12/2017 |
830 | PR/KN/170731/000759 | AHP homes | AHP WOODS | Bengaluru Urban | Bengaluru East | Your file is rejected as there are no details. |
31/07/2017 | 15/12/2017 |
831 | PR/KN/170801/000573 | Celebrity Structures India Pvt Ltd | Celebrity Shelters | Bengaluru Urban | Anekal | This Project has been rejected due to non payment of registration fees and the applicant has also requested for the same. |
01/08/2017 | 01/12/2017 |
832 | PR/KN/170731/000203 | VMR CONSTRUCTIONS | VMR ROSEDALE | Bengaluru Urban | Bengaluru East | Your Project is Rejected . Detailed order follows |
31/07/2017 | 28/11/2017 |
833 | PR/KN/170731/000868 | VIKAS BUILDERS AND DEVELOPERS | vikas meadows | Bengaluru Urban | Bengaluru North | Your File is Rejected. Regards. RERA Karnataka. |
31/07/2017 | 25/11/2017 |
834 | PR/KN/170731/000904 | RJR NIRMAN PVT LTD | RJR Patel Residency | Bengaluru Urban | Bengaluru East | Your File is Rejected. Regards. RERA Karnataka. |
31/07/2017 | 25/11/2017 |
835 | PR/KN/170731/000806 | Shamveel Ahmed Bhalli | Oceanic | Uttara Kannada | BHATKAL | Your File is Rejected. Regards. RERA Karnataka. |
31/07/2017 | 25/11/2017 |
836 | PR/KN/170727/000095 | Asset Handlers Private Limited | Asset Northern Star | Bengaluru Urban | Bengaluru North | Your File is Rejected. Regards. RERA Karnataka. |
27/07/2017 | 25/11/2017 |
837 | PR/KN/170731/000740 | Amrutha Shelters P Ltd | Amrutha Heights | Bengaluru Urban | Bengaluru East | Your Project is rejected Regards RERA,Karnataka |
31/07/2017 | 23/11/2017 |
838 | PR/KN/170731/000732 | ssvrconstructions | ssvr fairy bells | Bengaluru Urban | Bengaluru North | Your project is Rejected Regards, RERA Karnataka. |
31/07/2017 | 23/11/2017 |
839 | PR/KN/170731/000702 | papaiah n | SK DAISY | Bengaluru Urban | Bengaluru South | Your project is Rejected Regards, RERA Karnataka. |
31/07/2017 | 23/11/2017 |
840 | PR/KN/170803/001083 | Balasubramanian | Prithvi orchid | Bengaluru Urban | Bengaluru South | This is a dummy entry with no payment or documents.It is rejected. |
03/08/2017 | 01/11/2017 |
841 | PR/KN/170728/000131 | Green House Developers | Lake View Towers | Bengaluru Urban | Bengaluru North | This is a dummy entry with no payment or documents.It is rejected. |
28/07/2017 | 31/10/2017 |